Loading...
2008, 05-01 Permit: 08001609 Addition.0000'` BUILDING DIVISION tlFl Bf Spoane j Building Perini( 1ep 11703 Sprague Avenue, Suite B-3 �%u J c Spokane Valley, WA 99206 Site Information Project Information Site Address: 7203 E 8TH AVE 391 RESIDENTIAL PERMIT FEB Project Number: 08001609 Inv: I Issue Date: 05/01/2008 RES ADD Permit Use: NEW 29.5 X 42 ADDITION Parcel Number: 35241.3806 $450 Subdivision: Applicant: COURCHAINE, RANDY Block:2 Lot: 6 7307 F. 9TH AVE $87,980 52 SPOKANE VALLEY, WA 99212 Phone: (509) 924-3492 Zoning: ME-[ MF MDR District 'Foul Permit Fee: $1,278.15 FOR BUILDING INSPECTIONS CALL (509) 688-0054- Contact: COURCHAINE, RANDY Owner. COURCHAINE, RANDY 7307 E 91 H AVE Address: 7307 E' 9TH AVE SPOKANE VALLEY, WA 99212 Phone: (509) 924-3492 SPOKANE VALLEY, WA 99212 AmountPaid AmountOwine Setbacks - Front: Left: Right: Rear: Building Inspector: SOUTH $1,278-15 Water Dist: EAST SPOKANE 05/01/2008 13946 $1,278.15 Group Name: Project IS... Processed By: Main, Jodi L PERMIT Printed By: PATRICIA PRINCE Page I of I Permits j Building Perini( Cmtraetor: OWNER Lic,m,#: OWNER _ GARAGE U -I VB 391 RESIDENTIAL PERMIT FEB $90975 RES ADD R-3 VB 848 WSBCSURCHARGE $450 SF PLNS RV W <7999 SO FT $363.90 Poral Valuc: $87,980 52 'Foul Permit Fee: $1,278.15 FOR BUILDING INSPECTIONS CALL (509) 688-0054- ..___... Payment Summary Total Fees AmountPaid AmountOwine Tran Date Receipt k Payment Amt $1,278-15 $1,278.15 $0.00 05/01/2008 13946 $1,278.15 Processed By: Main, Jodi L PERMIT Printed By: PATRICIA PRINCE Page I of I NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner s expense. At a minimum, the following inspections ARE REQUIRED by City Code'. FOOTING - when forms and reinforcement are in place and prior to placement of concrete -all structures, Including manufactured homes. NOTE: This inspection Includes review of the structures setback from property lines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb Imes and fence lines are not necessarily in icative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permittee -neither the City of Spokane Valley nor Its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner s/permittee's expense. FOUNDATION - when forms and reinforcement are In place and prior to placement of concrete. PLUMBING - after rough -in, before Covering, and final. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final. FRAMING - after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL - when complete and prior to occupancy and/or use. All permits require final inspection. NOTE'. In addition to inspection of the structure, this inspection Includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a Condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site drainage ('208'swales), road improvements, parking and landscaping are common requirements of a permiVsdis plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etcinstalled, and prior to occupancy: completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover. RIGHT-OF-WAV/APPROACH - prior to placement of concrete/asphalt or, If gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etcmust be Inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and Inspections from more than one agency. Building, plumbing (includes interior reversals for sewer) and Road cuts for utilities or driveways, City of Spokane Valley mechanical, City of Spokane Valley Building Division 688-0054 Public Works 688-0195 or State Dept of Transportation 324 6D00 Penis and mzpecture for eleangl nuns stale oenannot or Labor Fem6 am mpees—ler sewer Connection Spokane Omni, Fell Dlvson And lndmmes 121 Poar 477aso4 P-15 end nspectnne for on-sle septic syster¢. Spokane Regional Fe sprinkler and baterm syborne end pnrate accea: road mspaerns. spokzne vauey nevi Leon, Dizmct "r-11. Fue Oepanment 992<122 satin, b. Few 19122 regmres line be., to Cry ... v abon line CALL BEFORE YOU OIG-bolle, nun be evil Call before you of at least 2 wMing days In advance. 456-3000. PERMIT EXPIRATION AND REFUNDS All pennies shall expire by limitation and be declared void if a) work Is not started within 180 days of obtaining a permit, or on work Is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit Issuance, regardless of whether the work Is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original penult. All refund requests must be made in writing by the original permibee to the Building Official no later than 180 days after the date of fee payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be amborized when an application is withdrawn or cancelled prior to the plan review being completed. Owner / Agent 4'// Viiz� � �Lb•!�—� Date Stall Approval Date