2008, 06-05 Permit: 08002100 Mechanical FixturesSpokane
Valley
BUILDING DIVISION
11703 E. Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Site Information
Project Information
Site Address: 6321 E 9TH AVE
Parcel Number: 35243.0463
Subdivision:
Block: Lot:
Zoning: R-3 SF Res District
Owner: BOSSIO, MICHAEL JOSEPH
Address: 6321 E 9TH AVE
SPOKANE VALLEY, WA 99212-0130
Building Inspector: SOUTH
Water Dist: EAST SPOKANE
Project Number: 08002100 Inv: 1 Issue Date: 06/05/2008
Permit Use: 1 FUEL BURNING APPLIANCE, 1 IIEAT PUMP/AIR
CONDITIONER
Applicant: AIR CONTROL 1- {EATING & A/C
7203 E NORA
SPOKANE, WA 99212
Contact: AIR CONTROL HEATING & A/C
7203 E NORA
SPOKANE, WA 99212
Setbacks - Front: Left: Right:
Group Name:
Project Name:
Phone: (509) 924-0018
Phone: (509) 924-0018
Rear:
Permits
Mechanical Permit Contractor: AIR CONTROL HEATING & A/C
GAS APPLIANCE<=100,000BT I
PROCESSING FEE
FOR MECHANICAL INSPECTIONS CALL (509) 688-0054.
License #: AIRCOHA051J6
$12.00 HEAT PUMP OR A/C 0-3 TONS 1 $12.00
$35.00
Total Permit Fee:
$59.00
Payment Summary
Total Fees AmountPaid AmountOwing
$59.00 $59.00 $0.00
Tran Date Receipt # Payment Amt
06/05/2008 14359 $59.00
Processed By: Main, Jodi L
Printed By: PATRICIA PRINCE Page 1 of 1
PERMIT
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by
definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the
applicant/permittee that the use described on the front of this permit complies with applicable codes and that required
inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the
construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE
REQUIRED by City Code:
FOOTING - when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes.
NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane
Valley Ordinance. Curb lines and fence lines are not necessarily Indicative of property lines. The responsibility to comply with applicable
setback provisions Iles solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to
properly locate the structure may require Its relocation at the owner's/permittee's expense.
FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete.
PLUMBING - after rough -in, before covering, and final.
MECHANICAL - rough -In of piping, before covering, metal chimneys before concealment, and final.
FRAMING - after all framing, bracing and blocking Is In place, rough electrical, plumbing and mechanical systems are complete, and prior to
concealing.
FINAL - when complete and prior to occupancy and/or use. All permits require final Inspection.
NOTE. In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site
plan) required by ordinance or as a condltion of approval of this permit. Items such as the installation of fire hydrants, fire department access,
on-site drainage ('208' swales), road Improvements, parking and landscaping are common requirements of a permit/site plan which must be
completed prior to final approval of a building or Issuance of a Certificate of Occupancy.
MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy:
completed Inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover.
RIGHT-OF-WAV/APPROACH - prior to placement of concrete/asphalt or, if gravel approach, after completion.
In addition to the above. any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must
be Inspected prior to cover. Check with the Building department for°special Inspections" in conjunction with commercial projects.
FOR INSPECTIONS
Please give one working day/24 hour notice. Different parts of your project may require pennits and inspections from more than one agency.
Building, plumbing (includes interior reversals for sewer) and
mechanical, City of Spokane Valley Building Division 688-0054
Road cuts for utilities or driveways, City of Spokane Valley
Public Works 688-0195 or State Dept of Transportation
324-6000
Pemtlls and inspec0ns for NacWcS whip. Stale Department of Labor Remits and Inspections for Sewer Connecfn, Spokane County Wades PMNcn
Md Industries 324-2640 477.3604
Pewits and Inspections for on -see sepec systems, Spdune Regional
Fire spnnkler and alarm systems and pnvale access road msptttinns. Spokane varier
Health Distinct 324-1560 We Department 662-4122
State law RCW 19.122 requires Wt p1or b any excavation the CALL BEFORE YOU DIG- center must. be ragged. Call before you dig al least 2 working days In advance, 4664000.
PERMIT EXPIRATION AND REFUNDS
All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is
abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is
finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to
finish the original permit.
All refund requests must be made In writing by the original permittee to the Building Official no later than 180 days after the date of fee
payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be
authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized
when an application is withdrawn or cancelled prior to the plan review being completed.
Owner / Agent Date
Staff Approval Date
J
Receipt Number: 1 E+04
Projects
Miscellaneous Items
Tender
City of Spokane Valley
Building Dept
Receipt
Customer Number
Project Nbr Inv Nbri Fee Amt Inv Am
08002100 1 1,,--$59.00„1
Total: .$59.0CC En -dm
Check Acct
Notes:
Tran Date / Time:
By:
Logon User:
Station:
Override By:
Balance CCNbr
06/05/2008 9.23.09 AM
PLPRINCE
Bldgcounter
CX_WI_14V_HwewAOUxQ8
Full
f Owrn PAID Pmt
$59.00 El
1_..._$59// $59.00
Total PAID: $59.00
Exp Dga TENDERED
s..._ , 2. q fl 08/20091 59.00
Total TENDERED:
Over /(Short)
Change
59.00
$0.00
$0.00
Printed: 06/05/2008 9:23210 AM Page 1 of I