Loading...
2012, 03-27 Permit App: APR-2012-0008 ApproachSpokane j%11eys Community Development cepa True.. Permit Center 11703 East Sprague Avenue, Suite 0-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 permiticenterifisookene,alley,om y tJiarr wv ur YI /P/G.-ZO2 _LGC a' PERMIT NUMBER: PERMIT FEE: 6 5 2.G - APPROACH PERMIT APPLICATION DRr1TFf T ADDRFCC: 11 n 1/l T 8 STARTDATE• R{ -Z -1Z ANTICIPATED COMPLETION DATE: BUILDING OWNER N/A -ME: �> MAILING ADDRESS: 1 (70 1 t� E b l 1I11 �.j/� CITY: SiD�.a�P JM� STATE: PrI zIP: /"/y�b6 CONTACT PERSON NAME: In q I U' L C C) fs��P"7 PHONE: (5t,4536 —')I,1' II FAx: CELL iirff%l V CONTRACTORNAME: aCc7'\✓v1, PS Cain�T'u[.%,,dr� CONTRACTOR LICENSE NO.: C`91% 1 G i$ O DK EXPIRES: 3-0-13 CITY BUSINESS LICENSE NO.: 60Q ffl 191 ri�wI PROJECT DESCRIPTION (Please Provide Site Sketch) IJ Residential Driveway [] Commercial/Industrial Driveway [I Existing Curb & Gutter ❑ Rural Road Section [a Culvert Installation ❑ Sidewalk Repair/Construction ❑ Other Conditions: Bond/Insurance certification must be on file with the City. DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling Is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit more to the property owner. 3) The signatory Is the property owner or has permission to represent the property owner in this transaction. 4) All construction Is to be done In full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit Is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. fi) Plans or additional Information may be required to be submitted and subsequently approved before this application can be processed. http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Approach_Permit_1-11-11.doc APPROACH PERMIT APPLICATION REQUIRED SKETCH INFORMATION (Revised 1/25/10) Provide required measurements (In sketch boxes), and Include street name. Check all existing conditions that apply: ❑ Sidewalk _ It wide _ ft from back of curb ❑ Streetside Swale ❑ Drainage Ditch ❑ Drywall (show location on sketch) ❑ Other (please describe below) w� DISTANCE FROM Commercial Approaches z NEAREST PROPERTY LINE 75'minimum Separation between Approaches (measured from centerline to centerline of each approach) �AY BE LEFT ORRI SIFT SIDE) FT (SEE TABLE) See Page 7-27 in City Street Standards aI 16' min. 30' max. 30' min. 40' max. tt 4 feet typical 4 feet typical - al CONCRETE CURB Minimum Distance from Crosswalk APPROACH RETURN CURB 1-4-4--THROATWIDTH QFT--ry--4'-'M WING (SEE TABLE) WINO If CORNER LOT, DISTANCE FROM STREET NAMEJ CURB RETURN =FT (SEE TABLE) STREET WITH CURB DISTANCE FROM z NEARESTPROPEFOY LINE MBE LEFT OR RGHT SIDE) FT (SEE TABLE) O i 5RADIUS RADIUS XI al ASPHALT APPROACH RETURN EDGE OF f TFROAT WIDTH =1FT (SEE TABLE) IF CORNER LOT, ASPHALT DISTANCE FROM STREETNAMEJ RADIUS RETURN =FT (SEE TABLE) STREET WITH ASPHALT EDGE Approach Requirements: • Maximum 2 approaches per property frontage; one on arterials. • Total width of approaches not to exceed 50% of frontage width. Residential Approaches Commercial Approaches Distance from Curb/Radius Return 15' minimum 75'minimum Separation between Approaches (measured from centerline to centerline of each approach) None specified See Page 7-27 in City Street Standards Throat Width flatPortion) 16' min. 30' max. 30' min. 40' max. Wing Width at curb line 4 feet typical 4 feet typical Minimum Distance from Side Property Line r w 5.0' 5.0' Minimum Distance from Crosswalk 5' 5' Fz qTO a a ` � " LL a� a P ro?d I -r H 1{V2, �, vY°"� 5�� OP, l � _C fh I.til 7 C17 ;7 aw,00 ` Development Engineering Y�'1S�U1 SVdll� 11707 E Spnyue Ave State 106 9 Spokane Valley WA 99206 509.921.1000 1 Fax: 509.921.1008 • dtyha11eepolonevalley.0r9 Approach Permit Application Review TO: Building Department Site Address: 10010 E 8t6 Avenue Project No: APR -2012-0008 Reviewed By: i ) � `G C ! � - Date: 1 Accepted Not Accented Approach X Buildin2 Location Paved Access Note: Saw cutting of existing curb to create an approach is not allowed within the City's jurisdiction. Note: Driveway is to be inspected by the City's ROW Inspector prior to concrete placement. Note: Approach to be constructed per City of Spokane Valley Street Standards Standard Plan R-114 (attached). Reviewed By: i ) � `G C ! � - Date: 1 M ZIMZF DRNEWAYAPPROACH ASPHALT STANDARD PLAN Na R-114