2006, 07-14 Permit: 06002719 ReroofProcessed By: Main, Jodi L PERMIT
Printed By: Blake. Anita M Page I of I
BUILDING DIVISION
Son ot
PO&n/ e
Valley
707 E. Sprague Avenue, Suite 106
Spokane Valley, WA 99206
Site Information
Project Information
Site Address: 10108 F 8TH AVE
Project Number: 06002719 lav: I Issue Date: 07/14/2006
Permit Use: RFROOF
Parcel Number: 45204.0546
Subdivision:
Applicant: MORRIS CLARK SIDING & ROOFING
Block: Lot:
2728 E GARLAND AVE
SPOKANE WA 99207 Phone: (509) 482-2833
Zoning: UR -3 Urban Residential 3.5
Contact: MORRIS CLARK SIDING & ROOFING
Owner: I IAYFIELD, CHARMAINE
2728 E GARLAND AVE
Address: 10108 ERED AVE
SPOKANE WA 99207 Phone: (509)482-2533
SPOKANE VALLEY, WA 99216
Setbacks - Fron[: Left: Right. Rear:
Building Inspector: BOB BGBOU'f
Water Dist: SPO CO WATER DIST03B
Group Name:
Project Name:
Permits
Building Permit Contractor: MORRIS CLARK SIDING & ROOFING License d: MORRICS062RA
REROOI-
R-3 VR 0 REMDFNTIAL PE RMI IFEE 513925
WSBC SURCHARGE $450
Total Value
$6450.00 - -
Total Permit lee: $143 75
FOR BUILDING INSPECTIONS CALL (509) 688-0054.
Payment Summary
Total Fees AmountPud Amoun 0c,ine
Tran Date Receipt Payment Amt
$14375 $143.75 $0.00
07/142006 6115 $143.75
Processed By: Main, Jodi L PERMIT
Printed By: Blake. Anita M Page I of I
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by
definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the
applicamUpermittee that the use described on the front of this permit complies with applicable codes and that required
inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the
construction at the applicant's/perminee's or property owner's expense. At a minimum, the following inspections ARE
REQUIRED by City Code:
FOOTING - when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes.
NOTE-. This inspection includes review of the structure s setback from property lines. Minimum setbacks are established by City of Spokane
Valley Ordinance. Curb lines and fence lines are not necessary indicative of property lines. The responsibility to comply with applicable
setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to
properly locate the structure may require its relocation at the owner's/permittee's expense.
FOUNDATION —when forms and reinforcement are in place and plural to placement of concrete.
PLUMBING — after rough -in, before covering, and final.
MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final.
FRAMING —after all framing, bracing and blocking Is In place, rough electrical, plumbing and mechanical systems are complete, and prior to
concealing.
FINAL -when complete and prior to occupancy and/or use. All permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this permit Items such as the installation of fire hydrants, fire department access,
on-site drainage ('208'swales), road improvements, parking and landscaping are common requirements of a per li laity, plan which must be
completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etc, installed, and prior to occupancy;
Completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover.
RIGHT-OF-WAY/APPROACH - prior to placement of concrete/asphalt or, if gravel approach, after completion.
In addition to the above. any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must
be inspected prior to cover. Check with the Building department for "special inspections" in cenjunction with commercial projects.
FOR INSPECTIONS
Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more Nan one agency.
Building, plumbing (includes Interior reversals for sewer) and Road cuts for utilities or driveways, City of Spokane Valley
mechanical, City of Spokane Valley Building Division 658-0054 Public Works 688-0195 or State Dept of Transportation
324-6000
Pemrl,.. msCevona ld bb111a1-As orally Depanmenl of tater Pemis al -of in zPehAA In El ConneNon. Spokane County WLLel Dvven
And mdennes 324.2640 117 s a
Eel Yd n ane eua ryslelrsue
. riCA-e Regmn I le and at.-ayalert¢ nr
and Pare acau road inspons eedspovane valley
,n
realm Idos]2a tep
o. Are skin nl a124122
Sure law now la 121 rnlares lural pna ro any vcavaeon Ihe'CALL BEFORE YOU DIG -center -sl he no,fied Call perore you as al leael2 wwkmg dap in adaantt. 456Ann0.
PERMIT EXPIRATION AND REFUNDS
All permits shall expire by limitation and be declared void if a) work is not stoned within 180 days of obtaining a permit, or b) work Is
abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is
finished If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to
finish the original permit.
All refund requests must be made in writing by the original permittee to the Building Official no later than 188 days after the date of fee
payment. 1DO % refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be
authorized when no work has been done under the permit Issued. Refunds of not more than 80% of a plan review fee paid may be authorized
when an application is withdrawn or cancelled prior to the plan review being completed.
Owner / Agent Date
Staff Approval Data
City of Spokane Valley
Building Dept
Receipt
Receipt Number: 6115 Customer Number
Projects
Full
ProjectNb Inv Nbr FeeAmt InvAmt Owing PAID Pmt
06002719 1 $143.75 $143.75 $143.75 $143.75 O
Total. $143.75 $143.75 $143.75 $143.75
Miscellaneous Items
Printed. 07/14/2006 3:10:35 PM Page I of l
Total PAID:
$143.75
Tender
Tyne
Check Acct
Balance CCNbr Exp Do
TF,NDERED
VISA
xxxxxxxxxxxx0003 06/2008
143.75
Payer:
Total TENDERED:
143.75
Over /(Short)
$0.00
Change
$0.00
Notes:
Tran Date/Time:
07/14/2006 3:10:34 PM
By:
A_Blake
Logon User:
bldgdesk
Station:
CX_SV00015
Override By:
Printed. 07/14/2006 3:10:35 PM Page I of l