2008, 05-01 Permit App: 08001609 AdditionProject Number: 08001609 Inv: 7 Application Date: 5/1/2008 Page 1 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Proiect Information: e: , �. ..11 ..."I'll" - — „2...,... .m
Permit Use: NEW 29.5 X 42 ADDITION
Contact: COURCHAINE, RANDY
Address: 7307 E 9TH AVE
C - S - Z' SPOKANE VALLEY, WA 99212
Setbacks: Front Left: Right: Rear:
Phone: (509)924-3492
Group Name:
Project Name
Site Information.
Plat Key: Name: REMINGTON PARKra.x-
DistrictTc�Sout
Parcel Number: 35241.3806 Block: 2
Lot: 6
SiteAddress: 7203E 8TH AVE
Owner: Name: COURC IMNE, RANDY
Address: 7307 E 9TH AVE
Location:: CSV
SPOKANE VALLEY, WA 99212
Zoning: MF -1 MF MDR District
Water District. 020 EAST SPOKANE
Hold: ❑
Area: 7,620 Sit Ft Width: 0
Depth: 0 Right Of Way (ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information:
Review
Building Plan Review
j Released By:
Originally Released:
5/1/2008 By: tmelbourn
Landuse/Zoniog/HE Conditions
[Released B
Originally Released:
4/30/2008 By: cjjanssen
Permits <1:-- :Da,. �.....
Operator: joint Printed By: jmm Print Date: 5/1/2008
Project Number: 08001609 Inv: I Application Date: 5/1/2008 Page 2 oft
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
- — Building Permit - -
Contractor: OWNER
Firm:
OWNER
Phone:
(000)000-0000
This Application:
Total
Project:
Description Grp Tvoe
Notes
So Ft
Valuation
So Ft
Valuation
GARAGE U-1 VB
391
$7,429.00
391
$7,429.00
RESADD R-3 VB
848
$80,551.52
848
$80,551.52
Totals:
1,239
$87,980.52
1,239
$87,980.52
Item Description
Units
Unit Desc
Fee Amount
RESIDENTIAL PERMIT FEE
1
SELECT
$909.75
WSBC SURCHARGE
1
SELECT
$4.50
SF PENS RV W , 7999 SQ FT
1
SELECT
$363.90
Permit Total
Fees:
$1,278.15
Notes:.,�y.=..«.,..:.„.a�.,...u�...,,... �..�....,...a.,..v.....a.,�
Payment Summary:
Permit Tvpe Fee Amount Invoice Amount Amount Paid Amount Omne
Building Pemut $1,278.15 $1,278.15 $0.00 $1,278.15
$1,278.15 $1,278.15 $0.00 $1,278.15
Disclaimer:
Submittal of this application certifies the owner (or persons) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm Print Dale: 5/1/2008
Perttdt Center
an a 11703 E Sprague Ave, Suite F,Y PERMIT NUMBER S- � cccj
Spokane Spokane Valley,.WA 992l)6 LEY PERMIT
�FEE:
VAJey. (509)688-003 �, �f: 037 (90N8�0
�eun� wsvws okatt�vulle .or• .7 ,�11'Ig
Community Development a
Residential Construction 1_-h�4)ll t�t"fNe Construction ❑ Accessory Bldg
Permit Application fir_— Addition/Remodel ❑ Deck
n Other:
SITE ADDRESS:
ASSESSORS PARCEL NO: 3?061 LEGAL DESCRIPTION:
Building Owner:
DIMENSIONS _ '
24-cx �-6-''�2-
Contractor:
TOTAL HABITABLE SPACE:
vd-
Name: fJ
2 FLOOR SQ. FTG:
Name:
IMPERVIOUS SURFACE
Address: .)
Address:
AREA:
City: S te:
ZiPg9-2/
City:
State: Zip:
SQ. FTG: U
yifsj/--� i
PROPERTY:
Phone: n Fax:
,/-
CONSTRUCTION TYPE:
Phone:
Fax
Contractor Lic No:
Exp Date:
Contact PerSOn
City Business Liu No:
Name:
Phone:
Describe the scope of work in detail: Cost of Project: $ /S'(Joo
-e-
Proposed Use:
**************Tbe followine MUST be complete: (write N/A if not applicable)**********************
HEIGHT T9 PEAK:
I
DIMENSIONS _ '
24-cx �-6-''�2-
# OF STORIES:
l
TOTAL HABITABLE SPACE:
vd-
MAIN FLOOR TO SQ.
2 FLOOR SQ. FTG:
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACE
FTG:ii
AREA:
FINISHED BASEMENT
GA GE SQ. FTG:
DECK/COV. PATIO SQ. FTG:
30% SLOPES ON
SQ. FTG: U
yifsj/--� i
PROPERTY:
# OF BEDROOMS:
CONSTRUCTION TYPE:
HEAT SOURCE:
SEWER OR SEPTIC?
The pem-dee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling WWII be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be pro c sed.
SIGNATURE: G Z DATE:
Method of Payment:
❑ Cash 14 Check
Bankcard #:
Authorized Signature:
REVsrc vi wr
❑ Mastercard ❑ VISA
Expires: VIN#:
Spokan11703 E Sprague Ave Suite B-3♦ Spokane Valley WA 99206
♦509.688.0036 ♦ Fax: 509.688.0037
jValley-
EX Completed Building and Mechanical Application with: Accurate address, Parcel
Number and/or Legal Description, description of work, owner and contractor
information, signature and date.
FX Three (3) sets of plans including Site Plan, elevations, floor plans, foundation plans
with details, roof plan, framing plans and details.
IX Show the height of any proposed buildings or accessory structures.
❑X Floor plan for each floor: Dimension to scale(minimum 1/8") and label each room
(including sq footage of house and garage on plans) show each level of existing
house and square footage of any additions.
FX Egress windows: Provide at least one window or exterior door approved for
emergency escape or rescue from basement and in every room for sleeping.
r7X Floor framing details: Joist type, size, spacing and installation details.
EX Roof framing plan and details
FX Furnace and hot water heater location
MX All header locations: type, size and connections
EX Foundation plan
FX Insulation information
EX Decks and Stairway details
All braced wall panel types: show locations and details of installation, including
engineered design
Smoke detector locations
22" x 30" attic access location
18" x 24" crawl space access
One-hour separation detail: between house and garage
For City Use.gnly
000, PLUS Project NumberC71L- U�
►SpoCITY k11 aneProject Address f
Valley 0t
,,;wO11703 E Sprague Ave Suite 3-3 ♦ Spokane Valley WA 99206
509.688.0036 + Fax: 509.688.0037 * permi[centerCaspokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is I I "L'
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Erna time may be required for re -submittals as project application reviewers work on multiple applications and it
may be .several days before they can look at tour new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best chokefor the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This docs not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive Flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK -BUILDING FILE REV9107
PLANNING DEPT. APPROVED
BYL-h,.d ,\ ,< i— ,�
DATE: -41-3DIvo
01,41 Li ", -pt'
sip
9
Ll
�t ca
<Z11
(try
-z_
L�t-1 e -D
,(-q / -1p
LAJ
-1
FF 71
A 4T
CPA-'
4-r dim
PLANNING DEPT. APPROVED
BYL-h,.d ,\ ,< i— ,�
DATE: -41-3DIvo
01,41 Li ", -pt'
sip
9
Ll
�t ca
<Z11
(try
-z_
L�t-1 e -D
,(-q / -1p