Loading...
2009, 09-25 Permit App: 09003046 Shop Addition Project Number: 09003046 Inv: I Application Date: 9/25/2009 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: NEW ADDITION TO EXISTING SHOP Contact: TOWN&COUNTRY Address: 5918 E TRENT AVE C-S-Z: SPOKANE,WA 99212 Setbacks:Front Left: Right: Rear: Phone: (509)535-9016 Group Name: Site Information: Project Name Plat Key: 002704 Name: UNIVERSITY PLACE District: Sout Parcel Number: 45204.0552 Block: Lot: SiteAddress: 10121 E 9TH AVE Owner:Name: DOOLIN,JEFFREY F Address: 10121 E 9TH AVE Location::CSV SPOKANE VALLEY,WA 99206 Zoning: R-3 SF Res District Water District: 098 SPO CO WATER DIST#1 Hold: LI Area: 11,250 Sq Ft Width: 75 Depth: 150 Right Of Way(ft): 60 Nbr of Bldgs: 2 Nbr of Dwellings: 1 Review Information: 4,. ... �. . Review Building Plan Review Released By: I Originally Released: 9/24/2009 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Originally Released: 9/25/2009 By: KKENDAL Operator: jmm Printed By: JD Print Date: 9/25/2009 Project Number: 09003046 thy: IApplication Date: 9/25/2009 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Contractor: TOWN&COUNTRY BLDG Firm: TOWN&COUNTRY BLDG CONT Address: 3908 W DAKIN LN Phone: (509)448-8483 CHENEY,WA 99004 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation GARAGE U-1 VB 528 $10,032.00 528 $10,032.00 Totals: 528 $10,032.00 528 $10,032.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $195.25 ACCESSORY PLANS REVIEW 1 SELECT $48.81 WSBCC SURCHARGE 1 SELECT $4.50 Permit Total Fees: $248.56 Notes: . . Payment Summary: .. �. � Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $248.56 $248.56 $48.81 $199.75 $248.56 $248.56 $48.81 $199.75 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: JD Print Date: 9/25/2009 _ i e# SCarr of lir* ��.s •;eLAV,S 'te B-3 PERMIT NUMBER:4'-.7g pokane S � } Vi/4 6 PERMIT FEE: a 4,C 9 1688 0036 FAX:(509)68$-1037 j Community Develop ent II - - ' Residential 1dstruc'jt'jt 11 New Construction n Accessory Bldg Permit Apph Name # -� ha PP Addition/Remodel n Deck ii Other: SfLb ADDRESS: /a02/ E 9 Ave5. wa 99.204 ASSESSORS PARCEL NO: '1/54201/-OS LEGAL DESCRIPTION: "'� ; 7 =w 5. lCdntraCtor i A" �` ,. ;#. in;� '. mi v-t-,Sy Br ,. .� 's -7 fA,T"{- 4, $"---):,4-,441‘%`:_--4 ,�` i.,`_" -.r?10 - `.,7.i' _ ,-,r: ter- .r_ 4: "F.:x.. -.. 7101 Name: K 7-e,(1/— Q Name:Biu rt, /rUtzZ/�y 6vs rs. Address: Jo/g/ 9ry //me Address:elf$ E 77—e.^-7— City: . poked State: 4/A Zip: 9902,96City: SPOT. State: &Jig Zip: ?/ Pho • ne: Fax:Coli 5-7"1?S Fax: �v�/4 Phone: 536- 9°."4F (.s:6V 53 y- a 830 Contractor Lic No: - Exp Date: 3°_ j/0 ;Contact'Person i_ '1 City Business Lic.No: 601057 62's Name: TG 7 ' Phone:C."of:) 53e o,z5 Describe the scope of work in detail: Cost of Project: $ A:,/tYi-77,0•.i 7, e.-,,,STi%c/ 5hp. aYw. x x'.41 -v SI/' T w,;ter I x,SV(PP/ (, r rAA,� J Proposed Use: S,ztaP c, 10)00?) **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TQ PEAK: DIMENSIONS:. t #OF SITORES: TOTA HABITABLE SPACE: i0 -o zq X 2Z; X 1L/ ® /1/l' NuUNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE MAIN FLOO TO SQ. 2 FLOOR, FTG: j/�. FTG: /ii NTT N 'f AREA: Aibel_ FINISHED BASEM T GARAGE SQ. FTG: DECK/COV. TIO SQ. FTG: 30% SLOPES O SQ. FTG: N`/iCrt/ TY: !� #OF BEDROOM : CON TRUCTION TYPE: HEAT SOU CE: SEWER R SEPTIC? N > Por FKA'i� N 4.- The The permitee verifies,acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction into be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) Ttijs City of Spokane Valley Permit is not a permit or approval for any violation of federal,state or local laws,codes or ordinances.6 ns or additi... formation may be required to be submitted, and subsequently approved before this application can be cess SIGNATUR - 7‘... a DATE: —c'_7—c' r Method of Payment: 0 Cash 0 Check 0 Mastercard 0 VISA Bankcard#: Expires: VIN#: Authorized Signature: REVISED 2/15/07 RECEIVED 09/24/2009 16:25 5096880037 SV PERMIT CENTERFR SEP-24-2009 16:18 FROM:TOWN & COUNTRY 15095342830 T0:6880037 P.2'2 �./ 44s PRtiPEF-rr 1fficthi) of 7 X012/ , de SfrX spakANY Y�u44 0,11_ 2° .DSS 1rRopoci' fkorriew Aram" 1,e- A 4:0:41e III- .1.t14- I ,7yXZ1 I frorcT t 150.4. Ii gyp" 0 Lr ._ . } R o r t i(I 7r,i c PLANNING DEPT. A PPR•VED I : :)... - ' .1, a a !. DATE: la' rii RECEIV D (...... SEP 2 4 2019 RTENFDEMT 4I) COMMUNIN DR/FL,. PhMFN r Elosi(Ai& q4 ihitkui- . For City Use Only CITYOF _ PLUS Project Number Project Address t', poIine a ° 4000.V11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a rev'd targetcgedate. Your application review TARGET DATE is 0 The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. > Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone,fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE—APPLICANT PINK—BUILDING FILE REV 9/07