Loading...
2001, 09-11 Permit: 01007762 Mechanical FixturesSPOKANE COUNTY DIVISION OF BUIIDING AND CODE ENFORCEMENT 1026 WEST BROADWAY AVENUE a SPOKANE, WA 99260-0050 (509) 477-3675 Site Address: 6906 E STH AVE, 14211 EBROADWAY AVE SPOKANE, WA 00000 Parcel Number: 35244.0307 Subdivision: WOODLAWN PARK Block: Lot: Zoning: UR -3 Urban Residential 3.5 Owner: PESTRIN, JILL S & VICTOR L Address: POBOX 13635 SPOKANE, WA 9 9213-3 63 5 Building Inspector MARC STRAUB Water Dist: Mechanical Permit Project Number. 01007762 Inv: 1 Issue Date: 9/112001 Permit Use: GAS FURNACE, WATER HEATER AND 2 -PIPING Applicant: EFFICIENCY PLUS HEATING Recei t# 14211 EBROADWAY AVE 9/112001 SPOKANE, WA 99216 Phone: (509) 926-1160 Contact: EFFICIENCY PLUS BEATING AmauntPaid 14211 E BROADWAY AVE $49.00 SPOKANE, WA 99216 Phone: (509) 926-1160 Setbacks - Front: Left: Right: Rear: Group Name: Project Name: PERM$T(S) Contractor: EFFICIENCY PLUS HEATING&A/C License X: EPPICPH991P/ GAS WATER HEATER 1 $1000 GAS APPLIANCE= 100,000BT 1 $12.00 GAS PIPING 2 $2.W PROCESSING FEE $2500 Tom]Permit Pee: $49.00 FOR MECHANICAL INSPECTIONS CALL (509) 477-3675. PAYMENT SUMMARY Page 1 of I NOTES PERMIT Processed By: CUMMO4GS, KATHY Printed By: SCHNEIDER, PENNY Tran Date I L Recei t# Payment Aml 9/112001 7067 $49.00 Total Fees AmauntPaid AmountOwing $49.00 $49.00 $0.00 NOTICE It is the responsibility of the applicant/permittee, not Spokane County, to see to it that the use described on the front of this permit complies with applicable codes and requirements and that required inspections are requestetl. Failure to request required inspections and obtain the necessary approvals prior to progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permillees or property owner's expense. At a minimum, the following inspections ARE REQUIRED by County Code: t. FOOTING when forms and reinforcement are in place and prior to placement of concrete—all structures, including manufactured homes. NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning regulations. Typically, side and rear yard setbacks are measured from property lines, while setbacks for yards abutting sheets are measured tram the property line or the center line of the roadway right-of-way, whichever provides the greater setback from the center line of the roadway right-ol- way. Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas, the County can own as much as 20 feet of right-of-way between your property and the actual improved street/curb. The responsibility to comply with applicable setback provisions lies solely with the permittee—neifher Spokane County nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verity their location prior to locating your structure. Failure to properly locate the structure may require its mloctmon at the ownefs/permittee's expense. 2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. 3. FRAMING - after all framing, bracing and blocking is in place, and prior to concealing. 4. INSULATION - prior to the installation of drywall. 5. PLUMBING after rough -in, before covering, and final. 6. MECHANICAL -rough-in of piping, before covering, metal chimneys before concealment, and final. 7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. All permits require final Inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site Improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, Ore department access, onshe drainage ("208 sweles"), road Improvements, parking, and landscaping are common requirements of a permit/site plan which must be com- pleted prior to final approval of building or issuance of Certificate of Occupancy. 8, MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etc, installed, and prior to occupancy; completed inspection record card must be available on site. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the department for "special inspections" in conjunction with commercial projects. CALL 477-3675 FOR INSPECTIONS. TO INSURE PROMPT SERVICE, PLEASE GIVE 24 HOUR NOTICE. YOUR INSPECTOR IS UNDER CERTAIN CIRCUMSTANCES, PARTS OF YOUR PROJECT MAY REQUIRE INSPECTIONS FROM OTHER AGENCIES: • Road cuts for utilities or driveways, Division of Engineering 8 Roads • Sewer connection, Division of Utilities 477-3600 4T7-3604 or State Department of Transportation or City Public Works Department 456-3000 625-6300 • On-site waste disposal system, Spokane Regional Health District • Electrical wiring, State Department of Labor and Industries 324-1560 3242640 • Construction in a flood plain, Division of Engineering 8 Roads 4T7-3600 PERMIT EXPIRATION AND REFUNDS Unless otherwise noted, this permit will be considered null and void by limitation if the work authorized by the permit is not commenced or is stopped for a period of 1 B days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration. At a minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within one year of the date of expiration for one-half the original fee, subject to certain limitations—please call us if you have any questions. All refund requests must be made in writing by the applicant/perminee (shown on the reverse) no later than 180 days after he date of fee payment. Refunds of not more than 80% Of the permit fee paid may be authorized when no work has been done under the permit. No refunds may be authorized more than 11d) days after fee payment. MISTAKE? If you think we've made an error in processing this permit or in conducting Inspections pertaining to it, or find erroneous information in the permit, please bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to the Division of Building and Code Enforcement at the address found on the face of this permit. I earthy that I am the owner or am authorized by the owner to make this application and that I have examined this permiUapplicatton, state that the information contained in it and submitted by me or my agent to compile Said permit/application is true and correct, and authorize Spokane County to proceed with processing. In addition, I have read and understand the INSPECTION REQUIREMENTS/NOTICE provisions included herein and agree to comply with same. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. I understand that the issuance of this permi lapplication and any subsequent inspection approvals or Certificates of Occupancy shall not be construed to give authority to violate or cancel the provisions of any state or local law regulating construction or agreement concerning this property, or as a warranty of conformance with the provisions of any state or local laws regulating construction. SIGNATURE OF APPLICANT/PERMITTEE APPLICATION OR AUTHORIZED AGENT — _____ DATE