Loading...
2011, 09-16 Permit App: 11002896 Addition, Reroof Project Number: 11002896 Inv: 1 Application Date: 9/16/2011 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: REPLACE TRUSSES W/ENGINEERED TRUSSES Contact: KHINDA,AJIT&HARDISH &ADD NEW WINDOWS Address: 1322 S PARK RD C-S-Z: SPOKANE VALLEY,WA 99212 Setbacks:Front Left: Right: Rear: Phone: (509)768-5469 Group Name: Project Name: Site Information: Plat Key: 002614 Name: SYMONS ADD District: Sout Parcel Number: 35243.0109 Block: Lot: SiteAddress: 6515 E 9TH AVE Owner:Name: KHINDA,AJIT&HARDISH Address: 1322 S PARK RD Location::CSV SPOKANE VALLEY,WA 99212 Zoning: R-3 SF Res District Water District: 020 EAST SPOKANE Hold: ❑ Area: 7,662 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 60 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Informatio6 , A • � ati , _ �, .. om t ��s.. � _ � - Review Building Plan Review Released By Originally Released: 9/16/2011 By: tmelbourn Permits: _'7A 4,,,RigaM Aiddfd6d64. . oor.d ,7f v arA r„- Building Building Permit Contractor: OWNER Firm: OWNER Phone: (000)000-0000 This Application: Total Project: Description gm Type Notes Sq Ft Valuation Sq Ft Valuation 1&2 FAMILY R-3 VB REPLACE 0 $7,500.00 0 $7,500.00 TRUSSES ADD WDWS Totals: 0 $7,500.00 0 $7,500.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $153.25 WSBCC SURCHARGE 1 SELECT $4.50 SF PLNS RVW<7999 SQ FT 1 SELECT $61.30 Permit Total Fees: $219.05 Operator: MBB Printed By: JD Print Date: 9/16/2011 Project Number: 11002896 Inv: 1 Application Date: 9/16/2011 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Plumbing Permit Contractor: OWNER Firm: OWNER Phone: (000)000-0000 Item Description Units Unit Desc Fee Amount SHOWERS 1 NUMBER OF $6.00 WATER PIPING-DWV 4 NUMBER OF $24.00 Permit Total Fees: $30.00 Notes6 .4 .n,�r; r r T xi^tri n,'i Yr: `..}1'� �;°.:.,. -. ._' «ir t;'� 'r,-��r i<F,Ga7 w„ .:- .,�. a BETTMAN'S ADDITION- LOTS 7 THROUGH 18 OF BLOCK 8;AND LOTS 9, 10, 15 AND 16 OF BLOCK 5 HAVE BEEN PULLED OUT OF THE FLOOD PLAIN.SEE PLAT FILE. Payment Summary Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $219.05 $219.05 $61.30 $157.75 Plumbing Permit $30.00 $30.00 $0.00 $30.00 $249.05 $249.05 $61.30 $187.75 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: MBB Printed By: JD Print Date: 9/16/2011 Community Development Department (Staff Use Only) Permit Center / ` >µ 11703 East Sprague Avenue, Suite B-3 PERMIT NUMBER: A zg(6 SCITY a a ` Spokane Valley, WA 99206 pokane Tel: (509) 688-0036 PERMIT FEE: Valley. Fax: 688-0037 permitcenitcenterftspokanevalleY.orq RESIDENTIAL CONSTRUCTION PERMIT APPLICATION El NEW CONSTRUCTION 0 ADDITION/REMODEL 0 ACCESSORY BUILDING 0 DECK OTHER fot--7—�� e- . „cc2- � /' - SITE ADDRESS: b S-7S — —qZ y ��6--* ASSESSORS PARCEL NO.: 35-2_4 3 , 0 O9 LEGAL DESCRIPTION: • BUILDING OWNER NAME: 4 j77 k/-►-/A.& . NAME: /1,r—l /c7-4/ ///•- )1 ADDRESS: ) ...3A. '--S -1– ^pI3 g k ,s' . Cm: j'f, �/t� l./�wee- STATE: (/f//y�� ZIP: 174W2 PHONE(Sb�) 7f <-5 / 9 FAX(.5^ j 33—`'2 -3 CELL: CONTACT NAME:// . PHONE: FAX: CELL: CONTRACTOR NAME:. , • MAILING ADDRESS: CITY: STATE: ZIP:•• PHONE: FAX: CELL: CONTRACTOR LICENSE No.: EXPIRES: CITY BUSINESS LICENSE NO.:' DESCRIBE THEdSCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: /'"'- Fyan �i ee- 7- -�e4 ,Sons.