2003, 04-22 Permit: 03002679 SewerSPOKANE COUNTY DIVISION OF BUILDING
AND CODE ENFORCEMENT.
1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050
Site Information
Project Information
Site Address: 6011 E 9TH AVE
SPOKANE, WA 99212
Parcel Number: 35243.0742
Subdivision: CENTRAL PARK ADD
Block: Lot:
Zoning: UR -3 Urban Residential 3.5
Owner: MCINNIS, RICK & !CINDY
Address: 6011 E9TH AVE
SPOKANE, WA 99212
Building Inspector: NONE
Water Dist:
Project Number: 03002679 Inv: 1 Issue Date:
Permit Use: SEWER CONNECTION - WOODLAWN
Applicant: KENS LANDSCAPING PREP
650114 PITTSBURG
SPOKANE WA 99217
Contact: KEN'S LANDSCAPING PREP
650114 PITTSBURG
SPOKANE WA 99217
4/22/2003
Phone: (509) 484-9339
Phone: (509)484-9339
Setbacks - Front: Left: Right: Rear:
Group Name:
Project Name:
Permits
Sewer Connection Permit Contractor: KENS LANDSCAPING PREP
License#: KENSLP*992M3
SEWER CONNECTION a 1 S85.00 PROCESSING PEE
Total Penult Fee:
FOR SEWER INSPECTIONS CALL (509) 477-3604 UTILITIES 8:30-5:061 PM MONDAY THRU FRIDAY
Call for inspection prior to cover. ONE WORKING DAY NOTICE REQUIRED.
Contractor or applicant is to field locate and confirm the elevation and position of sewer stub prior to any other excavation.
Sewer stubs are to be checked prior to connection to ensure thahthe}' have acceptable grade and are clear and unobstructed to the main sewer.
Sewer lines should be constructed to allow for gravity flow from the IowestTevel of the structure.
This permit must be presented to the job site inspector for verit`ication. To (agate buried cables, gas piping, water lines, etc.
CALL BEFORE YOU DIG, (509)456-8000.
STATE LAW RCW 19.122 REQUIRES THAT PRIOR TO ANYEXCAVATION THE "CALL BEFORE YOU DIG' CENTER BE
NOTIFIED CALL BEFORE YOU DIG AT LEAST 2 WORIGMT1 DAYS 1NADVANCE, (509)456-8000.
Spokane County Code requires the installer complywith all requirements of the Washington State Dept of Labor and Industries, including
those related to trench safety.
it. 7 . a 81 773.
515.00
$100.00
• f Payment SummdryA4 " , 'a
Total Fees AmountPakd AmountOwinr Tran Date Receipt # Payment Amt
$100.00 $100.00 $0.00 4/22/2003 2518 $100.00
Processed By: BURRIS, ROBIN
Printed By: FINTZ, FAIT}{ Page 1 of 1
PERMIT
LE
NOTICE
It is the responsibility of the applicant/permittee, not Spokane County, to sea to it that the use described on the front of this permit complies with
applicable codes and requirements and that required inspections are requested. Failure to request required inspections and obtain the necessary
approvals prior to progressing beyond the point where inspections are required may necessitate removal of certain parts al the construction at the
applicant's/permlttee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by County Code:
1. FOOTING - when forms and reinforcement are In place and prior to placement of concrete—all structures, Including manufactured homes.
NOTE: This Inspection Includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning
regulations. Typically, side and rear yard setbacks are measured from property lines, while setbacks for yards abutting streets are measured from
the property line or the center line of the roadway fight -of -way, whichever provides the greater setback from the center line of the roadway right-of-
way. Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas, the County can own as much as 20 feet of
right -o -way between your property and the actual improved street/curb. The responsibility to comply with applicable setback provisions lies solely
with the pemrittee—neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your
property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the
owner's/permittee's expense.
2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete.
3. FRAMING - after all framing, bracing and blocking Is in place, and prior to concealing.
4. INSULATION - prior to the Installation of drywall.
5. PLUMBING - after rough -in, before covering, and final.
6. MECHANICAL - rough -In of piping, before covering, metal chimneys before concealment, and final.
7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. All permits require final Inspection.
NOTE: In addition to inspection of the structure, this Inspection Includes review of site Improvements (typically depicted on the approved site plan)
required by ordinance or as a condition of approval of this permit. Items such as the Installation of fire hydrants, fire department access, on-site
drainage ("208 swales"), road Improvements, parking, and landscaping are common requirements of a permit/site plan which must be com-
pleted prior to final approval of a building or issuance of a Certificate of Occupancy.
8. MANUFACTURED HOMES - Final Inspection required when complete, stairs, handrails, skirting, etc. Installed, and prior to occupancy; completed
Inspection record card must be available on site.
9. SEWERS - prior to cover
10. RIGHT-OF-WAY/APPROACH - prior to placement of concrete, or, 11 gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be Inspected
prior to cover. Check with the department for "special Inspections" in conjunctlon with commercial projects.
FOR INSPECTIONS:
TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE .
PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS
FROM MORE THAN ONE AGENCY.
• Building, plumbing, mechanical and fire Inspections, Division
of Building and Code Enforcement
477-3676
• Construction In a good plain, Division of Engineering & Roads
477-3600
• Electrical wiring, State Department of Labor and Industries
324-2640
• On-site waste disposal system, Spokane Regional Health District
324-1560
• Road cuts for utilities or driveways, Division of Engineering &
Roads - 48-HOUR NOTICE REQUIRED
477.9600
or State Department of Transportation
456-3000
• Sewer connection, Division of Utilities
477-3604
or City Public Works Department
625-6300
PERMIT EXPIRATION AND REFUNDS
Unless otherwise noted, this permit will be considered null and vold by limitation If the work authorized by the permit Is not commenced or la stopped for
s period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration. At a
minimum an Inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within one year
of the date of expiration for one-half the original fee, subject to certain limitations—please call us If you have any questions.
All refund requests must be made In wrlting by the appllcant/permitlee (shown on the reverse) no later than 150 days after the date of fee payment.
Refunds of not more than 80% of the permit fee paid may be authorized when no work has been done under the permit. No refunds may be authorized
more than 180 days after fee payment.
MISTAKE?
If you think we've made an error In processing this permit or In conducting Inspections pertaininglo It, or find erroneous information In the permit, please
bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to
the Division of Building and Code Enforcement at the below address.
Spokane County Division of Building & Code Enforcement
1026 West Broadway Avenue
Spokane, WA 99260
Phone: (509) 477-3675 Fax: (509) 477-4703 TDD: (509) 477-7133