Loading...
2003, 11-04 Permit: 03007977 SewerSPOKANE COUNTY DIVISION OF BUILDING AND CODE ENFORCEMENT 1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050 Site Information Project Information Site Address: 7218 EST] IAVE Reject Number: 03007977 Inv: I IssnDrate: 11/4/2003 SPOKANE, WA 99212 AmountPaid $100.00 Permit Use: SEWER CONNECTION -WOODIAWN Tran Date 1 V42003 Parcel Number: 35244.0201 Subdivision: WOODLAWN PARK Applicant: MUELLER EXCAVATING Black Lot: 3743 W OLYMPIC SPOKANE WA 99205 Phone: (509)326-1016 Zoning: SPR Contact: MUELLER EXCAVATING Owner: EASTER,ALVIN 3743 W OLYMPIC Address: 7218 E8TILAVE SPOKANE WA 99205 Phone: (509)326-1016 SPOKANE, WA 99212 Setbacks -Front Left: Right. Rear: Building Inspector: NONE Water Dist Group Nomc Project Name: Permits Sewer Connection Permit Contractor: MUELLER ESCAVAEING Lkina-g: MUELLE`IHIKK_ SEWER CONNECTION 1 $8500 PROCESSING FEE. $1500 Total PeecatFee: $10000 FOR SEWER INSPECTIONS CALI. (509) 477-3604 UTI.ITIES 8:30-5:00 PM MONDAY TH RU FRIDAY Call for inspection prior to cover. ONE WORKING DAY NOTICE REQUIRED. Contractor or applicant is to field locate and confirm the elevation and position of sewer stub prier to any other excavation. Sewer stubs are to be checked prior to connection to ensure that they have acceptable grade and arc clear and unobstructed to the main newer. Sewer lines should be constructed to allow for gravity flow from the lowest level of the structure. This permit must be presented to tbejob site inspector for verification 'fit locate brand cables, gas piping, water lines, etc CALL BEFORE YOU DIG, (509)456-8000, STAIE LAW RC W 19.122 REQUIRES THAT PRIOR TO ANY EXCAVATION THE "CALL BEFORE YOU DIG" CENSER BE NOTIFIED. CALL BEFORE YOU DIG AT LEAST 2 WORKING DAYS IN ADVANCE, (509)456-8000. Spokane County Code requires the installer comply with all rcgoirements of the Washington Suite Dept ofLabor and Indnstncs, including those related to trench safety. FILE Processed By: BURRIS, ROBIN PERMIT Printed By: WENDEL, GLORIA Page I of 1 Payment Summary Total Fees $10000 AmountPaid $100.00 Amnunt0wine $0,00 Tran Date 1 V42003 Reecipt 7055 Payment Amt 5100.00 FILE Processed By: BURRIS, ROBIN PERMIT Printed By: WENDEL, GLORIA Page I of 1 NOTICE It is the responsibility of the applicant/permittee, not Spokane County to see to it that the use described on the front of this permit complies with applicable codes and requirements and that required inspections are requested. Failure to request required inspections and obtain the necessary approvals prior to progressing beyond the point where Inspections are required may necessitate removal of certain parts of the construction at the applicant 'enormities a or property owner's expense. At a minimum, the following inspections ARE REQUIRED by County Code. I - FOOTING - when forms and reinforcement are n place and prior to placement of concrete—all structures, including manufactured homes - NOTE: This inspection includes re of the structure s setbacks from property lines. Minimum setbacks a established by County zoning view m regulations Typically side and rear yard setbacks are measured from property lines, while setbacks for yards abutting streets are measured from the property line or the center line of the roadway right-of-way, whichever provides the greater setback from the center line of the roadway right-ob way. Curb Imes and fence lines are not necessarily indicative of property lines. In some residential areas, the County can own as much as 20 feet of right-of-way between your property and the actual improved streeVcurb. The responsibility to comply with applicable setback provisions Iles solely with the permittee—neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your properly lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owners/permitteee s expense. 2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. 3. FRAMING - after all framing, bracing and blocking is in place, and prior to concealing. 4. INSULATION - prior to the installation of drywall. 5. PLUMBING - after rough -in, before covering, and final. 6. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final. 7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. All permits require final Inspection. NOTE: In addition to inspection of the structure, this Inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site drainage ("208 swedes"), road improvements, parking, and landscaping are common requirements of a permi /dice plan which must be com- pleted prior to final approval of a building or issuance of a Certificate of Occupancy. 8. MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to Occupancy, completed inspection record card must be available on site. 9. SEWERS - prior to cover 10. RIGHT-OF-WAY/APPROACH - prior to placement of concrete, or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the department for "special inspections' in conjunction with commercial projects. FOR INSPECTIONS: TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE . PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS FROM MORE THAN ONE AGENCY. • Building, plumbing, mechanical and fire inspections, Division Road cuts for utilities or driveways, Division of Engineering 8 of Building and Cade Enforcement Roads - 48-HOUR NOTICE REQUIRED 477-3675 477-3600 or State Department of Transportation • Construction in a flood plain. Division of Engineering 8 Roads 456-3000 477-3600 • Sewer connection, Division of Utilities • Electrical wiring, Slate Department of Labor and Industries 477-3604 324-2640 or City Public Works Department 625-6300 • On-site waste disposal system. Spokane Regional Health District 324-1560 PERMIT EXPIRATION AND REFUNDS Unless otherwise noted. this permitwill be considered null and void by limitation if the work authorized by the permit is not commenced oris stopped for a pedod of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration. At a minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within one year of the date of expiration for one half the original fee, subject to certain limitations—please call us it you have any questions. All refund requests must be made in writing by the applicant/permittee (shown on the reverse) no later than 180 days after the data of fee payment. Refunds of not more than 80% of the permit lee paid may be authorized when no work has been done under the permit. No refunds may be authorized more than 180 days after fee payment. MISTAKE? It you think we've made an error in processing this permit or In conducting inspections pertaining to it, or find erroneous information In the permit, please bring it to our attention Immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to the Division of Building and Code Enforcement at the below address. Spokane County Division of Building& Code Enforcement 1026 West Broadway Avenue Spokane, WA 99260 Pri (509) 477-3675 Fru: (509) 477-4703 7DD: (509) 477-7133