2005, 03-24 Permit: 05000902 Plumbing ReversalSnTlOF e�
,;,o0Va11ey
BUILDING DIVISION
11707 E Sprague Avenue Suite 106
Spokane Valley, WA 99206
Site Information Project Information
Site Address: 6604 E 8TH AVE Project Number: 05000902 Inv: 1 Issue Data: 03/24/2005
Permit Use: PLUMBING REVERSAL
Parcel Number:
35243.0102
Subdivision:
Block:
Lot:
Zoning:
UR -3 Urban Residential 3.5
Owner:
BUSHNELL, ROBERT W
Address:
4501 E 14TH AVE
SPOKANE, VALLEY, WA 99212
Building Inspector: KEVIN MYRE
Water Dist:
Applicant: BUSHNELL, ROBERT W
4501 E 14TH AVE
SPOKANE VALLEY, WA 99212 Phone: (509) 533-5288
Contact: BUSHNELL, ROBERT W
4501 E 14TH AVE
SPOKANE VALLEY, WA 99212 Phone: (509) 533-5288
Setbacks -Front: Left: Right: Rear:
Group Name:
Project Name:
Processed By: DOMPIER, DAWN PERMIT
Printed By: MIKE TURBAK Page I of I
Permits
Plumbing Permit
Contractor: OWNER
License 4: OWNER
WATER PIPING -DWV 1
$6.00
PROCESSING PEE $3500
Tola1 Permit Fee: $41 00
FOR PLUMBING INSPECTIONS CALL (509) 688-0054.
Payment Summary
Total Fees
AmountPald AmountOwin¢ Tran Date
Receipt#
Payment Amt
$41.00
$41.00 $0.00 0324/2005
766
$41,00
Processed By: DOMPIER, DAWN PERMIT
Printed By: MIKE TURBAK Page I of I
NOFIC&
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by
definition, is the property owner or an authorizetl agent of the property owner. It is the responsibility of the
applicanUpermittee that the use described on the front of this permit complies with applicable codes and that required
inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the
construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE
REQUIRED by City Code:
FOOTING -when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes.
NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane
Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable
setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines. Please verity their location prior to locating your structure. Failure to
property locate the structure may require its relocation at the owner's/permidee'a expense.
FOUNDATION -when forms and reinforcement are in place and prior to placement of concrete.
PLUMBING - after rough -in, before covering, and final.
MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final.
FRAMING- after all framing, braong and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to
concealing.
FINAL - when Complete and prior to occupancy and/or use. All permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site
plan) required by ordinance or as a Condition of approval of this permit. Items such as the installation of fire hydrants, fire department access.
on-site drainage ('208'swales), road improvements, parking and landscaping are Common requirements of a Capri plan which must be
Completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES - Final inspection required when Complete, stairs, handrails, skirting, etc. installed, and prior to occupancy;
Completed inspection record Card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover.
RIGHT-OF-WAYlAPPROACH - prior to placement of concrete/asphalt or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be Concealed by framing, drywall, concrete, etc. must
be inspected prior to Cover. Check with the Building department for -special inspections' in Conjunction with Commercial projects.
FOR INSPECTIONS
Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency.
Building, plumbing (includes interior reversals for sewer) and Road cuts for utilities or driveways, City of Spokane Valley
mechanical. City of Spokane Valley Building Division 688-0054 Public Works 688-0195 or State Dept of Transportabon
324-6000
Fannie and lnspeGons rw aedricid Anne, Sate DepaMent on Labor Penins andlncebars ran Sewer Correction. spatial Coal Undies pNvon
And lnEusNes 324-2Mp di]dW<
Pelm6 and lnapal for onsite septic system. Spokane assured Fbe spMkltt and allslatemma and palate acral swasnals6dom. spoken. Valley
XealtX dstnd 3N -lead raDeMamtment 992JiR
Slate law RCW 19122 repulrts past pnw to any earawtion Me CALL BEFORE YOU One' center mail be nolide r Call Mrorc yw dig at leaet ] wonting days In adwlrce.456edN.
PERMIT EXPIRATION AND REFUNDS
All permits shall expire by limitation and be declared void if a) work is not slatted within 180 days of obtaining a permit, or to)work is
abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether Ne work is
finished. If a permit is expired for time, a new permit may Da obtained for half the permit fee based on the value of the remainder of the work to
finish the original permit.
All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee
payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be
authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized
when an application is wtthdmwnnn or cancelled prior to the
,plan
Jreview being completed.
Owner/Agent v` Date -y����
Staff Approval Date