2003, 06-09 Permit: 03004020 SewerSPOKANE COUNTY DIVISION OF BUILDING
AND CODE ENFORCEMENT
1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050
Site Information Project Information
Site Address:
6911 ESTHAVE
SPOKANE, WA 99212
P.r el Number:
35241.3211
Subdivision:
EMPIRE IIEIGI ITS ADD
Black:
Lot
Zoning:
UNK Unknown
Owner:
BARKER, DAVE
Address:
6911 E8THAVE
3575
SPOKANE, WA 99212
Building ho,ar,tm:
NONE
Water Dist
Project Number: 03004020 Inv: 1 Issue Date: 6/9/2003
Permit Use: SEWER CONNECTION- WOODLAWN
Applicant: NORM'S EXCAVATING
P.O. BOX 574
VERADALE, WA 99037 Phone. (509) 928 0390
Contact: NORMS EXCAVATING
P.O. 13OX 574
VERADALE. WA 99037 Phone: (509) 928-0580
Setbacks- Front: Left: Right: Be.,:
Group Name:
Project Name:
Permits
tierce, Connection Permit Cantractor: NORM'SE.XCAVATINGINC Ltunse#: NORMSEI972BM
SEWER CONNECTION 1 $8500 PROCESSING FEE St500
'raml Permit Fee: $100.00
FOR SEWER INSPECTIONS CALL (509) 477-3604 UTI ITIES 8.30-5:00 PM MONDAY TNLU FRIDAY
Call for inspection prior to coves. ONE WORKING DAY NOTICE REQUIRED.
Contractor or applicant is to field locate and centum the elevation and position ofsewer stub prior to any other st cavalion.
Sewer stubs are to be checked prier to connection to ensure that they have acceptable grade and are clear and unobstructed to the main sewer.
Sewer lines should be constructed to allow for gravity flow Fort the lowest level Ltha structure.
'Phis permit most be presented to thejob siteinspector for verification. To locate buried cables, gas piping, water lines, etc.
CALL 131P;OR13 YOU DIG, (509)456-8000.
STATE LAW RCW 19.122 REQUIRES THAT PRIOR TO ANY EXCAVATION THE "CALL BEFORE YOU DIO" CENTER BE
NOTIFIED. CALL BEFORE YOU DIG AT LEAST 2 WORKING DAYS IN ADVANCE, (509)1563000.
Spokane County Code requires the installer comply with all requirements ofthe Washington State Dept of Labor and Industries_ including
Processed By: SHATTO, IULIE PERNUT
Printed By: WENDEL, GLORIA Page 1 of 1
Payment Summary
Total Fees
Amn mffind
AmauntO vine
Tran Data
Receipt
Payment Amt
S10000
$100.00
$0.00
6/9/2003
3575
$100.00
Processed By: SHATTO, IULIE PERNUT
Printed By: WENDEL, GLORIA Page 1 of 1
NOTICE
It is the responsibility of the appliea bpermlttee, not Spokane County, to see to it that the use described on the front of this permit complies with
applicable codes and requirements and that required inspections are requested- Failure to request required inspections and obtain the necessary
approvals prior to progressing beyond the point where Inspections are required may necessitate removal of certain parts of the construction at the
app hnot'a/peents,. s or property owner's expense. At a minimum, the following inspections ARE REQUIRED by County Code:
1. FOOTING - when farms and reinforcement are in place and prior to placement of concrete—all structures, including manufactured homes.
NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning
regulations- Typically, side and rear yard setbacks are measured from property lines, while setbacks for yards abutting streets are measured from
the property line or the center line of the roadway right of -way, whichever provides the greater setback from the center line of the roadway right-of-
way. Curb lines and fence lines are net necessarily Indicative of property lines. In some residential areas, the County can own as much as 20 feet of
right-of-way between your property and the actual improved stmeVcurb. The responsibility to comply with applicable setback provisions lies solely
with the permittee—neither Spokane County nor Its authorized representatives assume any responsibility for the verification or location of your
property Imes. Please verily their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the
owner'scha mlttee's expense -
2. FOUNDATION - when terms and reinforcement are in place and prior to placement of concrete.
3. FRAMING - after all framing, bracing and blocking is in place, and prior to concealing.
4. INSULATION - prior to the installation of drywall.
5. PLUMBING - after rough -in, before covering, and final.
6. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final.
7. FINAL - when complete and prior to Occupancy and/or use. Please provide 24 hours notice. Al permits require final Inspection.
NOTE: In addition to inspection of the structure, this Inspection Includes review of site improvements (typically depicted On the approved site plan)
required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site
drainage ("208 swales"), road improvements, parking, and landscaping are common requirements Of a permillate plan which must be com-
pleted prior to final approval of a building or issuance of a Certificate of Occupancy -
8. MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prier to Occupancy; completed
inspection record card must be available on site.
9. SEWERS - prior to cover
10. RIGHT-OF-WAY/APPROACH - prier to placement of concrete, or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., most be inspected
prior to cover. Check with the department for "special inspections' in conjunction with commercial projects.
FOR INSPECTIONS:
TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE .
PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS
FROM MORE THAN ONE AGENCY.
• Building, plumbing, mechanical and fire inspections, Division • Road cuts for utilities or driveways, Division of Engineering &
of Building and Code Enforcement Roads - 08 -HOUR NOTICE REQUIRED
477-3675 477-3600
or Stam Department of Transportation
• Construction In a flood plain, Division of Engineering & Roads 456-3000
477-3600
• Sewer connection, Division Of Utilities
• Electrical wiring, State Department of Labor and Industries 477-3604
324-2640 or City Public Works Department
625-6300
• On-site waste disposal system, Spokane Regional Health District
324-1560
PERMIT EXPIRATION AND REFUNDS
Unless otherwise noted, this permit will be considered null and void by limitation it the work authorized by the permit is not commenced or is slapped for
a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration. At a
of the man
inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within one year
of the dale of expiration for one -hall the original (ee, subject to certain limitations—please pall us it you have any questions.
All refund requests must be made in writing by the applicant/permittee (shown on the reverse) no later than 180 days after the data of fee payment.
Refunds of not more than 80% of the permit fee paid may be authorized when no work has been done under the permit. No refunds may be authorized
more than 180 days after fee payment.
MISTAKE?
If you think we've made an error m processing this permit or in conducting Inspections pertaining to It, or find erroneous Information In the permit, please
bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to
the Division of Building and Code Enforcement at the below address.
Spokane County Division of Building & Code Enforcement
1026 Wes! Broadway Avenue
Spokane, WA 99260
Phone: (509) 477-3675 Fee: (509) 4774703 TDD: (509) 477-7133