2002, 07-31 Permit: 02006467 ACSPOKANE COUNTY DIVISION OF BUILDING AND CODE ENFORCEMENT
1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050
(509) 477-3675
SITE INFORMATION
Projcat Name:
Permits
Mechanical P,,Rdt Cantr—tor: AILIEDHEATINGINC Lirmsek: ALLILI`20OD4
PROCESSING GEE $25,00 IIL'AT PUG1P OR A/C 0-3 TONS 1 512.00
Total Permit Fee: 537 00
FOR MECHANICAL INSPECTIONS CALL (509) 477-3675.
Payment Summary
Total F.. AmnunlP:'d AmountOwine Tran Date Recce PavmentAunt
$3700 $37,00 $0,00 7/31/02 5793 $37.00
PAYMENT SUMMARY
Processed Bp: BURRIS, R013IN PERMIT
Printed Bv: WENDEL, GLORIA Page 1 of 1
Site Information
Project Information
Site Address:
7314 E8TI-IAVE
Project Numhec 02006467 Inv: I
Issue DaW 7/31/02
SPOKANE, WA 99212
Perrit Use: ALR CONDITIONER
Parcel Number:
35244 0108
Subdivision:
WOODLAWN PARK
Applicant: ALLIED HEATING INC
Black:
Lot:
10213 E BUCKEYE LN
booing:
UR -3 UUGu Resfdenfial3 5
SPOKANE, WA 99206
Phone (509) 928-8252
Contact: ALLIED HEATING INC
Owner:
BERGER, STELLA
10213 E BUCKEYE LN
Address:
7314 E 8TH AVE.
SPOKANE., WA 99206
Phone: (509) 928-8252
SPOKANE, WA 99212
etbacks - Front haft Right:
Be.,:
Building Inspector: MARCS"fRAUB
Water Diet:
Projcat Name:
Permits
Mechanical P,,Rdt Cantr—tor: AILIEDHEATINGINC Lirmsek: ALLILI`20OD4
PROCESSING GEE $25,00 IIL'AT PUG1P OR A/C 0-3 TONS 1 512.00
Total Permit Fee: 537 00
FOR MECHANICAL INSPECTIONS CALL (509) 477-3675.
Payment Summary
Total F.. AmnunlP:'d AmountOwine Tran Date Recce PavmentAunt
$3700 $37,00 $0,00 7/31/02 5793 $37.00
PAYMENT SUMMARY
Processed Bp: BURRIS, R013IN PERMIT
Printed Bv: WENDEL, GLORIA Page 1 of 1
NOTICE
Itis the responsibility of the applicanl/permittee, not Spokane County, to see to it that the use described on the front of this permit complies with
applicable codes and requirements and that required inspections are requested. Failure to request required inspections and obtain the necessary
approvals prior to progressing beyond the point where inspections are required may necessitate removal of certain pans of the construction at the
applicant's/permitteo's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by County Code:
1. FOOTING - when forms and reinforcement are in place and prior to placement of concrete—all structures, including manufactured homes.
NOTE: This inspection includes review of the structure's setbacks from property linea. Minimum setbacks are established by County zoning
regulations. Typically, side and rear yam setbacks are measured from property lines, while setbacks for yams abutting streets are measured from
the property line or the center line of the roadway right-of-way, whichever provides the greater setback from the center line of the roadway right -oh
way. Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas, the County Can own as much as 20 feet of
right-of-way between your property and the actual improved street/curb, The responsibility to comply with applicable setback provisions lies solely
with the permittee—neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your
property lines. Please verity their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the
owners/perminee's expense.
2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete.
3. FRAMING - after all framing, bracing and blocking is in place, and prior to concealing.
4. INSULATION - prior to the installation of drywall.
S. PLUMBING - after rough -in, before covering, and final.
6. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final.
7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. All permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of she Improvements (typically depicted on the approved site plan)
required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on -she
drainage ("208 swales" ), road Improvements, parking, and landscaping are common requirements of a permit/site plan which must be com-
pleted prior to final approval of a building or issuance of a Certificate of Occupancy.
S. MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etc, installed, and prior to occupancy; completed
inspection record card must be available on site.
In addition to the above, any plumbing or mechanical systems or material which would be Concealed by framing, drywall, concrete, etc., must be
inspected prior to cover. Check with the department for -special inspections" in Conjunction with commercial projects.
CALL 477-3675 FOR INSPECTIONS.
TO INSURE PROMPT SERVICE, PLEASE GIVE 24 HOUR NOTICE.
YOURINSPECTORIS
UNDER CERTAIN CIRCUMSTANCES, PARTS OF YOUR PROJECT MAY REQUIRE INSPECTIONS FROM OTHER AGENCIES:
• Road cuts for utilities or driveways, Division of Engineering & Roads
• Sewer connection, Division of Utilities
477-3600
4n-3604
or State Department of Transportation
or City Public Works Department
456-3000
625-6300
• On-site waste disposal system, Spokane Regional Health District
• Electrical wiring, State Department of Labor and Industries
324-1560
324.2640
• Construction in a flood plain, Division of Engineering & Roads
477-3600
PERMIT EXPIRATION AND REFUNDS
Unless othenvise noted, this permit will be considered null and void by limitation if the work authorized by the permit is not commenced or is Stopped
for a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration. At
a minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within one
year of the date of expiration for one-half the original fee, subject to certain limitations—elease call us if you have any questions.
All refund requests must be made in writing by the applicanUperminee (shown on the reverse) no later than 180 days atter the date of fee payment.
Refunds of not more than BOG of the permit fee paid may be authorized when no work has been done under the permit. No refunds may be authorized
more than 180 days after fee payment.
MISTAKE?
If you think we've made an error in processing this permit or in conducting inspections pertaining to it, or find erroneous information in the permit,
please bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be
directed to the Division of Building and Cotle Enforcement at the address found on the face of this permit.
I certify that I am the owner or am authorized by the owner to make this application and that I have examined this permit/application, state that the
information contained in it and submitted by me or my agent to compile said parmit/application is true and correct, and authorize Spokane County
to proceed with processing. In addition, I have read and understand the INSPECTION REQUIREMENTS/NOTICE provisions included herein and
agree to comply with same. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not.
I understand that the issuance of this permiVapplication and any subsequent inspection approvals or Certificates of Occupancy shall not be
Construed to give authority to violate or cancel the provisions of any state or local law regulating construction or agreement concerning this
property, or as a warmly of conformance with the provisions of any state or local laws regulating construction.
SIGNATURE OF
APPLICANT/PERMITTEE APPLICATION
OR AUTHORIZED AGENT DATE