Loading...
2003, 03-24 Permit: 03001882 SewerSPOKANE COUNTY DIVISION OF BUILDING AND CODE ENFORCEMENT 1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050 Site Information Project Information Site Address: 7203 E 8TH AVE Permit Use: SEWER CONNECTION - WOODLA WN SPOKANE,, WA 00000 Pon rel Number: 352413806 Subdivision: CHENEY WA 99004 Black: 2 ud: 6 Zoning: UR -7 Urbana Residential -7 Owner. COURCI INNF, RANDY Address: 17201 E CATALDO Rear: GREENACRES. WA 9 901 6-95 15 Building Inspector: MARC STRAIIB Water Dist Project Numbee 03001882 Inv: I Lane Date: 324/2003 Permit Use: SEWER CONNECTION - WOODLA WN Applicant TLC CONSTRUCIION 9006 S HAYFORD RD Total Fees CHENEY WA 99004 Phone (509) 456-3687 Contact TLC CONST RUCTION Re,eirat 9 9006 S HAYFORD RD $100.00 Cl LENIN WA 99004 Phone: (509)456-3687 Sadmel¢-Front: Left: Right Rear: Group Name: Project Name: Permits Sewer Cann,Yian}relmit Gmrrack— TLCCONSTRLCTION Liceme4o 'FLCCO-1071,16 SLWLRCONNECIRN 1 $85.00 PROCESSING FEE S15 00 'Fatal Perot Fee: $10000 FOR SEWER INSPECTIONS CALL (509) 477-3604 U IIA '1'IES 830-5D0 PM MONDAY TEND FRIDAY Cell Car inspection prier la tower ONE WORKING DAY NOTICE REQUIRED. Contractor or applicant is to field locate and coelinn the devotion and position .faewer smb prior In any other escavnlion. Sewer stubs are to be checked prior to connection to ensure that They have acceptable grade and are clear and unobstructed to the main server. Sewer lines should be constructed to allow, for gravity, flow from the lowest level ofthe structure. This permit must be presented to Thelon site inspect., for verihcatinr 'I.l.ude buried cables, gas piping, water linea, etc. CALL BEFORE, YOU DIG, (509)156-8000_ SPATE LAW RCW 19.122 REQUIRES "I ITA'IPRIOR 1`0 ANY EXCAVA'PION THE "CALL BEFORE YOU DIG" CENTER BE NO'I ]E ED- CALL BFI ORE YOU DIG A LEAST 2 WORKING DAYS IN ADVANCE, (509)456-8000_ Prnreswd By: BURRIS, ROBIN Printed By: HINTZ, EMIT I Page 1 of 1 v , PERMIT Payment Summary Total Fees Am.untPaid Amuunt0evine Tran Data Re,eirat 9 Pavrnent Amt $100.00 $10000 $000 3/24/2003 1785 $100.00 Prnreswd By: BURRIS, ROBIN Printed By: HINTZ, EMIT I Page 1 of 1 v , PERMIT NOTICE It is the responsibility of the appllcan Vpermlttee, not Spokane County, to see to it that the use described on the front of this permit complies with applicable codes and requirements and that required inspections are requested Failure to request required Inspections and obtain the necessary approvals prior to progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicants/permittee's or properly owner s expense. At a minimum, the following inspections ARE REQUIRED by County Code: 1. FOOTING - when forms and reinforcement are in place and prior to placement of concrete—all structures, Including manufactured homes. NOTE: This inspection Includes review of the structures setbacks from property lines. Minimum setbacks are established by County zoning regulations. Typically, side and rear yard setbacks are measured from property lines, while setbacks for yards abutting streets are measured from the property line or the center line of the roadway right-of-way, whichever provides the greater setback from the center line of the roadway right-of- way. Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas, the County can own as much as 20 feet of right-of-way between your property and the actual improved strodUcurb. The responsibility to comply with applicable setback provisions Iles solely with the permitten�mther Spokane County nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prier to locating your structure. Failure to properly locate the structure may require its relocation at the owner'& permittee's expense. 2. FOUNDATION - when to ams and reinforcement are io place and prior to placement of concrete. 3. FRAMING - after all framing, bracing and blocking is in place, and prior to concealing - 4. INSULATION - prier to the Installation of drywall - 5. PLUMBING - alter rough -in, before covering, and final. 6. MECHANICAL - rough in of piping, before covering, metal chimneys before concealment, and final. 7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. AB permits require final Inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, omsito drainage ("208 swales"), road improvements, parking, and landscaping are common requirements of a permitthda, plan which must be com- pleted prior to final approval of a building or issuance of a Cedlfices of Occupancy. 8. MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etcinstalled, and prior to occupancy, completed inspection record card must be available on site. 9. SEWERS - prior to cover 10. RIGHT-OF-WAY/APPROACH - prior to placement of concrete, or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the department for 'special inspections' in conjunction with commercial projects. FOR INSPECTIONS: TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY124 HOUR NOTICE . PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS FROM MORE THAN ONE AGENCY. • Building, plumbing, mechanical and fire inspections, Division • Road cuts for utilities or driveways, Division of Engineering & of Building and Code Enforcement Roads - 48-HOUR NOTICE REQUIRED 477-3675 477-3600 or State Department of Transportation • Construction in a flood plain, Division of Engineering & Roads 456-3000 477-3690 • Sewer connection, Division of Utilities • Electrical wiring, State Depadment of Labor and Industries 477-3604 324-2640 or City Public Works Department 625-6300 • On-site waste disposal system, Spokane Regional Health District 324-1560 PERMIT EXPIRATION AND REFUNDS Unless otherwise noted, this permit will be considered null and void by limitation it the work authorized by the permit is not commenced or is stopped for a period of 180 tlays, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration. At a minimum an inspection should be requested at least once every 180 days to assure the validity of the permit A permit may be renewed within one year of the date of expiration for one half the original fee, subject to certain limitations—please call us it you have any questions. All refund requests must be made in writing by the applicantlpermdtee (shown on the reverse) no later than 180 days after the date of fee payment. Refunds of not more than 80% of the permit fee paid may be authorized when no work has been done under the permit. No refunds may be authorized more than 180 days after fee payment. MISTAKE? If you think we ve made an error m processing this permit or in conducting Inspections pertaining to It, or find erroneous Information in the permit, please bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to the Division of Building and Code Enforcement at the below address. Spokane County Division of Building & Code Enforcement 1026 West Broadway Avenue Spokane, WA 99260 Phone: (509) 477-3675 Fru: (509) 477-4703 TDD: (509) 477-7133