Loading...
2005, 03-16 Permit: 05001577 SewerSPOKANE COUNTY DEPARTMENT OF BUILDING & PLANNING SeoTvS. L1rr 1026 WEST BROADWAY AvRNoe • SPOKANE, WA 99260-0050 Site Information Project Information Site Address: 6604 E 8TH AVE Project Number: 05001577 Inv: 1 Issue Date: 3/16/2005 Total Fees Permit Use: SEWER CONNECTION - AmountOwinP Tran Date Parcel Number: 35243.0102 Payment Amt $100.00 $100.00 $0.00 Subdivision: 1273 Applicant MUELLER JACKHAMMER Block: I Lot 2 3628 E 32ND AVE SPOKANE WA 99223 Phone: (509) 993-6771 Zoning: UNK Unknown Contact: MUELLER JACKHAMMER Owner: BUSHNELL, RODERI W 3628 E32ND AVE Address: 6604 E STH AVE SPOKANE WA 99223 Phone: (509) 993-6771 SPOKANE, WA 99212-0588 Setbacks- Front: Let[: Right: Rear: Building Inspector: F PALADICHUK Water Dist: Group Name: Project Name: Permits Sewer CemrectiUn Permit Contractor: MUELLERIACKIIAMMER INC. License#: MUFLIJ1060N6 SEWEI2CONNFCTION 1 58500 PROCESSING PEE 1 $15.00 Total Penni( Fee: $100.00 FOR SEWER INSPECTIONS CALL (509) 477-3604 UTILITIES 8:30-5 00 PM MONDAY THRU FRIDAY Coll for Inspection prior to cover. ONE WORKING DAY NOTICE REQUIRED. Contractor or applicant is (u field locale and confirm the devotion and position of sewer stub prior to any other excavation Sewerstubs arc to be checked prior to connection to ensure that they have acceptable grade and arc clear and unobstructed to the main sewer. Sewer lines should be constructed to allow for gravity now front the lowest level ofthe structure This permit must be presented to the job site inspector for veri G cation. 't o locate buried cables, gas piping, water lines, cte CALI. BEFORE YOU DIC (509)456-8000. S'I'ATE LAW RCW 19122 REQUIRES TI IAT PRIOR TO ANY EXCAVATION THE "CALL BEFORE YOU DIG' CENTER DE NOTIFIED. CALL BEFORE YOU DIG AT LEAST WORKING DAYS IN ADVANCE, (509)456-8000. Spokane County Code requires the installer comply with all requirements ofthc Washington State Dept of Labor and Industries, ineludme those related to trench sufdv. Processed By: BURRIS, ROBIN PERMIT Printed By: WENDEL, GLORIA Page 1 of I Payment Summary Total Fees Amount Paid AmountOwinP Tran Date Receipt Payment Amt $100.00 $100.00 $0.00 3/16/2005 1273 $100.00 Processed By: BURRIS, ROBIN PERMIT Printed By: WENDEL, GLORIA Page 1 of I NOTICE It Is the responsibility of the applicanVpermittee to see to It that the use described on the front of this permit complies with applicable codes and requirements and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner s expense. At a minimum, the following inspections ARE REQUIRED by County Cape'. 1. FOOTING when forms and reinforcement are in place and prior to placement of concrete—all structures, including manufactured homes. NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning regulations. Typically. side and rear yard setbacks are measured from property lines, while setbacks for yards abutting streets are measured from the property line or the center line of the roadway right-of-way, whichever provides the greater setback from the center line of the roadway right-of- way. Curb lines and fence lines are not necessarily indicative of property Imes. In some residential areas, the County can own as much as 20 feet of right-of-way between your property and the actual improved street/curb. The responsibility to comply with applicable setback provisions lies solely with the permittee—neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your property Imes- Please verify their location prior to locating your structure- Failure to properly locate the structure may require Its relocation at the owner's/permittee's expense. 2. FOUNDATION - when forms and reinforcement are In place and prior to placement of concrete. 3. FRAMING - after all framing, bracing and blocking is In place, and prior to concealing. 4. INSULATION - prior to the Installation of drywall. 5. PLUMBING - after rough -in, before covering, and final. 6. MECHANICAL - rough in of piping, before covering, metal chimneys before concealment, and final. 7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. All permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit Items such as the Installation of fire hydrants, fire department access, on-site drainage ("208 swales"), road improvements, parking, and landscaping are common requirements of a permiVsite plan which must be com- pleted prior to final approval of a building or issuance of a Certificate of Occupancy. 8. MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etcinstalled, and prior to occupancy, completed inspection record card must be available on site. 9. SEWERS - prior to cover 10. RIGHT-OF-WAY/APPROACH - prior to placement of concrete, or, If gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the department for 'Special inspections' in conjunction with commercial projects. FOR INSPECTIONS: TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAV/24 HOUR NOTICE . PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS FROM MORE THAN ONE AGENCY. • Building, plumbing, mechanical and fire inspections, Department Road cuts for utilities or driveways, Division of Engineering 8 of Building 8 Planning Roads - 48-HOUR NOTICE REQUIRED 477-3675 477-3600 or State Department of Transportation • Construction in a flood plain, Division of Engineering 8 Roads 456-3000 477-3600 • Sewer connection. Division of Utilities • Electrical wiring, State Department of Labor and Industries 477-3604 324-2640 or City Public Works Department 625-6300 • On-site waste disposal system, Spokane Regional Health District 324-1560 PERMIT EXPIRATION AND REFUNDS Unless otherwise noted, this permit will be considered null and void by limitation it the work authorized by the permit is not commenced or Is stopped for a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration. At a minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within one year of the date of expiration for one-half the original fee, subject to certain limitations --please call us If you have any questions. All refund requests must be made in writing by the applicant/ permittee (shown on the reverse) no later than 180 days after the date of fee payment. Refunds of not more than 80% of the permit fee paid may be authorized when no work has been done under the permit. No refunds may be authorized more than 180 days after tee payment. MISTAKE? If you think we've made an error in processing this permit or in conducting inspections pertaining to it, or find erroneous information in the permit, please bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to the Division of Building and Code Enforcement at the below address, Spokane County Department of Building & Planning 1026 West Broadnar Avenue Spokane. WA 99260 Phnne: (509)477-3675 For: (509)477-4703 TDI): (-509)477-71.43 1 eexuu nmuc ecuo rvcajn