Loading...
2012, 10-12 Permit: SW-12002385 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12002385 • Permit Issued Date: yr 10/12/2012 Expiration Date: Project Description: SEWER CONNECTION Project Name: CLEMENT Permit Type: SEWER Primary Contact: COURCHAINE EXCAVATION Applicant: COURCHAINE EXCAVATION Address: 19818 E SPRAGUE GREENACRES, WA 99016 Phone: 509-928-0846 Email: SITF INFORMATION Site Address: Parcel Number: 18313E 8TH AVE 55191.0632 Subdivision: CORBIN ADDITION Assessors Description: CORBIN ADD TO GREENACRES W190FT OF 113 B28 EXC SSFT Inspection Area: Owner: MCGIVERN, JAMES R 8 ELENA Address: PO BOX 8565 SPOKANE. WA 99203 Phone: Email: Water District: Fire District: Spokane Valley Fire Consolidated Irrigation District 919 Zoning: Land Area: 125042 Square Feet CONTRACTOR INFORMATION. General Contractor COURCC'181R7 COURCHAINE EXCAVATION 19818 E SPRAGUE GREENACRES, WA 99016 509-928-0846 DETAILS; Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAIL1 Processing -Utilities Utilities Permit Total Fee: $125.00 $25.94 $125.D0 $160.94 CONDITIONS: Inside Public Transit Benefit Area Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR 8 INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 10/12201210:43:27 Printed by: IIS APPPOOLWSP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12002385 t 10/12/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER 15 TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Dale Printed 1 0/1 212 012 10:43:27 Printed by: IIS APPPOOL\ASP.NET v4.0