sp-1214a7q1
a
'a 41 — - — --------
01
� -1
SPOKANE COUNTY DIVISION OF PLANNIN_
A6
Excl 'ned and approved this oy
of -------- 2002.
�& a 0 ���
Al
LEM
p �., Spokone
111 11 RIII
RM 1n; K R-61 a 11g=.
1M.161"L11161 M1,11 11 lit
SPOKANE COUNTY
ALTERED SHORT PLAT SPm1214Aaw99
AN ALTERATION
OF TRACT B OF SHORT PLAT SP- 1 214-99 *
ORIGINALLY RECORDED IN BOOK 16 OF SHORT PLATS, PAGES 51-52,
UNDER AUDITOR'S RECORDING NUMBER 4426807,
BEING A PORTION OF THE NE 1/4 OF SECTION 26, T25N, R44E, WM
SHEET 1 OF2
DEDICATION
KNOW ALL MEN BY THESE PRESENTS that Sigurd 0. (Bud) Aoker, has caused on Atlerotion and
Spokane County does not accept the responsibility of maintaining the drainage, course on
Duplex Division of that portion of the NE 1/4 of Section 26, Township 25 North, Ran 44
'thin private lots, nor the responsibility for any damage
private lots or flood plain areas wi
East, W.M., to be known as SPOKANE COUNTY SHORT PLAT NO. SP-1214A-99, described as
whatsoever, including, but not limited to, Inverse condemnation to any properties due to
follows'.
deficient construction and/or maintenance of drainage courses in drainage easements on
private propert
Tract B of SHORT PLAT NO. SP-1214-99, per plot thereof recorded in Book 16 of Short Plots,
Pa 51 and 52, records of Spokane County, Washington;
The owner(s) or successor(s) in interest a to join *in any County— approved storm water
situate in the Count of Spokane, State of Washin
management pro and to pay such rates and charges as may be fixed through public
hearings for service or benefit obtained by the planning, design, constructing, maintaining or
Setbacks shall be determined at the time building permits ore requested unless these setbacks
operation of storm water control facilities.
ificoll drafted on this short plot. The setbacks indicated on thl plot ma be varied
are sped Is
from if proper zoning or variance approvals ore obtained.
This short plot is located within the Aquifer Sensitive Area (ASA). Treatment of storm runoff
from driveways shall be provided. The preferred method of treatment is to hove the runoff
No detached single—family dwellings or manufactured homes ore allowed on an tract, All
from drivewa sheet flow over lawn turf or notive—type grosses. If a ditch is to be used to
tracts w ith any lot line designated Center Duplex Lot. Line shall be restricted to one
collect runoff from driveways. then the ditch is to be gross—lined.
common—wall dwelling unit (one—half [1/2) duplex), provided the duplex common wall is aligned
over or with the Center Duplex Lot Llne,,ond provided that each duplex unit (half) Is totally on
in consideration of Mutual Benefits now or to be hereafter derived,, the owners do for
its side of the center lot line when sold lot line Is extended vertically be the roof line.
themselves, their heirs. grantees, assigns and successor(s) in Interest hereb request and
authorize Spokane County to include the above described property In a Rood Improvement
The owners, heirs or assigns of each dwelling unit of the duplex structure do hereby agree to
District (RID) and to support the formation of a Rood Improvement District for Improvement of
retain the color, texture and type of materials of this duplex exterior, and further a that
the rood(s) described below by requesting and authorizing Spokane Count to place their
any 'change' to sold exterior shall have the written mutual approval of both owners of each
nome(s) on a petition for the formation of a Rood Improvement District pursuant to RCW
half of the duplex prior to Initiating construction of an such 'change' to the exterior. An
36.88.050, or by requesting and authorizin Spokane Count to cost their ballot In factor of a
replacement or addition to oll part of the duplex structure shall also require mutual
RID being formed under the resolution method pursuant to RCW 36.88.030, and/or by not filin
approval. This agreement shall run with each associated lot and shall be enforced through
a protest ogoins-i-, the formation of a RID being formed under the alternative resolution method
Civil Court, and does exclude Spokane County from the terms and enforcement of sold
provided for in RCW 36.88.065 and Chapter 35.43 RCW.
a
If a RID is proposed for improvement of the rood(s) described below, said owner(s) and
Enforcement of the water and sewer systems agreement Is a civil matter between each duplex
successor(s) further agree: (1) that the improvements or construction contemplated within the
unit owner(s) and not enforced b Spokane County.
proposed RID ore feasible and (2) that the benefits to be derived from the formation of the
In the event it is necessary to replace more than fifty (50%) of either dwelling unit
RID b the property Included therein, together with the amount of an County participation,
exceeds the cost and expense of formation of the RID, and (3) that the property within the
compromising the duplex for any reason whatsoever, including but not necessarily limited to
proposed RID is sufficiently developed; provided, themselves, their heirs, grantees, assigns and
fire, explosion or other destructive forces, said dwelling unit shall be rebuilt or restored as a
successor(s) shall retain the right, as authorized under RCW 36.88.090, to object to any
duplex.
ossessment(s) on the property as a result of the improvements called for in conjunction with
Public sewers shall be constructed to provide for the connection of each parcel to the
*
the formation of a RID by either the petition or resolution method under Chapter 36.88 RCW
and to appeal to the Superior Court the decision of the Board of County Commissioners
County s system of sewerage. Uses on properties within the project shall be required to
connect to the sewer and pay applicable charged per the Count Sewer Ordinance. Sewer
confirming the final assessment roll; provided further, it Is recognized that actual assessments
connection permits shall be required.
may var from assessment estimates so long as they do not exceed a figure equal to the
increased true and fair value the improvement(s) odd(s) to the propert
A public sewer s will be mode available for the plot, and individual services will be
provided to each lot prior to sole. Use of individual on—site disposal systems shall not be
It is further acknowled and a that at such time as a RID is created or an County
authorized.
Road Improvement project 1$ authorized by Spokon*e County, the improvements required shall be
at the sole expense o f the owner(s) or property with the RID or served by the improvements
Individual tracts shall be subject to pa of current applicable sewer connection charges
wl
ithout an monetar participation b Spokane Count
and/or general facilities charges prior to the issuance of a sewer connection permit.
The RID waiver contained in this agreement shall expire after ten (10) years from the date of
Arrangements for payment of applicable sewer charges must be mode prior to issuance of
execution below. This provision is applicable to Sullivan Rood.
sewer connection permit. Sewer charges may include special connection charges and general
facilities char Charges ma be substantial depending upon the nature of the development.
IN WITNESS WHEREOF, the aforesaid part has affixed his si
q1
a
'a 41 — - — --------
01
� -1
SPOKANE COUNTY DIVISION OF PLANNIN_
A6
Excl 'ned and approved this oy
of -------- 2002.
�& a 0 ���
Al
LEM
p �., Spokone
111 11 RIII
RM 1n; K R-61 a 11g=.
1M.161"L11161 M1,11 11 lit