Loading...
2003, 06-04 Permit: 03003925 SewerSPOKANE COUNTY DIVISION OF BUILDING AND CODE ENFORCEMENT iii 1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050 Slaxcr,.(tCtxNtn I Site Information Project Information Site Address: 7319 ESTHAVE SPOKANE, WA 99212 Parcel Number: 35241.4007 Subdivision: MOUNTAIN I IOME ADD Black For 7nming:UR-3 Urban ResideNiai 35 Owner: WISCI IMANN, NFIE Address: 7319 ESnIAVE SPOKANE. WA 99212 Building Inspector: NONE Water Dist Project Number: 03003925 Inv: 1 Issue Date: 6/4/2003 Permit Use: SEWER CONNECTION - WOODLAWN Applicant: ACME EXCAVATING 3021 N LILY RD AmountPaid SPOKANE. WA 99212 Phone: (509) 228-0691 Contact: ACME EXCAVATING Payment Am[ 3021 N LILY My S100,00 SPOKANE. WA 99212 Phone: (509)-8-0691 Setbacks - Front: Left: Right Rem: Group Numc Project Name: Permits I Seaver Connection Permit Cmtlnwrur: ACME EXCAVATING Licensed: ACYCEE-9821,D SLWERCONNCCI'I01, 1 $8500 PROCESSING FEE $1500 'rood Permit Ree $100,00 FOR SEWER INSPECT IONS CALL (509) 477-3604 UTILI'I IFS 830-5-00 PM MONDAY I FICJ FRIDAY Coll lot inspection prior to cover ONE WORKING DAY NOTICE REQUIRED. Contractor or applicant is Ie field locate and confirm the elevation and position of sewer stub prier to any other excavation. Sewer stubs are to be checked prior to connection to ensure that they have acceptable grade and are clear and unobstructed to the mvn sell, Sewer lines should be constructed to allow for gravity flow, from tlm lowest level of the structure. This permit maal be presonled N thejob site inspector for verification 'Ib locate buried rubles, gas piping, water fines, etc. CALL BEFORE YOU DIG, (509)456-8000. STATE LAW RCW 19.1221 EQUIRFS THAIPRIOR TO ANY EXCAVATION THE "CALL BEFORE YOU DIG" CENTER 111; NO'IfFIED. CALL BEFORE YOU DIG At LEAS'( 2 WORKING DAYS IN ADVANCE, (5(0)456-8000. Spokane Count, Code requires the r,,rdler comply with all rcquircmcnts at the Washington SNtc Dept of labor and Industries, including tho,, related to trench safety_ Processed By: BURRIS, ROBIN PERMIT Printed By: IIIN'IL, FAITH Page 1 of I Payment Summary Total Fees AmountPaid AmonntOwine Tran Date RecR� Payment Am[ $10000 S100,00 $0.00 6/42003 3497 $100.00 Processed By: BURRIS, ROBIN PERMIT Printed By: IIIN'IL, FAITH Page 1 of I NOTICE It is the responsibility of the applicanUpermittee. not Spokane County, to see to it that the use described on the front of this permit complies with applicable codes and requirements and that required inspections are requested- Failure to request required Inspections and obtain the necessary approvals prior to progressing beyond the point where Inspections are required may necessitate removal of certain parts of the construction at the applicante fourmittee, s or property owners expense. At a minimum, the following Inspections ARE REQUIRED by County Code: 1. FOOTING - when forms and reinforcement are In place and prior to placement of concrete—all structures, Including manufactured homes. NOTE: This inspection Includes review of the structures setbacks from property lines. Minimum setbacks are established by County zoning regulations. Typically, side and rear yard setbacks are measured from property lines, while setbacks lar yards sharing streets are measured from the property line or the center line of the roadway right-of-way, whichever provides the greater setback from the center line of the roadway right-of- way. Curb lines and fence lines are not necessarily Indicative of property lines. In some residential areas. the County can own as much as 20 feet of right-of-way between your property and the actual improved strebaced, The responsibility to comply with applicable setback provisions lies solely with the permittee—neither Spokane County nor Its authorized representatives assume any responsibility for the verification or location of your property lines. Please verily their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner'stpermlttee's expense - 2. FOUNDATION - when forms and reinforcement are In place and prior to placement of concrete. 3. FRAMING - atter all framing, bracing and blocking is in place, and prior to concealing. 4. INSULATION - prior to the Installation of drywall. 5. PLUMBING after rough -In, before covering, and final. 6. MECHANICAL rough In of piping, before covering, metal chimneys before concealment, and final. 7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. All permits require final inspection. NOTE: In addition to Inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site drainage ("208 insoles"), road improvements, parking, and landscaping are common requirements of a permitmits plan which most be com- pleted prior to final approval of a building or issuance of a Certificate of Occupancy. 8. MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, singing, etcinstalled, and prior to occupancy, completed inspection record card must be available on site. 9. SEWERS - prior to cover 10. RIG HT -O F-WAY/APPROACH - prior to placement of concrete, or, If gravel approach, after completion. In addition to the above. any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover- Check with the department for 'special inspections' in conjunction with commercial projects FORINSPECTIONS: TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE . PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS FROM MORE THAN ONE AGENCY. • Building, plumbing, mechanical and fire inspections, Division • Road cuts for utilities or driveways, Division of Engineering 8 of Building and Code Enforcement Roads - 48-HOUR NOTICE REQUIRED 477-3675 477-3600 or State Department of Transportation • Construction in a flood plain, Division of Engineering & Roads 456-3000 477-3600 • Sewer connection, Division of Utilities • Electrical wiring, State Department of Labor and Industries 477-3604 324-2640 or City Public Works Department 625-6300 • On-site waste disposal system, Spokane Regional Health District 324-1560 PERMIT EXPIRATION AND REFUNDS Unless otherwise noted. this permit will be considered null and void by limitation if the work authorized by the permit is not commenced oris stopped for a period of 180 days, unless a written request for an extension of the permit Is received and approved by the Building Official prior to expiration At a minimum an Inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within one year of the date of expiration for one-half the original fee, subject to certain limitations—please call us If you have any questions. All refund requests must be made in writing by the applican Vpermittee (shown on the reverse) no later than 180 days after the date of fee payment. Refunds of not more than 80% of the permit fee paid may be authorized when no work has been done under the permit No refunds may be authorized more than 180 days alter fee payment. MISTAKE? If you think we've made an error In processing this permit or in conducting inspections pertaining to It, or find erroneous information In the permit, please bring it to our attention Immediately by tiling a written request forcorreotien within 10 working days of discovery. All such requests should be directed to the Division of Building and Code Enforcement at the below address. Spokane County Division of Building & Code Enforcement 1026 West Broadway Avenne Spokane, WA 99260 Phone: (509) 477-3675 Fax: (509) 477-4703 TDD: /509) 477-7133