-- F./L �`n� on to ip Rau-- '4 a • k. , .. .e-c _ - ' . . :tax— eLec,,r t 7 / •i • 3 a. - ,- -. I%I4S1'+-ci`°i''' a ****YOU MUST COMPLETE THE FOLLOWING**** MARK N A IF NOT APPLICABLE Height to Peak: Dimensions: No. of Stories: Total Habitable Space: Main Floor SQ FT: Upper Floor SQ FT: Unfinished Basement SQ Finished Basement SQ FT: FT: Garage SQ FT: Deck/Covered Patio SQ Impervious Surface 30%Slopes on FT: Area: Property: No. of Bedrooms: Construction Type: Heat Source: Sewer or Septic: TOTAL COST OF PROJECT: $ -Ars', d v�- DISCLAIMER The permitted verifies,acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling,the dwelling is/will be served by potable water. 2)Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner In this transaction. 4) All construction is to be done In full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. Signature ��, , - /� Date: _/5. # Updated 1-11-11 Page 1 of 1 http://www.spoka nevalley.org/filestorage/124/938/210/948/1496/Building_Permit_-_Residential_11-11-11.doc RESIDENTIAL CI- K LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. ❑ SITE PLAN ❑ Property lines and dimensions ❑ Setbacks to property lines ❑ Direction arrow pointing North and orientation to streets ❑ Distance between buildings ❑ Proposed/existing buildings (footprint and dimensions) ❑ Right of way/easement location &sizes ❑ Utilities, septic tank/drain field locations and distances ❑ Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) ❑ Elevations(Front/Rear/Sides)with roof peak and wall height including basement: ❑ Foundation Plan (crawispace, basement or slab on grade): ❑ Footing sizes and locations ❑ Supporting wood cripple walls or beams ❑ Perimeter concrete foundation wall sizes ❑ Thickened concrete pads supporting ❑ Crawlspace ventilation beams or girder trusses ❑ Floor Plan of each level (finished or unfinished)with dimensions: ❑ Floor Joist direction, size and spacing ❑Window and door location and sizes ❑ Header, beam or concrete lintel sizes ❑Window well locations if applicable ❑ Brace wall panel locations ❑ Room usage labels ❑Water heater and furnace locations ❑ Smoke detector locations ❑ Exhaust fan locations ❑Attic and crawl space access locations ❑ Deck or concrete patio sizes and locations ❑ Fire Wall construction ❑ Roof Plan: ❑ Engineered truss direction and spacing ❑ Ridge, eave and valley lines ❑ Rafter and over frame direction, size and spacing ❑ Beam and girder size and location ❑ Wall Section Detail including: Roof ❑ Slope/roofing material/underlayment/ice dam protection ❑ Truss or rafter size, spacing &connection ❑ Sheathing size and type ❑Attic insulation/air space baffle/ventilation Ceiling ❑ Joist size and spacing ❑ Size of ceiling gypsum wall board Wall ❑ Height/top plate/stud size and spacing/sole plate ❑ Siding/exterior house wrap/anchor bolts ❑ Exterior sheathing size and type ❑ Insulation, vapor barrier, gypsum wall board Floor ❑ Joist size and spacing ❑ Sheathing or concrete floor size/insulation Foundation Wall ❑ Concrete or Masonry unit width ❑ Footing bottom to finished ground level depth ❑ Earth to wood separation distance ❑ Horizontal &vertical reinforcement if any Footing ❑ Size ❑ Reinforcement if any Radon ❑ Passive system with 6mil vapor barrier ❑Active system with 6 mil vapor barrier Miscellaneous Construction Details ❑ Deck: ❑ Floor plan/side view/dimensions ❑ Footings/post/and beam size and locations ❑ Floor Joist/decking direction, size and spacing ❑ Stairway tread rise & run and nosing ❑ Handrail/Guard height& spacing Permit Center Spol�"""� 11703 E Spraguw •e,Suite B-3 -PERMIT NUMBER: ane •Spokane Valley; ,. 99206 4000\alley° (509)688-0036 FAX:(509)688-0037 '°'PERMIT FEE: permiteenter@spokanevalley.org Community Development _Plumbing Permit Application n Commercial -btesidential SITE ADDRESS: 6.576— 9'14 )l L Building Owner n 7 T i /-i! eq Name: �- ��� orlf_i Phone:So Fax: (5Th6) 3 —G2_,Z Address: 13 S ,?JA y2,1<_ �� City: s""),0:-.4- i g JState: y/ Zip: `In ! Z_ Contractor !