Loading...
2005, 03-03 Permit: 05000625 Plumbing FixturesSiii ka ce\3/4' .i.0Ualley BUILDING DIVISION 11707 E Sprague Avenue Suite 106 Spokane Valley, WA 99206 Site Information Project Information Site Address: 7006 E 9TH AVE Parcel Number: 35244.0630 Subdivision: Block: Lot: Zoning: UNK Unknown Owner: GERKEN, GORDON B Address: 7006 E 9Th AVE SPOKANE, WA 99212-0179 Building Inspector: KEVIN MYRE Water Dist: Project Number: 05000625 Inv: 1 Issue Date: 03/03/2005 Permit Use: TOILET, TUB, SINK, DISHWSHR, CLTHSWSHR, ELEC HWT & 2-WTR US DEV Applicant: FAUCETS N STUFF 12205 E 1ST AVE SPOKANE, WA 99206 Phone: (509) 924-8881 Contact: FAUCETS N STUFF 12205 E IST AVE SPOKANE, WA 99206 Phone: (509) 924-8881 Setbacks-Frbnt: Left Right: Rear: Group Name: Project Name: Permits Plumbing Permit Contractor: FAUCETS N STUFF LLC License1h FAUCENS023LQ TOILETS/BIDETS TUBS CLOTHES WASHER WATER USING DEVICES FOR PLUMBING INSPECTIONS CALL (509) 688-0054. 1 $6.00 SINKS 1 $6.00 DISH WASHERS 1 $6.00 ELECTRIC HQT WATER TANK 2 $12.00 PROCESSING FEE Total Permit Fee: $6.00 $6.00 $6.00 $35.00 $83.00 Payment Summary Total Fees AmountPaid AmountOwinv $83.00 $83.00 Processed By: KATHY CUMMINGS Printed By: MIKE TURBAK S0.00 Tran Date Receipt N Payment Amt 03/03/2005 Page 1 of 1 508 $83.00 PERMIT NOTICE The ownership of a Spokane Valley Development Permit will Inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING -when forms and reinforcement are In place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This Inspection Includes review of the structure's setback from property lines. Minimum setbacks are established by CIty of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply w4th applicable setback provisions lies solely with the permittee -neither the CIty of Spokane Valley nor Its authorized representatives assume any . responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. PLUMBING - after rough -in, before covering, and final. MECHANICAL - rough -In of piping, before covedng, metal chimneys before concealment, and final. FRAMING - after all framing, bracing and blocking is In place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL - when complete and prior to occupancy and/or use. All permits require final Inspection. NOTE: In addition to Inspection of the structure, this Inspection Includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permiL Items such as the Installation of fire hydrants, fire department access, on-site drainage 6208' swales), road improvements, parking and landscaping are common requirements of a perniUsite plan which must be completed prior to final approval of a building or Issuance of a Certificate of Occupancy. • MANUFACTURED HOMES- Final Inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy; completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover. RIGHT-OF-WAY/APPROACH - prior to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must be inspected prior to cover. Check with the Building department for %pedal Inspections- in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and Inspections from more than one agency. Building, plumbing (includes interior reversals for sewer) and mechanical, CIty of Spokane Valley Building Division 688-0054 Road cuts for utilities or driveways, City of Spokane Valley Public Works 688-0195 or State Dept of Transportation 324-6000 Pends and Inspections for eiecinwl wiring, Stale Department of fetor Permits and Inspections for sewer cpmecon. Spokane Ccunly UtirOes DlWAon Md mdusMes 324-2640 477.3604 Remits and Inspections for on-site sepdc syalerr. Spokane Regional Fire sprinkle( and alarm systems and private access road inspections. Spokane Valley Health PSNd 324-1560 Fire Department 092-4122 Stale law ROW 19.122 requires that pip to any excavation the 'CALL BEFORE YOU DIG' center must be nollfled. call before you drg al least 2 working days In advance. 456-8000. PERMIT EXPIRATION AND REFUNDS Alt permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit. or b) work Is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished. If a permit Is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit. All refund requests must be made In writing by the original permittee to the Building Official no later than 180 days after the date of fee payment. 100% refunds will be granted for any fee erroneously pald or collected. Refunds of not more than 80% of a permit fee may be authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized when an application is withdrawn or cancelled prior to the plan review being completed. Owner / Agent Date 3- 3 - Staff- Staff Approval Date