Loading...
2005, 07-26 Permit: 05002571 Plumbing FixturesSpokan BUILDING DIVISION Valley 707 o Sprague ASuite 106 Ni �+ Spokane Valley,, WA WA 99306 Site Information Project Information Site Address: 7310 E 8TH AVE Project Number: 05002571 Inv: 1 Issue Date: 07/26/2005 Permit Use: INSTALL TOL SH WR, SINK Parcel Number: 35244.0109 Subdivision: Applicant: VISTA CONSTRUCTION &DEV Block: Lot: 3420 N TSCHIRLF.Y RD Zoning: UR -3 Urban Residential 3.5 SPOKANE, WA 99216 Phone: (509) 926-2243 Contact: VISTA CONSTRUCTION &ELY Owner: GOLDBERG. V N 3420 N TSCI IIRLEY RD Address: 7310 E 8111 AVE SPOKANE, WA 99216 Phone: (509)926-2243 SPOKANE VALLEY, WA 99212-0531 Setbacks - Front: Left Right: Rear: Building Inspector: MARK HILLABRAND'1' Water Dist: Group Name: Project Name: ' Permits j Plumbing Perm il Contraetor: VISTA CONSTRUCTION&DEVELOPME Liceme#: VISTACD999DE TOILETSMIDF.T$ 1 $600 SINKS 1 $600 SHOWERS 1 $600 PROCESSING FEE $3500 Tota[ Pcrmit Fec: $5300 FOR PLUMBING INSPECTIONS CALL (509) 688-0054. Payment Summary Total Fees AmountPaid AmountOwine Tran Date Receipt Payment Amt $53.00 $53.00 $0.00 07/26/2005 2112 $53.00 Processed By: MIKE TURBAK PERMIT Printed By: KURTZ, KART Page I of I NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicantlpermittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee'a or property owner's expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING -when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibi l lty to comply with applicable setback provisions lies solely with the permittedneitherthe City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines, Please verity their location prior to locating your structure. Failure to properly locate the structure may require Its relocation at the owner s/permittee's expense. FOUNDATION - when forms and reinforcement are In place and prior to placement of concrete. PLUMBING - alter rough -in, before Covering, and final. MECHANICAL - rough in of piping, before covering, metal chimneys before concealment, and final. FRAMING - after all framing, bracing and blocking Is in place, rough electrical, plumbing and mechanical systems are Complete, and prior to Concealing. FINAL -when complete and prior to occupancy and/or use. All permits require final Inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a Condition of approval of this permit Items such as the installation of fire hydrants, fire department access, on-site drainage ('208'swales), road improvements, parking and landscaping are common requirements of a drool plan which must be Completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, singing, etc. installed, and prior to occupancy: completed inspection record Card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS - finer to Cover. RIGHT-OF-WAY/APPROACH - prior to placement of concretelasphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must be inspected prior to cover. Check with the Building department for `special inspectionsin conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency. Building, plumbing (includes interior reversals for sewer) and Road cuts for utilities or driveways, City of Spokane Valley mechanical, City of Spokane Valley Building Division 6880054 Public Works 688-0195 or State Dept of Transportation 324-6000 no inso oeris rel menncal wnn9. sD1,1111tD1,1111m Lzeor cereals and ineadeons for Sewer eonneanon. Spokane eauoly Wirvn nNe: Do Ana luames 324 -bee a]7 Sea Faniz and nspeaions rr on deal sysleney Spokane Regmnalezprinklerand plane eyre earand pevae eoceek roams speeuons. Spokane valley Henih mSno 924-15w One oepenmenl 191-4122 sure law Row 19122 required that poor o any e.ea✓auomne'CALL BEFORE YOU CIG came, mus re noweocell Leon you dig al level z wMny.11 in ap arop eared ep. PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared void if a) work is not stoned within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more atter beginning work, or c) after two years from the date of pemlit issuance, regardless of whether the work Is finished If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit. All refund requests must be made In writing by the original permittee to the Building Official no later than 180 days after the data of fee payment. 100% refunds will be granted for any fee erroneously paid or collected, Refunds of not more than 80% of a permit fee may be authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized when an application is withdrawn or cancelled prior to the plan review being completed Owner / Agent Date Staff Approval Date