2008, 08-08 Permit: 08003094 Heat Pump. ACSo ane
jVa11ey9
BUILDING DIVISION
11703 E. Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Site Information Project Information
Site Address: 9807 E 8 r AVE Project Number: 08003094 Inv: 1 Issue Date: 08/08/2008
Permit Use: 1 HEAT PUMP/AIR CONDITIONER
Parcel Number:
45202.1335
Subdivision:
Block:
Lot:
Zoning:
MF -2 MF HDR District
Owner:
RUST, FRED & JANIS
Address:
9807 E 8TH AVE
SPOKANE, WA 99206-3581
Building Inspector:
SOUTH
Water Dist:
SPO CO WATER DISTk3B
Applicant: BANNER FURNACE &FUEL
122 N HELENA
SPOKANE WA 99202
Contact: BANNER FURNACE & FUEL
122 N HELENA
SPOKANE WA 99202
Setbacks - Front: Left: Right:
Group Name:
Project Name:
Phone: (509)535-1711
Phone: (509)535-1711
Rear:
Permits j
Mechanical Permit Contractor. BANNER FURNACE &FUEL CO INC License N:_ BANNFFF378NT
HEAT PUMP OR A/C 0-3 TONS 1 $12.00 PROCESSINGFEE $35.00
Total Pcrmit Fee: $4700
FOR MECHANICAL, INSPECTIONS CALL (509) 688-0054.
Payment Summary
Total Fees AmountPaid AmountOwine Tran But R,� Payment Amt
$4200 $47.00 $0.00 08/08/2008 15254 $47.00
Processed By: Main, Jodi L PERMIT
Printed By: PATRICIA PRINCE Page 1 of I
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by
definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the
applicanVpermittee that the use described on the front of this permit complies with applicable codes and that required
inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the
construction at the applicant's/permittee's or property owner s expense. At a minimum, the following inspections ARE
REQUIRED by City Code:
FOOTING -when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes.
NOTE: This inspection Includes review of the structures setback from property lines. Minimum setbacks are established by City of Spokane
Valley Ordinance. Curb Imes and fence lines are not necessarily Indicative of property lines. The responsibi Illy to comply with applicable
setback provisions Iles solely with the permittee -nether the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines- Please verify their location prior to locating your structure - Failure to
properly locate the structure may require its relocation at the owner 's/permiaee's expense.
FOUNDATION -when forms and reinforcement are In place and prior to placement of concrete.
PLUMBING — after rough in, before covering, and final.
MECHANICAL - rough in of piping, before covering, metal chimneys before concealment, and final.
FRAMING -biter all framing, fir adng and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to
concealog-
FINAL -when complete and prior to occupancy and/or use. All permits require final Inspection.
NOTE'. In addition to Inspection of the structure, this Inspection includes review of site Improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access,
on-site drainage ('208'swales), road improvements, parking and landscaping are common requirements of a per ciesite plan which must be
completed prior to final approval of a building or Issuance of a Certificate of Occupancy.
MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etc, installed. and prior to occupancy:
Completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover.
RIGHT OF-WAYIAPP ROACH - prior to placement of concrete/asphalt or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etcmust
be inspected prior to cover. Check with the Building department for `special inspectionsin Conjunction with commercial projects.
FOR INSPECTIONS
Please give one working day/24 hour notice- Different parts of your project may require permits and inspections from more than one agency.
Building, plumbing (includes interior reversals for sewer) and
mechanical, City of Spokane Valley Building Division 688-0054
11-11 ane in:vaeoc lo, alaanml mnnp. Find onoanirenl R Lads,
And davabes 324Pas
nanarn ndie :u d...in—. avrlene R.y,r a1
Heardderec s2a-15Wnr
Road cuts for utilities or driveways, City of Spokane Valley
Public Works 688-0195 or State Dept of Transportation
324-6000
171 Innm ira,va, nd An be—, connea,on. sene nFaorally liaa: np—ed
ca
Eve spank , and alarm Symms and onaaie access mar am-nrns. spokaen vale,
r,,e neWdnenl No 4122
Sark law Raw 1s. 122 d,arcs Inaf pro, Ir any -d -ton the TALL BEFORE YOU 01(j ...ler neu be nu'ed. Gal neirre yrd dig allea, , wean, aayz in ad.arca. 11fi.oB0
PERMIT EXPIRATION AND REFUNDS
All permits shall expire by limitation and be declared void If a) work is not started within 180 days of obtaining a permit, or b) work is
abandoned for 180 days or more after beginning work, or c) after rwo years from the date of permit Issuance, regardless of whether the work is
finished. If a permit Is expired for time, a new permit may be obtained for halt the permit fee based on the value of the remainder of the work to
finish the original permit.
All refund requests must be made In writing by the original permiLee to the Building Official no later than 180 days after the date of fee
payment. 100% refunds will be granted for any fee erroneously paid or collected- Refunds of not more than 80% of a permit fee may be
authorized when no work has been done under the permit Issued. Refunds of not more than 80% of a plan review fee paid may be aumor'acd
when an application is withdrawn or cancelled prior to the plan review being cOmpleted
-
Owner/Agent Date
Staff Approval Data