1990, 11-15 Permit App: 90006185 Sewer*
���
SP��K/���E������N��DEP ` ARTMEN7OF BUILDINGS
N/.1303BROADWAY AVENUE
SPOKANE, WASHINGTON A9160
(500) 456^3075
SIGNATURE OF APPLICATION
OWNER V8AGENT vx/E
PROJECT NUKD[k= 98G06i85
GATE= ii/\5/90 PAC[= 6\
APPLICATION
APPiICATIOk
EIT[ STREET= 9928 [ 8`11H
ADDR[%%= SPOKANE WA
�ARC[L�= Z0544~6765
PERMIT UEE= SEWER CONNECTION
***
SEE NOTE ***
RIM= 002M4 PLAT NAMF= IINTVF:RSIIY PLACE
BLOCK= 7 LOT= 2 ZONE= ACSJB DI%TO- E
AREA= :0888066 F/A= F 4IDTH= DFPTH= k/W= 60
-N OF BLCr%= I m DWLLLINGJ= I
W f 4 [K� GARCIA, GIL PHONE=
STREET= 9926 E BUT AVE
ADDREM%= SPOKANE Q4 99266
BUILDING 3E`^^CK~A^ONT= ^A~LEFT= NA RIGHT= NA REAR= UA~
SEWER PERMIT
C(INTRACTOR= TOM ETONETnNF. EXCAVATING
STREET= M2 N HAH[R KD
ADDRESS= JPbKANE WA 97216
PHONE= ;07 92S 7710
ITEM 8[%MlPTlON
DUANTITY
FEE AHOUHT
-------~~-
-----ROCE%�I----H�- --~~-~~~--~--
PFLE
-------~
Y
511
SEWER CONNECTION
i
48.06
PERMIT TYPE FEE
AMOUNT
AMOUNT PAID
AHDUNT OW] NG
�EWER P[PMIT
56,68
50^ol�l
-----~-~~~---
MO6
------------
M
~~~----------
M8o
PROCESSED BY, JULIE %HATTO
PRINTED Gy� JULIE SHATTO
SEWER STUB AS -BUILT INFORMATION IS AV4ILAD1.E AT THE C0UNTy
UTILITIES DEPAQ7MEV- ' �x6-3684)
CONTRACTOR DR APPLICANT IS TO FIELD LOC4TE AND COHFlRM THF
ELEVATION AND P09lTION OF %EWER STUB PRIOR TO ANY OTHEC
EXCAVATION
TO LOCATE BURIED CABLES, GAS MING, WATER MEJ, EM
CALL BEFORE YOU DIC (456-8808)
SEWER STUBS ARE TO BE CHECKED PRIOR TO CONNECTION TO IH70KE
THAT THEY ARE CLEAR AND UNOBSTRUCTED T; T14E -,EWER MAIN
********» CALL FOR INSPECTION PKD� Tfl CO;ER
*****»*** 24 HOUR NOTICE REQUIRED
456-3664
TIAANK YOU
Project
Address:
noir
Date:
SPECIAL CONDITION CHECKLIST
Project #_ _
idition:
Special Insp. Final Report
Hydrant ( )
Lock Box
RID/CRP
Easements
Road Plans/Improvements
Bonds
Bond.
Double Plumbing .-__—_
Init
(in)
Appr:
(out)
THISSPACE FOR COMMERCIAL PLANSTRACKING, CERTIFICATE OFOCCUPANCV
Date received for C/O processing: - . Plans pulled for final processing:
Temporary C/O issued:-- . Certificate of Occupancy issued:
Office file review by. ___ . Date:
Filed map finaled by: __ . Date:
Ninety days after C/O issuance:
Owner/contractor called regarding the return of plans:
Plans returned-
No response from owner/contractor- plans destroyed
. Date'.
Received by: