2002, 11-19 Permit: 02010346 WoodstoveSPOKANE COUNTY DIVISION OF BUILDING
AND CODE ENFORCEMENT
1026 WEST BROADWAY AVENUE' SPOKANE, WA 99260-0050
Mechanicul Permit
Permits
Contractor: OWNER
Group Name:
Project Name:
Licensed: OWNER
WOOILPET.LET STOVE/WSER 1 525.00 PROCESSING FEE $25.00
TOW Permit Fre: $50.00
FOR IAECHANICAL INSPECTIONS CALL (509) 477-3675.
Site Information
Project Information
Site Address:
7215 EBTH AVE
Project Number: 02010346 Inv: 1
fsme Date: 11/19/02
AmountOwine
SPOKANE, WA 99212
Receipt
Permit Use: WOODSTOVE
$50.00
Parcel Number:
35241.3819
11/19/02
9246
$50.00
Subdivision:
UNKNOWN
Applicant: CORDOVA, CARRIE
Block:
Int
7215 E8TH AVE
Zoning:
SFR
SPOKANE, WA 99212
Phone: (509) 893-8022
Contact: CORDOVA, CARRIE
Owner:
CORDOVA, CARRIE
7215 E8TH AVE
Address:
7215 E STH AVE
SPOKANE, WA 99212
Phone: (509) 893-8022
SPOKANE, WA 99212
Setbacks - Front Luft Right:
Rear:
Building Inspector: DAN HOWARD
Water Disc
Mechanicul Permit
Permits
Contractor: OWNER
Group Name:
Project Name:
Licensed: OWNER
WOOILPET.LET STOVE/WSER 1 525.00 PROCESSING FEE $25.00
TOW Permit Fre: $50.00
FOR IAECHANICAL INSPECTIONS CALL (509) 477-3675.
Processed By: FRAZIER, CAROL
Printed By: WENDEL, GLORIA Page 1 of 1
=
PERMIT
ff
Payment Summary
Total Fees
AmoumPaid
AmountOwine
Tran Date
Receipt
Payment Aral
$50.00
$50,00
$000
11/19/02
9246
$50.00
Processed By: FRAZIER, CAROL
Printed By: WENDEL, GLORIA Page 1 of 1
=
PERMIT
ff
NOTICE
It Is the responsibility of the applicanVpermittee, not Spokane Count, to see to it that the use described on the from of this permit complies with
applicable codes and requirements and that required Inspections are requested. Failure to request required Inspections and obtain the necessary
approvals prior to embossing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the
applicant c/permittee'a or property owners expense. At a minimum, the following inspections ARE REQUIRED by County Code:
1 FOOTING - when forms and reinforcement are in place and prior to placement of concrete—all structures, including manufactured homes.
NOTE: This inspection Includes re of the structures setbacks from property lines Minimum setbacks are established by County zoning
regulations. Typically, side and rear yard setbacks are measured from property Imes, while setbacks for yards abutting streets are measured from
the property line or the center line of the roadway right-of-way, whichever provides the greater setback from the center line of the roadway right of
way Curb lines and fence lines are not necessarily indicative of property lines_ In some residential areas, the County can own as much as 20 feet of
righbof-way between your property and the actual improved streeUcurb. The responsibility to comply with applicable setback provisions lies solely
with the permittee—nether Spokane County nor Its authorized representatives assume any responsibility for the verification or location of your
property Imes. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the
owner'apermittee's expense.
2. FOUNDATION - when forms and reinforcement are In place and prior to placement of concrete.
3. FRAMING after all framing, bracing and blocking is in place, and prior to concealing.
4. INSULATION - prior to the installation of drywall.
5. PLUMBING after rough in, before covering, and final.
6. MECHANICAL rough -in of piping, before covering, metal chimneys before concealment, and final.
7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. All permits require final Inspection.
NOTE: In addition to inspection of the structure, this Inspection Includes review of site improvements (typically depicted on the approved site plan)
required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site
drainage ("208 awelea" ), road Improvements, parking, and landscaping are common requirements of a permitlsea plan which must be com-
pleted prior to final approval of a building or issuance of a Certificate of Occupancy.
8. MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etc Installed, and prior to occupancy; completed
inspection record card must be available on site.
9. SEWERS - prior to cover
10. RIGHT-OF-WAWAPPROACH - prior to placement of concrete, or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected
prior to cover. Check with the department for 'special inspections' in conjunction with commercial projects.
FOR INSPECTIONS:
TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE .
PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS
FROM MORE THAN ONE AGENCY.
• Building, plgtnbing, mechanical and fire inspections, Division ' Road cuts for utilities or driveways, Division of Engineering &
of Building and Code Enforcement Roads - 48-HOUR NOTICE REQUIRED
477-3675 477-3600
or State Department of Transportation
• Construction in a flood plain, Division of Engineering & Roads 456-3000
4773600
• Sewer connection. Division of Utilities
• Electrical wiring, State Department of Labor and Industries
477-3604
3242640
or City Public Works Department
625-6300
• On-site waste disposal system, Spokane Regional Health District
3241560
PERMIT EXPIRATION AND REFUNDS
Unless otherwise noted, this permit will be considered null and void by limitation if the work authorized by the permit is not commenced or is stopped for
a period of 180 tlays, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration. At a
minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within one year
of the date of expiration for one-half the original fee, subject to certain limitations—please call us if you have any questions.
All refund requests must be made in writing by the appllcanVpermitee (shown on the reverse) no later than 180 days atter the data of fee payment.
Refunds of not more than 80% of the permit fee paid may be authorized when no work has been done under the permit. No refunds may be authorized
more than 180 days after fee payment.
MISTAKE?
If you think we've made an error In processing this permit or In conducting inspections pertaining to it, or find erroneous Information In the permit, please
bring it to our attention immediately by filing a worse request for correction within 10 working days of discovery. All such requests should be directed to
the Division of Building and Cade Enforcement at the below address.
Spokane County Division ofBui/diog & Code Enforcement
1026 West Broadway Avenue
Spokane, WA 99260
Phone: (509) 477-3675 Fru: (509) 477-4703 TDD: (509) 477-7133