2010, 10-12 Permit App: 10003316 Reroof, Porch GableProject Number. 10003316 Inv: I Application Date: 10/12/2010 Page l oft
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: REROOF, BLD PORCH GABLE ON FRONT OF Contact: FULL BOHR CONSTRUCTION
HOME Address: 2508 W LIBERTY
C - S - Z: SPOKANE WA 99205
Setbacks: Front Left: Right: Rear: Phone: (509)994-6048
Group Name:
Site Information: Project Name:
Plat Key: 002704 Name: UNIVERSITY PLACE District: Sout
Parcel Number: 45204.0775 Block: Lot:
SiteAddress: 9910 E 8TH AVE Owner: Name: BERREMAN, F E & B E
Address: 9910 E 8TH AVE
Location:: CSV SPOKANE VALLEY, WA 99206-350
Zoning: R-3 SF Res District
Watcr District: 098 SPO CO WATER DIST#1 Hold:
Area: 7,500 Sq Ft Width: 50 Depth: 150 Right Of Way (ft): 60
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Review Information:
Review
Building Plan Review Released By
Originally Released: 10/12/2010 By: tmelbourn
Landuse/Zoning/IIE Conditions f Released By:
Originally Released: 10/12/2010 By: tschmidt
Permits:
Operator: jmm Printed By: jmm Print Date: 10/12/2010
Project Number: 10003316 Inv:1 Application Date: 10/12/2010
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Building Permit
Contractor: FULL BOHR CONSTRUCTION
Firm:
FULL BOHR CONSTRUCTION
Address: 1312 S HERALD
Permit Twe
Phone:
(000) 000-0000
SPOKANE WA 99206
Building Permit
$219.05 $219.05
$61.30
$157.75
This Application: Total Project
Description Gro TvQe
Notes
So Ft
Valuation So Ft Valuation
COV DECK R-3 VB
REROOF/PO
0
$7,500.00 0 $7,500.00
RCH
Totals:
0
$7,500.00 0 $7,500.00
Item Description
Units
Unit Desc
Fee Amount
RESIDENTIAL PERMIT FEE
1
SELECT
$153.25
WSBCCSURCHARGE
1
SELECT
$4.50
SF PLNS RV W <7999 So FT
1
SELECT
$61.30
Permit Total Fees: 5219.05
Notes:
Payment Summary:
Permit Twe
Fee Amount Invoice Amount
Amount Paid
Amount Owine
Building Permit
$219.05 $219.05
$61.30
$157.75
$219.05 $219.05
$61.30
$157.75
Page 2 of 2
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance ofa permit shall not be construed to be it permit for, or an approval of, any violation ofany of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: joint Printed By: jmm Print Date: 10/12/2010
Scnror � 11703 E Sprague Ave, Suite�B 3
pokane Spokane Valley, WA 992Q6
�Ualley° (50 688 0036E 4,FAAX (50§)688 0Qj ,
ww� s okanev tear
Community Development I
Residential Construhtion 1
Permit Application
SITE ADDRESS:
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
PERMIT NUMtlER:
PERMIT FEE:
❑ Accessory Bldg
❑ Deck
Building Owner: m.r
( un
Contractor:
TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ.
FTG
�A$
Name:
Name:
Address: C\0,t1p FS
GARAGE SQ. FTG:
Address: LSO$ L`J L -r Jt
City: LJp
State: LiZip: I
to
City: 5 DlAktnL St Zip: 226
Phone: Fax:
Phone:kAt�_4,,4 6 Fax:
i f tl i'p pate: o Z Zo V
Contractor Lic No: I _-V W
Contact Person
City Business Lic. No:
Name:
Phone:
e) iL
Describe the scope of work in detail: Cost of Project: $ 15 DO . O6
Proposed Use:
**************The fnllnwine MUST be complete: (write N/A if not aonlicable)**********************
HEIGHT TO PEAK:
DIMENSIONS:
# OF STORIES:
TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ.
FTG
2 FLOOR SQ. FTG:
UNFIN BASEMENT SQ. FTG:
-
IMPERVIOUS SURFACE
AREA:
FINISHED BASEMENT
SQ. FTG
GARAGE SQ. FTG:
DEC COV. PATIO SO. FTG:
3 _
30% SLOPES ON
PROPERTY:
# OF BEDROOMS:
CONSTRUCTION TYPE:
HEAT -SOURCE:
SEWER OR SEPTIC?
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code, Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processe .
SIGNATURE: //a'_�
DATE: °I-
Method of Payment: `
❑ Cash ❑ Check ❑ Mastercard ❑ VISA
Bankcard#: Expires: VIN#:
Authorized Signature:
REVIa ED vl s07
For City Use On! I �,�
PLUS Project Number ✓DQ11
Spokane Project Address
j Valley®
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ir Fax: 509.688.0037 4 permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
This for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive Flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -contraction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK -BUILDING FILE REV 9ro7
DLM YWtly
V'A
d
I�
N
btu'—Vf —�o�i
REGM\��O EP PLANNING DEPT. APPROVED
clsJ Ocj \ \ ti0\o BY
DATE: ob2L
ISO k
T
N