2010, 03-17 Permit: 10000727 DemolitionStiokane
Valley
PERMIT CENTER
11703 E. Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
1
Site Information
Project Information
Site Address: 7102 E 9TH AVE
Parcel Number: 35244.0708
Subdivision:
Block:
Lot:
Zoning: R-3 SF Res District
Owner: SMITH, PEGGY J
Address: 27372 EMBASSY
SUN CITY, CA 92586
Building Inspector: SOUTH
Water Dist: EAST SPOKANE
Project Number: 10000727 Inv: 1 Issue Date: 03/17/2010
Permit Use: DEMOLITION OF OUT BUILDING & LAUNDRY ROOM
Applicant: SMITH, PEGGY J
27372 EMBASSY
SUN CITY, CA 92586
Contact: SMITH, PEGGY J
27372 EMBASSY
SUN CITY, CA 92586
Setbacks - Front: Left:
Group Name:
Project Name:
Right:
Phone: (509) 893-2609
Phone: (509) 893-2609
Rear:
1 Permits
Demolition Permit Contractor: OWNER
License #: OWNER
WSBCC SURCHARGE
S4.50 DEMOLITION ACCESSORY
Total Permit Fee:
2 $42.00
$46.50
Payment Summary
Total Fees AmountPaid AmountOwing
$46.50 $46.50 $0.00
Tran Date Receipt # Payment Amt
03/17/2010 22075 $46.50
Processed By: Main, Jodi L
Printed By: MORRIS, HEATHER Page 1 of 1
PERMIT
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by
definition, is the property owner or an authorized agent of the property owner. II is the responsibility of the
applicanUpermittee that the use described on the front of this permit complies with applicable codes and that required
inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the
construction at the applicant's/permittee's or property owners expense. At a minimum, the following inspections ARE
REQUIRED by City Code:
FOOTING - when fors and reinforcement are in place and prior to placement of concrete -all structures, Including manufactured homes.
NOTE: This Inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane
Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable
setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines. Please verily their location prior to locating your structure. Failure to
properly locate the structure may require Its relocation at the owner s/permittee's expense.
FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete.
PLUMBING - after rough -in, before covering, and final.
MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final.
FRAMING - after all framing, bradng and blocking Is in place, rough electrical, plumbing and mechanical systems are complete, and prior to
concealing.
FINAL - when complete and prior to occupancy and/or use. All pen -rifts require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this peril Items such as the installation of fire hydrants, fire department access,
on-slte drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be
completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etc. Installed, and prior to occupancy:
completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover.
RIGHT-OF-WAY/APPROACH - prior to placement of concrete/asphalt or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must
be inspected prior to cover. Check with the Building department for "special Inspections" in conjunction with commercial projects.
FOR INSPECTIONS
Please give one working day/24 hour notice. Different parts of your project may require permits and Inspections from more than one agency.
Building, plumbing (includes interior reversals for sewer) and
mechanical, City of Spokane Valley Building Division 688-0054
Road cuts for utilities or driveways, City of Spokane Valley
Public Works 688-0195 or State Dept of Transportation
324-6000
Pewits aro Inspections for electrical wiring. Stale Department 01 Labor Pmrls and inspections for Sewer Connection. Spokane Cauny Utilities Division
NN Industries 324-2640 477.3604
Remits and inspection to on-site septic system. Spokane Regional Fire spdnkter and alarm systems and payola access road lnspCtiona. Spokane valley
Health District 324.1660 Fire Depart -rent 992.5122
Slate law RCW 19.122 requires hal prior o any ewe valion the 'GALL BEFORE YOU DIG' center must be notified. can before wit Ng at least 2 working days In advance. 456-0000.
PERMIT EXPIRATION AND REFUNDS
All permits shall expire by limitation and be declared void it a) work is not started within 180 days of obtaining a permit, or b) work is
abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is
finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to
finish the original permit
All refund requests must be made In writing by the original permittee to the Building ORclal no later than 180 days after the date of fee
payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be
authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized
when an application is withdrawn or cancelled prior to the plan review being completed.
Owner / Agent _9.--C4--C-1
Date 3 - / % -/O
Staff Approval Date