2006, 09-08 Permit: 06006347 SewerSPOKANE COUNTY
yy_p� DEPARTMENT OF BUILDING & PLANNING
S D�ffC 1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050
Site Information Project Information
Site Address: 7011 E 8TH AVE
Parcel Number:
352413214
Subdivision:
EMPIRE. I[EIGHTS ADD
Block:
8 Lot: 3536
Zoning:
UNK Unknown
Owner:
GRAHAM, BRYAN'I T
Address:
7011 E 8TH AVE
$10000
SPOKANE, WA 99202
Building Inspector:
9/82006
Water Dist:
$100.00
Project Number: 06006347 Inv: 1 Issue Date: 9/8/2006
Permit Use: SEWER CONNECTION - WOODL.A WNMEVERLY HILLS
Applicant: GRAHAM, BRYANT T
7011 E 8TH AVE
SPOKANE, WA 99202
Contact: GRAIIAM,BRYANT"I'
7011 ESTUAVE
SPOKANE, WA 99202
Setbacks - Front: Left: Right:
Croup Name:
Project Name:
Phone: (509) 217-2624
Phone: (509)217-2624
Rear:
Permits
Sewer Connection Permil Contractor: OWNER License M: OWNER
WWFR CONNECI[ON 1 $8500 PROCINSINGFEE 1 $1500
Total Permit Fee: $100,00
FOR SEWER INSPECTIONS CALL THP UTILITIES DEPT AT (509) 477-3604 FROM 830-5:00 MONDAY -FRIDAY PRIOR FO
COVER_ ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINI[ fE INSPECTION. ADDITIONAL.
INSPECTION FEES APPLY AFTER 30 MINUTES
THF. INS'I A.LER IS RESPONSIBLE TO INSURE A.1. WASTEWATER DRAINS ARE CONNEC'TED'10 DIE SEWER AND
MAYBE REQUIRED TO PERFORM 'I'ESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM HIE
ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER I'XCAVA'I ION.
SEWER S TUBS ARE TO BE CHECKED PRIOR 10 CONNECTION TO ENSURE THAT THEY HAVE ACCEPI ABLE GRADE
AND ARE CLEAR AND UNOBSTRUCTED TO TI IE MAIN. SEWER LINES SHOULD BE CONSTRUC'FED '10 ALLOW FOR
GRAVITY FLOW FROM THE LOW EST LEVEL OF THE STRUCTURE.
HIE INS TA IF R AND TI IIS PERMITMOST BE PRESENT AT THE ]OB SITE AT THE SCI IF.DULED INSPECTION TIME.
BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NO TICE OF F,XCAVA'I ION 10
OWNERS OF UNDERGROUND PACHT I IES,
CALL 1-800-424-5555 BEFOR[ ' YOU DIG --A'1' LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE
REQUIRES THE INSTALLER YOU
WITH ALL REQUIREMF:N'IS OF I HE WA S'I"A/E DEPI OF LABOR & INDUSTRIES.
INCLUDING THOSE RELATED TO TRENCH SAFETY.
Processed By: CUMMINGS. KATHY PERMIT
Printed By: Lemles, Linda Page I of I
Payment Summary
Total Fees
AmountPaid
AmountOwine
Tran Date
Recce
Payment Amt
$10000
$100.00
$0.00
9/82006
5023
$100.00
Processed By: CUMMINGS. KATHY PERMIT
Printed By: Lemles, Linda Page I of I
NOTICE
It is the responsibility of the applicanYpermiftee to see to it that the use described on the front of this permit complies with applicable codes and
requirements and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permieee's
or property owner's expense. At a minimum, the following inspections ARE REQUIRED by County Code:
1. FOOTING - when forms and reinforcement are in place and prior to placement of concrete—all structures, including manufactured homes.
NOTE: This Inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning
regulations. Typically, side and rear yard setbacks are measured from property lines, while setbacks for yards abutting streets are measured from
the property line or the center line of the roadway right-of-way, whichever provides the greater setback from the center line of the roadway right-of-
way Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas, the County can own as much as 20 feet of
right-of-way between your property and the actual improved streetherb. The responsibility to comply with applicable setback provisions lies solely
with the permiftee—neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your
property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the
owner 's/permittee's expense.
2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete.
3. FRAMING - atter all Gaming, bracing and blocking is in place, and prior to concealing.
4. INSULATION - prior to the installation of drywall.
5. PLUMBING - after rough in, before covering, and final.
6. MECHANICAL - rough in of piping, before covering, metal chimneys before concealment, and final.
7. FINAL - when complete and prior to occupancy and/or use. Please provide 24hoursnotice. All permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan)
required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site
drainage ("208 swales"), road improvements, parking, and landscaping are common requirements of a permit/sits plan which must be
completed prior to final approval of a building or issuance of a Certificate of Occupancy.
8. MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy: completed
inspection record card must be available on site. Manufactured Homes must comply with the manufacturer's installation instructions.
9. SEWERS - prior to cover
10. RIGHT-OF-WAYIAPPROACH - prior to placement of concrete, or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected
prior to cover. Check with the department for 'special inspections' in conjunction with commercial projects.
FOR INSPECTIONS:
TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24-HOUR NOTICE
PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS
FROM MORE THAN ONE AGENCY.
Building, plumbing, mechanical and fire inspections, Department Road cuts for utilities or driveways, Division of Engineering &
of Building & Planning Roads - 48-HOUR NOTICE REQUIRED
477-3675 477-3600
or State Department of Transportation
Construction in a flood plain, Division of Engineering & Roads 456-3000
4773600
• Sewer connection, Division of Utilities
• Electrical wiring, State Department of Labor and Industries 477-3604
324-2640 or City Public Works Department
625-6300
• On site waste disposal system, Spokane Regional Health District
324-1560
PERMIT EXPIRATION AND REFUNDS
Unless otherwise noted, this permit will be considered null and void by limitation if the work authorized by the permit is not commenced or is stopped for
a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration. Al a
minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within one year
of the date of expiration for one-half the original fee, subject to certain limitations—please call us if you have any questions.
All refund requests must be made in writing by the applicaropermihee, (shown on the reverse) no later than 180 days after the date of fee payment.
Refunds of not more than 80% of the permit fee paid may be authorized when no work has been done under the permit. No refunds may be authorized
more than 180 days after fee payment.
MISTAKE?
If you think we've made an error in processing this permit or in conducting inspections pertaining to it, or find erroneous information in the permit, please
bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to
the Department of Building and Planning at the below address.
Spokane County Department of Building & Planning
1026 West Broadway Avenue
Spokane, WA 99260
Phone: (509) 477-3675 Fax: (509) 477-4703 TDD: (509) 477-7133 FORM 30.050202 eLoe PERMIT