Loading...
2007, 06-28 Permit: 07002501 Plumbing FixturesGroup Name: Project Name: Permits Plumbine Permit Contractor: OWNFR License q: OWNER TOILETS/BIDETS 1 $600 SINKS 2 $1200 TUBS 1 $600 FLOORDRAINS 1 $600 WATER PIPING -DWV 5 $3000 PROCESSNGFFF. $35.00 "fatal Permit Fee $9z 00 FOR PLUMBING INSPECTIONS CALL (509) 688-0054. Sp0 11�� BUILDING DIVISION 11705 Sprague Avenue. Suite 106 Valley, J Spokane Valley, WA 99206 o Site Information Project Information Site Address: 6720 E 8TH AVE Project Number: 07002501 Inv: 1 Issue Date: 0628/2007 Permit Use: I TLT, 1 TUB, 1 SINKS, 3 WATER PIPING Parcel Number: 35244.0406 Subdivision: Applicant: CUNNINGHAM, AARON Block: Lot: 6720 E STH AVE SPOKANE VALLEY WA 99208 Phone: (509) 924-1687 Zoning: UR-3 Urban Rcsidentia13.5 Contact: CUNNINGHAM, AARON Owner: CUNNINGHAM, AARON 6720 F. 8TH AVE Address: 6720 E 8TH AVE SPOKANE VALLEY WA W208 Phone: (509) 924-1687 SPOKANE VALLEY WA 99208 Setbacks- Front: Lett: Right: Rear: Building Inspector: BOB BEBOUT Water Dist EAST SPOKANE Group Name: Project Name: Permits Plumbine Permit Contractor: OWNFR License q: OWNER TOILETS/BIDETS 1 $600 SINKS 2 $1200 TUBS 1 $600 FLOORDRAINS 1 $600 WATER PIPING -DWV 5 $3000 PROCESSNGFFF. $35.00 "fatal Permit Fee $9z 00 FOR PLUMBING INSPECTIONS CALL (509) 688-0054. Processed By: Main, Jodi I, PERMIT Printed By: TURBAK, MIKE Page I of I Payment Summary Total Fees $95.00 AmoumPaid $95.00 AmountOwina $0.00 Tran Date 06282007 Receipt 6 10223 Payment Amt $95.00 Processed By: Main, Jodi I, PERMIT Printed By: TURBAK, MIKE Page I of I NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicanUpermiffee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicanfs/permiffee'a or property owner's expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING -when forms and reinforcement are In place and prior to placement of concrete -all structures. Including manufactured homes. NOTE-. This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verity their location prior to locating your structure. Failure to properly locate the structure may require Its relocation at the owner s/perroffee's expense. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. PLUMBING - after rough in, before covering, and final. MECHANICAL - roughinof piping, before covering, metal chimneys before concealment, and final. FRAMING - after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are Complete, and prior to concealing. FINAL - when complete and prior to occupancy and/or use. All permits require final inspection. NOTE: In addition to Inspection of the structure, this Inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit Items such as the installation of fire hydrants, fire department access, on-site drainage ('208swales), road improvements, parking and landscaping are Common requirements of a pernifi ite plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. - MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirling, etc, installed, and prior to occupancy: completed inspection record Card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover. RIGHT-OF-WAY/APPROACH - prior to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be Concealed by framing, tlrywall, Concrete, etcmust be Inspected prior to cover. Check with the Building department for -special Inspections" In conjunction with commercial projects. FOR INSPECTIONS Please give one working bill hour notice. Different parts of your project may require permits and Inspections from more Than one agency. Builtling, plumbing (includes interior reversals for sewer) and Road cuts for utilities or driveways, City of Spokane Valley mechanical, City of Spokane Valley Building Division 688-0054 Public Works 688-0195 or State Dept of Transportation 324-6000 Pema6 and mspeprow for eltttrial w ith. slate Depadnent or Lator Permth and l napMions fix wan, Cwnecoon, Spokane County prince DIN w And Inandres aw 1.h 477]600 Perm6 and mspetlmns Ica orvelte cepa, eyzlerr¢. SpoI eeI Fre uprooter and alarm sysa.— ana"ate aCRss road mepec4mS sWkane way, Health pend 324n5W rbe Deranmenl ydu414 stale law1 W 19 nn reQmrea that an, to any ertavation the 'CALL smuts YOU DIG -pander must benrfied. Call before you Dip at least 2 fortune dI In advance, 456EOM. PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be sedated void if a) work Is not started within 180 days of obtaining a permit, or b) work Is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit. All refund requests must be made in writing by the original permittee to the Building Official no later than 188 days after the date of fee payment. 100% refunds will be granted for any fee erroneously paid or Collected. Refunds of not more than 80% of a permit fee may be authorized when no work has been done under the permit issued Refunds of not more than 80% of a plan review fee paid may be authorized when an application Is withdrawn or Cancelled prior to the plan review being completetl. Owner) Agent � _..1 Date Staff Approval Date