Loading...
2009, 06-04 Permit: 09001462 Pole Bldgc;,0, Spokane Valley° PERMIT CENTER 11703 E. Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Site Information Project Information Site Address: 18223 E 8TH AVE Parcel Number: 55191.3201 Subdivision: Block: Lot: Zoning: R-3 SF Res District Owner: BLACK REALTY INC/LANDWORKS DE Address: 721 N PINES RD SPOKANE VALLEY, WA 99206 Building Inspector: EAST Water Dist: CONSOLIDATED ID #19 1 Project Number: 09001462 Inv: 1 Issue Date: 06/04/2009 Permit Use: 40 X 30 POLE BLDG Applicant: SKI CONSTRUCTION 4719 E WINFIELD CT SPOKANE, WA 99021 Contact: SKI CONSTRUCTION 4719 E WINFIELD CT SPOKANE, WA 99021 Setbacks - Front: Group Name: Project Name: Left: Right: Phone: (509) 328-3011 Phone: (509) 328-3011 Rear: Permits Building Permit Contractor: SKI CONSTRUCTION POLE BDLG IJ -I VB Total Value: FOR BUILDING INSPECTIONS CALL (509) 688-0054. License #: SKICOL*976JB 1,200 RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBCC SURCHARGE $22,800.00 Total Permit Fee: 5363.25 $90.81 $4.50 S458.56 Payment Summary Total Fees AmountPaid AmountOwing $458.56 $458.56 $0.00 Tran Date Receipt # Payment Amt 05/26/2009 18428 S90.8I 06/04/2009 18585 $367.75 Processed By: DAVIS, JENNA Printed By: PATRICIA PRINCE Page 1 of 1 PERMIT NOTICE The ownership of a Spokane Wiley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owners expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING - when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This Inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions Iles solely with the permittee -neither the City of Spokane Valley nor Its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/pennittee's expense. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. PLUMBING - after rough -in, before covering, and final. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final. FRAMING - after all framing, blaring and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL - when complete and prior to occupancy and/or use. All permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit Items such as the installation of fire hydrants, fire department access, on-site drainage (208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy, completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover. RIGHT-OF-WAY/APPROACH - prior to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall. concrete, etc. must be Inspected prior to cover. Check with the Building department for -special inspections" in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency. Building, plumbing (includes interior reversals for sewer) and mechanical, City of Spokane Valley Building Division 688-0054 Road cuts for utilities or driveways, City of Spokane Valley Public Works 688-0195 or State Dept of Transportation 324-6000 Perrkts and Inspections for electrical wing_ Slate Department of labor PemIts and inspections for Sewer Connection. Sp&ane County Utilities D ism Md Industries 324-2640 477.3604 Remits and Inspections fon anile septic elitism. Spokane Regional Pre Sprinkler and Sar,, Systems and private access road Inspectors. Spokane Valley Health District 324.1560 Fire Deesmen' 892-4122 Slate law RCW 19.122 requires Pat calm W any excavation he 'CALL BEFORE YOU DIG' center must be notified. CaiI before you dip al leas' 2 working days in advance. 4564000. PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared void if a) work Is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit Issuance, regardless of whether the work is finished. If a permit Is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit. All refund requests must be made in writing by t originaauthorized when no work has been i�r} payment. 100% refunds will be granted f aee err•-a(>•u when an application is withdrawn or nl the p: Tis tar�tlr'or e. Owner / Agent uilding Official no later than 160 days after the date of fee sl said or llected. Refunds of not more than 80% of a permit fee may be ed. Ref ds of not more than 80% of a plan review fee paid may be authorized revie being completed. Date Staff Approval Date