2001, 10-16 Permit: 01009147 CarportSPOKANE I.OUNTY DIVISION OF BUILDING
t AND CODE ENFORCEMENT
If 1026 1026 WEST BROADWAY AVENUE • SPOKAN'Er WA 99260-0050 J
a'Nrl Uuryti
Site Information Project Information
Site Address:
9625 ESIN AVE
Permit Use: 20 X 16 CARPORT
SPOKANE, WA 99206
Parcel Number:
45202.1525
Subdivision:
KELLOGG PARK SUB
Block:
Lot:
Toning:
UR -7 Urban Residential -7
Owner:
JACOBSON, ROY
Address:
710 S FARR RD
Setbacks -Franc: 40F Left: 52 Right:
SPOKANE, WA 99206
Building Inspector: DAN HOWARD
Water Dist:
Sq Ft: 320
Project Number: 01009147 Inv: I
Issue Date: 10/16/01
Permit Use: 20 X 16 CARPORT
Apphcaul: JOHNSON, KINIBERLE K.
9625 E 8TH AVE
SPOKANE, WA 99206
Phone: (509) 536-1855
Contact: JOHNSON, KINIBERLE K.
54950
9625 E SPH AVE
SPOKANE, WA 99206
Phone: (509) 536-1855
Setbacks -Franc: 40F Left: 52 Right:
33 Rear: 32
Group Name:
Project Name:
Processed By: FRAZIER, CAROL REV SITE
Printed By: WENDEL, GLORIA Page 1 of 1
Permits
Building Petal $ Contractee. OWNER
le -.e4: OWNER
Ncw Building CARPORT
U-1 VN
320 RESIDENTIAL VALUATION
54950
STATESURCHARGE
$450
M. 20 SIG IStory Total Valae:
$14000
RESIDENTIAL SURCHARGE
510.89
Sq Ft: 320
Grp: U-1 Type: VN
Total Permit Fee:
564.89
FOR BUILDING INSPECTIONS CALL (509) 477-3675.
Payment Summary
Total Fees AmountPaid AmountOsine
Tran Date
Recce Paverenl Am/
$64.89 364.89 $000
10/16/01
8278 $64.89
Processed By: FRAZIER, CAROL REV SITE
Printed By: WENDEL, GLORIA Page 1 of 1
NOTICE
It Is the responsibility of the applicantper,sume, not Spokane County, to see to It that the use described on the front of this permit complies with
applicable codes and requirements and that required Inspections are requested. Failure to request required Inspections and obtain the necessary
approvals prior to progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the
applicant &permittee'a or property owner's expense. At a minimum, the following inspections ARE REQUIRED by County Code:
1. FOOTING - when forms and reinforcement are n place and prior to placement of concrete—all structures, including manufactured homes.
NOTE: This inspection Includes review of the structure's setbacks from property lines. Minimum .setbacks are established by County zoning
regulations. Typically, side and rear yard setbacks are measured from property Imes, while setbacks for yards abutting streets are measured from
the properly line or the center line of the roadway right-of-way, whichever provides the greater setback from the center line of the roadway right-of-
way. Curb Imes and fence lines are not necessarily Indicative of property lines. In some residential areas, the County can own as much as 20 feet of
right-of-way between your property and the actual Improved streebrood, The responsibility to comply with applicable setback provisions lies solely
with the permittee—neither Spokane County nor Its authorized representatives assume any responsibility for the verification or location of your
property lines. Please verify their location prier to locating your structure. Failure to properly locate the structure may require Its relocation at the
ne/stpermlttee s expense.
2. FOUNDATION - when forms and reinforcement are In place and prior to placement of concrete.
S. FRAMING - after all framing. bracing and blocking Is In place, and prior to coneealing-
4. INSULATION - prior to the installation of drywall.
5. PLUMBING - alter rough in before covering, and final.
6. MECHANICAL - rough in of piping, before covering, metal chimneys before concealment, and final.
7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. &R permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan)
required by ordinance or as a condition of approval of this permit. Items such as the Installation of fire hydrants, fire department access, on-site
drainage ("208 swales"), road Improvements, parking, and landscaping are common requirements of a permilesite plan which must be room
plead prior to final approval of a building or issuance of a Certificate of Occupancy.
8. MANUFACTURED HOMES- Final Inspection required when complete, stairs, handrails, sending etcinstalled and prior to occupancy, completed
inspection record card must be available on site.
9. SEWERS - prior to cover
10. RIGHT-OF-WAY/APPROACH prior to placement of concrete, or, it gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be Inspected
prior to cover- Check with the department for 'special Inspections" In conjunction with commercial projects.
FOR INSPECTIONS:
TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE .
PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS
FROM MORE THAN ONE AGENCY.
• Building, plumbing, mechanical and fire inspections, Division • Road cuts for utilities or driveways, Division of Engineering &
of Building and Code Enforcement Roads - 48-HOUR NOTICE REQUIRED
477-3675 477-3600
or State Department of Transportation
• Construction in a flood plain. Division of Engineering & Roads 456-3000
477-3600
• Sewer connection. Division of Utilities
• Electrical wiring, State Department of Labor and Industries 477-3604
324-2640 or City Public Works Department
625-6300
• On-site waste disposal system. Spokane Regional Health District
324-1560
PERMIT EXPIRATION AND REFUNDS
Unless otherwise noted, this permit will be considered null and void by limitation If the work authorized by the permit is not commenced or is stopped for
a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration. At a
minimum an inspection should be requested at least once every 180 days to assure the validity of the permit A permit may be renewed within one year
of the date of expiration for one-half the original fee, subject to certain Iscoations—please call us if you have any questions.
All refund requests must be made in writing by the applican /permittee (shown on the reverse) no later than 180 days atter the date of fee payment.
Refunds of not more than 80% of the permit fee paid may be authorized when no work has been done under the permit. No refunds may be authorized
more than 180 days after fee payment.
MISTAKE?
It you think we've made an error in processing this permit or in conducting inspections pertaining to It or find erroneous information in the permit, please
bring it to our attention immediate by filing a written request for correction within 10 working days of discovery. All such requests should be directed to
the Division of Building and .—6pfcrescent at the below address.
�...�3
Spokane County Division of Building & Code Enforcement
1026 West Broadway Avenue
Spokane, IVA 9926(/
Phone: (509) 477-3675 Pttx: (509) 477-0703 TDD: (509) 477-7133