Loading...
2005, 08-24 Permit: 05006226 Sewer SPOKANE COUNTY DEPARTMENT OF BUILDING & PLANNING SPUKAFt GOUTY 1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050 Site Information Project Information Site Address: 7208 E 8TH AVE Project Number: 05006226 Inv: I Issue Date: 8/24/2005 Permit Use: SEWER CONNECTION,WOODLAWN PARK Parcel Number: 35244.0222 Subdivision: WOODLAWN PARK Applicant: norm's Excavating Block: Lot: P.O. BOX 574 Zoning: UR-3 Urban Residential 3.5 VERADALE,WA 99037 Phone: (509)928-0580 Contact norm's Excavating Owner: BOUMA,BARBARA P.O. BOX 574 Address: 1118 E LA CROSSE VERADALE,WA 99037 Phone: (509)928-0580 SPOKANE, WA 99207 Setbacks-Front: Left: Right: Rear: Building Inspector: NONE Water Dist: Group Name: Project Name: Permits Sewer Connection Permit Contractor: NORM'S EXCAVATING INC License NORMSEI972BM SEWER CONNECTION I $P500 PROCESSING FEE I 515.00 Total Permit Fee: $100.00 FOR SEWER INSPECTIONS CALL(509)477-3604 UTILITIES 8.30-5:00 PM MONDAY TIIRU FRIDAY Call for inspection prior to cover. ONE WORKING DAY NOTICE REQUIRED. Contractor or applicant is to field locate and confirm the elevation and position of sewer stub prior to any other excavation. Sewer stubs arc to be checked prior to connection to ensure that they have acceptable grade and arc clear and unobstructed to the main sewer. Sewer lines should be constructed to allow for gravity flow from the lowest level of the structure. This permit must be presented to the job site inspector for verification. To locate buried cables,gas piping,water lines,etc. CALL BEFORE YOU DIG,(509)456-8000 STATE LAW RCW 19.122 REQUIRES THAT PRIOR TO ANY EXCAVATION THE"CALL BEFORE YOU DIG"CENTER BE NOTIFIED.CALL BEFORE YOU DIG AT LEAST 2 WORKING DAYS IN ADVANCE,(509)456-8000. Spokane County Code requires the installer comply with all requirements of the Washington State Dept of Labor and Industries, including those related to trench safety. Payment Summary Total Fees AmountPaid AmountOwinP Tran Date Receipt# Payment Amt $100.00 $100.00 50.00 8/24/2005 5033 SI 00.00 Processed By: Hansen,Torn PERMIT Printed By: WENDEL,GLORIA Page I of 1 NOTICE It is the responsibility of the applicant/permittee to see that he use described on the front of this permit complies with applicable codes and requirements and that required inspections are requested_Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicanfs/permittee's or property owner's expense.At a minimum,the following inspections ARE REQUIRED by County Code: I. FOOTING - when forms and reinforcement are in place and prior to placement of concrete—all structures, including manufactured homes. NOTE:This inspection includes reviev of the structure's setbacks from property lines.Minimum setbacks are established by County zoning regulations.Typically. side and rear yard setbacks are measured from property lines,while setbacks for yards abutting streets are measured from the property line or center line of the roadway right-ot-way.whichever provides the greater setback from the center line of the roadway right-of-way.Curb lines and fence lines are not necessarily indica- tive of property lines.In some residential areas,the County can own as much as 20 leet of right-of-way between your property and the actual improved street/curb. The responsibility to comply with applicable setback provisions lies solely with the permittee—neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your property lines.Please verify their loeation prior to locating your structure.Failure to properly locale the structure may require its relocation at the owner's/perminen s expense. 2.FOUNDATION-when forms and reinforcement are in place and prior to placement of concrete. 3.FRAMING-atter all framing,bracing and blocking is in place,and prior to concealing. 4 INSULATION.prior to the installation of drywall. 5.PLUMBING-after rough-in,before covering,and final. 6_MECHANICAL.-rough-in of piping,before covering,metal chimneys before concealment,and final. 7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice- AJ/ permits require final inspection. NOTE: In addition to inspection of the structure,this inspection includes review of site improvements(typically depicted on the approved site plan)required by ordinance or as a condition of approval of this permit.Items such as the installation of fire hydrants,fire department access,on-site drainage("208 swales"),road improvements,parking,and landscaping are common requirements ofa permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy R.MANUFACTURED HOMES-final inspection required when complete,stairs,handrails,skirting,etc.installed,and prior to occupancy;completed inspection record card must be available on site. Manufactured home installations must comply with the manufactures installation instructions. 9.SEWERS-prior to cover 10.RIGHT-OF-WAY/APPROACH-prior to placement of concrete,or,if gravel approach,after completion. In addition to the above,any plumbing car mechanical systems or material which would be concealed by framing,drywall,concrete,eta,must he inspected prior to cover. Check with the department for"special inspections"in conjunction with commercial projects FOR INSPECTIONS: TO INSURE PROMPT SERVICE,PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE . PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS FROM MORE THAN ONE AGENCY. • Building.plumbing,mechanical and fire inspections,Department • Road cuts for utilities or driveways,Division of Engineering& of Building and Code Enforcement Roads-48-HOUR NOTICE REQUIRED 477-3675 477-3600 or State Department of Transportation • Construction in a flood plain,Division of Engineering&Roads 456-3000 477-3600 • Sewer connection,Division of Utilities • Electrical wiring,State Department of Labor and Industries 477-3604 324-2640 or City Public Works Department • On-site waste disposal system,SpokaneRegional Health District 625-6300 giona 324-1560 PERMIT EXPIRATION AND REFUNDS Unless otherwise notedthis permit will be considered null and void by limitation if the work authorized by the permit is not commenced or is stopped for a period of 180 days,unless a written request furan extension of the permit is received and approved by the Building Official prior to expiration.At a minimum an inspection should be requested at least n IRO days to assure the validity of the permit.A permit may he renewed within one year of the date or expiration for one-hal Fthe original fee, subject o certain limitations—please call us if you have any questions. Any refund requests must be made in writing by the applicantlpennittee(shown on the reverse)no later than 180 days after the date of fee payment.Refunds of not more than RO"/o of lie permit fee paid may he authorized when no work has been done under the permit No refunds may he authorized more than 180 days atter fee payment. MISTAKE? Ifyou think weAe made an error in processing this penn it or in conducting inspections pertaining to it,or find erroneous information in the permit,please bring it to our attention immediately by filing a written request for correction within 10 working days of discovery.All such requests should be directed to the Division of Building and Code Enforcement at the below address. Spokane County Department of Building and Planning 1026 West Broadway Avenue, Spokane, WA 99260 Phone: (509)477-3675 Fac (509) 477-4703 TDD: (509) 477-7133 www,spokanecountyorg/bp bp(au7spakanecounty.org """'""^°"" °'"'°'