Loading...
2015, 04-28 Permit: SW-15000379 Sewer SPOKANE COUNTY UTILITIES PERMIT Application Number: SW-15000379 Permit Issued Date: 04/28/2015 Expiration Date: 04/28/2016 Project Description: SEWER Project Name: WOODLAWN/BEVERLY HILLS Primary Contact: WATER RECOVERY SERVICES INC Applicant: WATER RECOVERY SERVICES INC Phone: 509-535-0525 Address: 2209 S CHERRY LN SPOKANE,WA 99223 Phone: 509-535-0525 Email: SITE INFORMATION: Site Address: 7108 E 8TH AVE Owner: DEVIN,TERRY W Parcel Number: 35244.0207 Address: 7108 E 8TH AVE SPOKANE,WA 99212-0530 Phone: Assessor's Description: WOODLAWN PK L10 B2 Email: Inspection Area: : (509)-477-3675 Water District:East Spokane Water District Fire District:Spokane Valley Fire #1 Zoning: Land Area:6550 Square Feet CONTRACTOR INFORMATION: WATERRS947RR, Exp.01/11/2017 WATER RECOVERY SERVICES INC 2209 S CHERRY LN SPOKANE,WA 99223 509-535-0525 DETAILS Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $27.12 Utilities Permit $125.00 Total Fee: $152.12 CONDITIONS: Inside Public Transit Benefit Area Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire SVRP Aquifer Boundary:Water Purveyor ability to serve statement required. If unable to serve, ?mitigation certificate?(use of private well) from DOE prior to permit issuance. Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR& INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed:04/28/2015 09:25:43 Project Coordinator:Susan Glark SPOKANE COUNTY UTILITIES PERMIT Application Number: SW-15000379 Permit Issued Date: 04/28/2015 Expiration Date: 04/28/2016 SEWER PERMITS ARE VALID FOR ONE(1)YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed:04/28/2015 09:25:43 Project Coordinator Susan Clark