� ((// Name: Phone: Fax: Address: City: State: Zip: License No: City Business Lie: Contact/Project Manager: Name: Phone: #OF UNITS PLUMBING FIXTURE ON A TRAP TOILETS URINALS TUBS SHOWERS(per trap) Lav/Basins,Bar,Floor,Kitchen,Laundry,Utility,Janitor,Photo,X-ray,Food, SINKS Prep/Culinary Meat 1411 DISHWASHER CLOTHES WASHER GARBAGE DISPOSAL WATER SOFTNER FLOOR DRAIN Area,Case,Coil,Trench,Condensate ROOF DRAIN/OVERFLOW DRAINS FOUNTAIN,DRINKING WATER PIPING/DRAIN-IN WASTE Installation,Alterations,Repair,Reversals 3 WATER USING DEVICE Ice and/or Coffee maker,hose bib,steamer proofer,carbonator,swamp cooler PRIVATE SEWAGE DISPOSAL SYSTEM WATER HEATER If Gas,See Mechanical INDUSTRIAL WASTE PRETREATEMENT INCEPTORS Including traps,vents except kitchen type grease interceptors functioning as fixture traps REPAIR OR ALTERATION Water piping,drainage or vent piping ATMOSPHERIC TYPE VACUUM BREAKER BACK FLOW PROTECTIVE DEVICE Other than atmospheric type vacuum breakers MEDICAL GAS INCEPTORS ❑CASH 0 CHECK 0 VISA 0 MC EXPIRES: Card# VIN: SIGNATURE: CURRENT FEES AVAILABLE AT:http://www.spokanevalley.orq/under the quick links for Forms,Master Fee Schedule. http://www.spokanevalley.org/uploads/Community Development/Documents/Forms/Building/PlumbingPermitApplication040309.doe 41, 'vs • New project 0 Project OFka• • Previous pre-app meeting ❑ po CITI' ne Transmittal Plan revisions fl City of Spokane Valley Transmittal Date: 4.00 Community Development Friday,September 16,2011 Department 11703 E.Sprague Ave,Suite B3 Spokane Valley,WA 99206 Phone:509.688.0036 Site Address: 6515 E 9TH AVE Project Number: 11002896 Parcel Number: 35243.0109 Zoning: R-3 Water District: EAST SPOKANE Fire District: FD 01 Applicant: KHINDA, AJIT & HARDISH Owner: KHINDA, AJIT & HARDISH 1322 S PARK RD 1322 S PARK RD SPOKANE VALLEY, WA 99212 SPOKANE VALLEY, WA 99212 (509) 768-5469 e-mail: e-mail: Contact: KHINDA. AJIT& HARDISH Occupant: 1322 S PARK RD e-mail: SPOKANE VALLEY, WA 99212 (509) 768-5469 e-mail: Contractor: OWNER Arch/Engineer: ( ) - 0 e-mail: Project REPLACE TRUSSES W/ ENGINEERED TRUSSES &ADD NEW WINDOWS Description: Building Landuse Engineer Utilities Health Fire Dist Assessor CONSTRUCT DRAWINGIONS APPLICATION TDS t Please send all plan review and project comments via e-mail to the highlighted individuals. Target Date sheet For City Use Only PLUS Project Sjiökane Project Address Valle y 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.720-5240♦ Fax: 509.688.0037♦ permitcenter®spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application,we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date,we will contact you with a revised target date. rry (^ - i r Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review D Submit complete,accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. D Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. D Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date.Staff may contact you before the target date if the initial review is complete.By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete,your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3.Technical Compliance.Once an application is administratively complete,it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up.Information regarding fees and pre-construction meetings(if required)will be provided by the Permit Specialist at that time. CD-003 V-7J 06-21-11 Page 1 of 1