Loading...
2012, 07-27 Permit: SW-12001854 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12001854 Permit Issued Date: 07/27/2012 Expiration Date: Protect Description: SEWER CONNECTION Project Name: SUTTERS PH 3 Permit Type: SEWER Primary Contact: ACME EXCAVATING & SEWER BORING CO. Applicant: ACME EXCAVATING & SEWER BORING CO. Address: 6808 S LINDKE RD GREENACRES, WA 99016 Phone: (509)228-0691 Email: SITE INFORMATION• Site Address: Parcel Number: Subdivision: Assessors Description Inspection Area: Zoning: 14821 E 8TH AVE 45231.1822 VERA S150FT OF E100FT B138 EXC ST Owner. Address: Phone: Email: NEWBILL, BRANDON C & HEATHER A/RUSSELL D 14821 E 8TH AVE VERADALE, WA 99037 Water District: Vera Fire District: Spokane Valley Fire Irrigation District #15 Land Area: 15000 Square Feet CONTRACTOR INFQRMATION• General Contractor ACMEEES963LD ACME EXCVT & SEWER BORING CO 6808 S LINKE RD GREENACRES, WA 99016 509-228-0691 )DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DFTAII Processing - Utilities Utilities Permit $125.00 $25.94 $125.00 Total Fee: $150.94 CONDITIONS. CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 07/27/2012 09:44:44 Printed by: IIS APPPOOLW SP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12001854 07/27/2012 Expiration Date: INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 07/27/2012 09:44:44 Printed by: IIS APPPOOLWSP.NET v4.0