sp-1195cTOGETHER NTH The ®t the ort .? 5 feet of Tract 217 First Addition To opportunity as per lot the re cor ded
In V of Flats Pugs ?;
EXCEPT the North 201.25 feet;
S
AND EXCEPT the South 300 feet of that portion of the East 1/2 of Tract 217 of sold First Addition To Opportunity, lying North of Addition to Pines (;amatory, as per plot thereof recorded In Volume 1 of Plots, Page 30 and North of Third Addition To Pines Cemetary,
as per Plot thereof recorded In V 6 of Plots, Page 62.
S ituote to the C of Spokan State of Washington.
r Side yard and rear yird setbacks shall be determined at the time building permits are
a pprovals plot may be varied from If proper zoning or variance ffi
togeth Utility easements shown on the herein described Binding Site Plan are hereby dedicated to the serving utility companies for the construction,
reconstruction, maintenance and operation of utilities. Together with the right to Inspect said utilities and to trim and/or remove brush
w ith the right to access said utility
and trees that may interfere with the construction, maintenance and operation of some, and easements through any Border Easement shown herein.
I t is o l d and ag reed that i an I is c reated or any County Road Imp rovemen t ro ct is authoriz
Spokane C ounty, the Improvements requit ll be at the I of r of property within the I or served t he
Improvements with t any monetary participation by Spokane Count
'The RID w aiver contained In this agreement shall exp ire after t 1 0) years from the t of execution below. This provision is applicable
to 12th Avenue.
The property owners within this Plot shall be held responsible for keeping o an maintaining the surf
mode drainage flow over and across their respective properties. If the property owner(s) falls to maintain the surface path of
natural or man—made drainage flow, or the drainage swols, a notice of such failure may be given to the property owner(s). If not corrected
within the period indicated on sold'notice, Spokane County has the right to correct the maintenance failure, or hove It corrected, at the
expense of the property owner.
The Border Easement as shown hereon Is hereby granted to Spokane County and Its authorized agents, and to the public for road purposes,
including but not Ilmited to curbs, sidewalks, drainage, signage. and other usage deemed necessary by e Spokane County Engineer for the
safety and welfare of the Public. No fence or portion thereof will be constructed within t ea s e ment
County Engineer, nor will any objects be placed In sold easement that would obstruct the sight distance necessary for safe and efficient
vehicular movement. Any other easements granted or dedicated within this Border easement area will be subordinate to the nights created
by this easement, and ore subject to Spokane County Engin p proc
pub lic sewer systern will be it for the I ffi and Individual service will be provided to tract prior to sol Use of
individual on—site sewage disposal systems shall not be authorized.
Pub lic sewers shall be t to rovi the n cti to the t sewerage Uses on properti
w ithin the project shall be required to to the li i e cha per the County r in nc a Sewer connecti
per mits shall be required.
Individual tracts shall be b to proxnent of current applicable connection i facilities r r to th
Issuance sewer connection permit.
The use of private wells and water systems Is prohibited.
The public water system, pursuant to the Water Pion approved by County and State Health authorities, the local are district.
County Division of Building and Planning, and the water purveyoI shall be installed within this short plot, and the applicant shall
provide for IndMduol domestic water service as wetl as fire protection to each tract prior to sale of each tract and prior to Issuance
of a building permit for each tract.
A UDITOR " S CER TIFICA TE
Filed for record this --day of 1999
at---M In Book----of Short Plats on .n.
the request of
W. WA 1
Examined and approved this _day of
Spokane County Eng inee r
approv Elm
Examined and this day of 1 1991
f oregoing Spokane County Uflities
STATE OF WASHINGTON)SS
On thisI&R-day ofutp�1999 before me appeared GARY F. BARNES known to be president of G.F. Barnes Construction Inc.
as the individual who executed the within and d acknowledged the some to be his free and Examined and approved this day of
purpos voluntary act and deed for the us" and A _ ed.
IN wITNESS %fiEREOF, I have hereunto set my h and offlxed my ofififial seat the day and year first above written.
My co mmission expire
R esidi ng "
IN VATNESS WHEREOF, I have hereunto set my hand and affixed my seat this of
GARY F. BARNES
F. BARNES CONTRUCTION INC.
NOT NO TAIGI PUIS -40 STA OF WASHINGT
COMM ISSION EXPIRES. JULY 8, 2002
1t lytlill 11 �Ikllll
.5. its A r
x
Examined and ap
Spokane County B irector of coil _ P l an nin g
Examined d approved this day of
19
Elm
1, Treasurer of Spokane County, Washington, do hereby certify that all taxes
which be levied and become chargeable against the land shown
within this map and fully paid, satisfied, and discharged.
de in the dedication of this date, have been
dated t
13791 ,clwg 09/14/99 07't2020 AM P