Loading...
2003, 07-08 Permit: 03004784 SewerC SPOKANE COUNTY DIVISION OF BUILDING AND CODE ENFORCEMENT C,,,.''''' 1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260.0050 .xruWur.I,(1LT[TO Site Information Project Information Site Address: 71041 8N1AVF SPOKANP_ WA 00000 Paved Number: 35244.0208 Suhdisision: AmountPaid Bla,lo 2 Lot II Leading: UNK Unknown Omner: BITENTER. WILLIAM Address: 7104 E 8TH AVE 4264 SPOKANE, WA 99212-0530 Building lnspecWr IF PALADICHUK Waar Dist. Praject Number: 03004784 Iny: 1 Issue Date: 7/&2003 PelmitUse: SJuh Hk CONNECTION-WOODLAWN Applicant: VISTA CONST RUCION& DLV 3420N ISCI LRLEY RD .SPOKANE. WA 99216 Ploon: [509)92(-22; Contact VISTA CONS'IRU I ION & DEV 3420 N TSCHIRLEY RD SPOKANE, WA 99216 Phones (509) 926-2243 Setbacks - Front Left: Right: Rem, Group Name: Project Name: Permits Selner 0man,afion Permit Gmtmdor: VISLI CONS 'IRUC'CION&DEVELOPME Li—se N: VISTACD999DP. SEWER CONNECTION 1 $9500 PROC7.SSINGPLL $1500 Total Peraut Fee: SIOQOo POR SEWER INSPECTIONS CALL (509) 477-3604 UTILITIES 8 30-5 00 PM MONDAY TURD FRIDAY Call lis inspecban pnonu cmcr. ONE WORKING DAY NOTICE REQUIRED. Gmtmcmr e, uppliamt is to field loupe and oonfnn the cicvmion and p."t,an of mmerstub poor to am otter SsOr'nion. Savor stubs arc to be chcoked pnorto connection to aisum that they It, u,'anable gmdc and arc a. r and unobrtmacd to tho main sealer Sorer Imes should he.... nuand to allow for ¢mvity Ilow fain the loorat Iced of the staMura. l'h6 pamil must he pre. enled Ia the job site inspector for vaolictrtiun. 'Io locate buried cables_ gas piping rester linev. de. CAIJ.I31?F0121i VOl1 DICL (509)4568000. .S IA 11: I.AW PCW 19.122 REQUIRES THAT PRIOR "f0 ANY EXCAVATION THE "CALL BEFORE YOU DIC" CHN'I"ER Rli NOTIFIED_ CAPE BEFORE YOU DIC A LEAST 2 WORKING DAYS IN ADVANCE. (509)456-8000_ Spok:um County Code requires the installer imply with all requirements of the Washington State Dept ofl-abur and Industries, including Ihosa related to tran h rarely_ Processed Its, BURRIS. ROBIN PERMIT Printed Bp: WENDEL. GLORIA Page I of I Payment Summary Total Fees AmountPaid Anloun"vins Tran Date Receipt Passnent Amt SI()UOU $IOO.OD SLL011 7812003 4264 S100.00 Processed Its, BURRIS. ROBIN PERMIT Printed Bp: WENDEL. GLORIA Page I of I NOTICE It Is the responsibility of the appllcard permittee, not Spokane County, to see to It that the use described on the front of this permit complies with applicable codes and requirements and that required Inspections are requested- Failure to rrel required inspections and obtain thenecessary approvals prior to progressing beyond the point where Inspections are required may necessitate removal of certain parts of the constructioat the applicant epermidee's or property owner's expense. At a minimum, the following Inspections ARE REQUIRED by County Code. 1- FOOTING - when forms and reinforcement are In place and prior to placement of concrete --all structures, including manufactured homes. NOTE: This inspection includes review of the structure s setbacks from properly lines. Minimum setbacks are established by County zoning regulations Typically, side and rear yard setbacks are measured from property Imes, while setbacks for yards abutting streets are measured from the property line or the center line of the roadway right-of-way, whichever prevldes the greater setback from the center line of the roadway nght-of way. Curb lines and fence lines are not necessarily Indicative of property lines. In some residential areas. the County can own as much as 20 fact of right-of-way between your property and the actual improved streeVourb. The responsibility to comply with applicable setback dedielens Iles solely with the permittee—neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your property lines- Please verify their location prior to locating your structure. Failure to properly locate the structure may require Its relocation at the owner tormenter, s expense. 2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. 3- FRAMINGafterall framing, bracing and blocking Is In place, and prior to concealing - 4- INSULATION - prior to the installation of drywall. 5. PLUMBING - after rough -in, before covering, and final. 6. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final. 7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. All permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review all improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit Items such as the installation of fire hydrants, fire department access, on-site drainage ("208 swales"), road improvements, parking, and landscaping are common requirements of a perm lyeate plan which must be com- pleted prior to final approval of a building orissuenee eta Candidate of Occupancy - 8. MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etc Installed, and prior to occupancy, completed inspection record card must be available on site. 9. SEWERS - prior to cover 10. RIGHT-OF-WAY/APPROACH - prior to placement of concrete, or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the department for "special Inspections' In conjunction with commercial projects. FOR INSPECTIONS: TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE . PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS FROM MORE THAN ONE AGENCY. • Building, plumbing, mechanical and fire Inspections, Division • Road cuts for utilities or driveways. Division of Engineering 8 of Building and Cade Enforcement Roads - 48-HOUR NOTICE REQUIRED 477-3675 477-3600 or State Department of Transportation • Construction in a flood plain, Division of Engineering 8 Roads 456-3000 477-3600 • Sewer connection, Division of Utilities • Electrical wiring, State Department of Labor and Industries 477-3604 324-2640 or City Public Works Department 625-6300 • On-site waste disposal system, Spokane Regional Health District 3241560 PERMIT EXPIRATION AND REFUNDS Unless otherwise noted, this permit will be considered null and void by limitation if the work authorized by the permit is not commenced or is stopped for a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration. At a minimum an Inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within one year of the date of expiration for one half the original fee, subject to certain limitations—please call us If you have any questions. All refund requests must be made in writing by the applicanf/permittee (shown on the reverse) no later than 180 days atter the date of fee payment. Rotunda of not more than 80% of the permit lee paid may be authorized when no work has been done under the permit. No refunds may be authorized more than 180 days after lee payment MISTAKE? If you think we ve made an error in processing this permit or In conducting Inspections pertaining to it, or find erroneous Information in the permit, please bring it to our attention Immediately by filing a written request forcormotion within 10 working days of discovery. All such requests should be directed to the Division of Building and Code Enforcement at the below address. Spokane County Division of Building & Code Enforcenreul 1026 lyes, Broadway Avenue Spokane, IVA 99260 Phone: (509) 477-3675 11 (509) 477-4703 TDD: 5509) 477-7133