2004, 03-05 Permit: 04001040 SewerSPOKANE COUNTY
f'! DEPARTMENT OF BUILDING & PLANNING
$roAS`UH.'�TY 1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050
Site Information Project Information
Site Address:
6910 E81HAVE
SPOKANE, WA 99212
Parcel Number:
35244.0306
Subdivision:
WOODLAWN PARK
Block:
Lot:
Zoning:
RMH
Owner:
MCMANNUS
Address:
6910 E8TH AVE
881
SPOKANE, WA 99212
Building Inspector:
NONE
Water Dist
Project Number: 04001040 Inv: 1 Issue Date: 3/5/2004
Permit Use: SEWER CONNECTION- WOODLAWN
Applicant NORMS EXCAVATING
P.O. BOX 574
VERADALE, WA 99037 Phone: (509) 928-0580
Contact NORM'S EXCAVATING
P.O. BOX 574
VERADALE, WA 99037 Phone: (509) 928-0580
Setbacks -Fronb Left: Right: Rear.
Group Name:
Project Name:
Permits
Sewer Conneetion Permit Conleartor. NORM'S EXCAVXIING INC license#: NORMSE197213M
SEWERCONNECTION 1 S85.00 PROCESSINGFEE $15.00
Total Permit Fee: Simon
FOR SEWER IN SPEC TIONS CALL (509) 477-3604 UITLITTES 8:30-5:00 PM MONDAY THRU FRIDAY
Call for inspection prior to cover. ONE WORKING DAY NOTICE REQUIRED.
Contractor or applicant is to field locale and confirm the elevation and position of sewer stub prior to any other excavation.
Sewer stubs are to be checked prior to connection to ensure that they have acceptable grade and are clear and unobstructed to the main
sewer. Sewer lines should be constructed to allow for gravity flow from the lowest level of the structure.
This permit must be presented to the job site inspector for verification. To locate buried cables, gas piping, water lines, etc.
CALL BEFORE YOU DIG, (509)156-8000.
STATE LAW RC W 19.122 REQUIRES THAT PRIOR TO ANY EXCAVATION THE "CALL BEFORE YOU DIG" CENTER BE
NOTIFIED. CALL BEFORE YOU DIG AT LEAST 2 WORKING DAYS IN ADVANCE, (509)156-8000.
Spokane County Code requires the instiller comply with all requimmenls of the Washington State Dept of Labor and Industries,
including those related to trench safety.
FILE
Processed By: BUMS, ROBIN COPY
Printed By: CARVER LAURIE Page 1 of 1
Payment Summary
Total Fees
AmomorPaid
AmouttOwine
Train Date
Receipt
Payment A.
$100.00
$100.00
$0.00
3/5/2004
881
$100,00
FILE
Processed By: BUMS, ROBIN COPY
Printed By: CARVER LAURIE Page 1 of 1
NOTICE
Itis the responsibility of the appllcant/permatee to see to It that the use described on the front of this permit complies with applicable codes and
requirements and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permitme's
or properly owner's expense. At a minimum, the following inspections ARE REQUIRED by County Code:
1. FOOTING - when forms and reinforcement are In place and prior to placement of concrete—all structures, including manufactured homes.
NOTE: This Inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning
regulations. Typically, side and rear yard setbacks are measured from property lines, while setbacks for yards abutting streets are measured from
the propedy line or the center line of the roadway right-of-way, whichever provides the greeter setback from the center line of the roadway right-of-
way. Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas, the County can own as much as 20 feet of
rightof-way between your properly and the actual improved street/curb. The responsibility to comply with applicable setback provisions lies solely
with the permittee—neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your
property lines. Please verity their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the
owner 's/permittee's expense.
2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete.
3. FRAMING - after all framing, bracing and blocking is in place, and prior to concealing.
4. INSULATION - prior to the installation of drywall.
5. PLUMBING - after rough -in, before covering, and final.
6. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final.
7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. All permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan)
required by ordinance or as a condition of approval of this permit. Items such as the Installation of fire hydrants, fire department access, on-site
drainage ("208 swales"), road improvements, parking, and landscaping are common requirements of a perinclote plan which must be com-
pleted prior to final approval of a building or issuance of a Certificate of Occupancy.
8. MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, eta Installed, and prior to occupancy, completed
inspection record card must be available on site.
9. SEWERS - prior to cover
10. RIGHT-OF-WAV/APPROACH - prior to placement of concrete. or, If gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected
priorto cover. Check with the department for "special inspections" in conjunction with commercial projects.
FOR INSPECTIONS:
TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAV/24 HOUR NOTICE .
PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS
FROM MORE THAN ONE AGENCY.
Building, plumbing, mechanical and fire inspections, Department • Road cuts for utilities or driveways, Division of Engineering &
of Building & Planning Roads - 48-HOUR NOTICE REQUIRED
477-3675 477-3600
or State Department of Transportation
Construction in a flood plain, Division of Engineering & Roads 456-3000
477-3600
• Sewer connection, Division of Utilities
Electrical wiring, State Department of Labor and Industries 477-3604
324-2640 or City Public Works Department
625-6300
On-site waste disposal system, Spokane Regional Health District
324-1560
PERMIT EXPIRATION AND REFUNDS
Unless otherwise noted this permit will be considered null and void by limitation If the work authorized by the permit Is not Commenced or is stopped for
a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration. At a
minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within one year
of the date of expiration for one-half the original fee, subject to certain limitations—please call us if you have any questions.
All refund requests must be made In writing by the applicam/permume (shown on the reverse) no later than 180 days after the date of fee payment.
Refunds of not more than 80%of the permit fee paid may be authorized when no work has been done under the permit No refunds may be authorized
more than 180 days after fee payment.
MISTAKE?
If you think we've made an error in processing this permit or in conducting inspections pertaining to it, or find erroneous information in the permit, Please
bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to
the Division of Building and Code Enforcement at the below address.
Spokane County Department of Building & Planning
1026 Nest Broadway Avenue
Spokane, WA 99260
Ph,,,,: (509) 477-3675 Fac (509) 477-4703 TDD: (509) 477-7131 LOkAIlrnS Rlll s Lna'Foull