2008, 08-01 Permit: 08002977 Air HandlerGroup Name:
Project Name:
Permits
Mechanical Permit Contraetor: R&RHEATING&AIRCONDINC License #.- RRHEAA'106BW_
AIR HANDLER-10,000CFM 1 $1200 PROCESSING FEE $3500
Total Permit Fee: $4700
FOR MECHANICAL INSPECTIONS CALL (509) 688-0054.
Payment Summary
Total Fees AmountPaid AmountOwin¢ Tram Date Recce Payment Amt
$47.00 $47.00 $0.00 08/01/2008 15150 $47.00
Processed By: Main, Jodi L PERMIT
Printed By: PATRICIA PRINCE Page 1 of I
BUILDING DIVISION
SPO ll
Valley
11703 E. Sprague Avenue, Suite B-3
�
Spokane Valley. WA 99206
Site Information
Project Information
Site Address: 10116 F. 8TH AVE
Project Number: 08002977 Inv: I Issue Date: 08/01/2008
Permit Use: I AIR I IANDLFR
Parcel Number: 45204.0544
Subdivision:
Applicant: R & R HEATING & A/C
Block: Lot:
4019 E CENTRAL
SPOKANE, WA 99217 Phone: (509) 484-1405
Zoning: R-3 SF Res District
Contact: R&R IIEATING&A/C
Owner: FRANKLIN, JON & LINDA
4019 E CENTRAL.
Address: 10116 ESTH AVE
SPOKANE, WA 99217 Pbone: (509)484-1405
SPOKANE VALLEY, WA 99206
Setbacks - Front: Left: Right: Rear:
Building Inspector: SOUTH
Water net: SPO CO WATER DIST43B
Group Name:
Project Name:
Permits
Mechanical Permit Contraetor: R&RHEATING&AIRCONDINC License #.- RRHEAA'106BW_
AIR HANDLER-10,000CFM 1 $1200 PROCESSING FEE $3500
Total Permit Fee: $4700
FOR MECHANICAL INSPECTIONS CALL (509) 688-0054.
Payment Summary
Total Fees AmountPaid AmountOwin¢ Tram Date Recce Payment Amt
$47.00 $47.00 $0.00 08/01/2008 15150 $47.00
Processed By: Main, Jodi L PERMIT
Printed By: PATRICIA PRINCE Page 1 of I
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by
definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the
applicant/permidee that the use described on the front of this permit complies with applicable codes and that required
inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the
construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE
REQUIRED by City Code
FOOTING -when forms and reinforcement are In place and prior to placement of concrete -all structures, Including manufactured homes.
NOTE: This inspection Includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane
Valley Ordinance- Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable
Setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines- Please verity their location prior to locating your structure. Failure to
properly locate the structure may require Its relocation at the owner 's/permldee's expense -
FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete.
PLUMBING - after rough in before covering, and final.
MECHANICAL - roughinof piping, before covering, metal chimneys before concealment, and final.
FRAMING - after all framing, bracing and blocking is In place, rough electrical, plumbing and mechanical systems are complete, and prior to
concealing.
FINAL - when complete and prior to occupancy and/or use. All permits require final inspection.
NOTE: In addition to inspection of the structure, this Inspection Includes review of site improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this permit Items such as the installation of fire hydrants, fire department access,
on-site drainage ('208swelesh road improvement, parking and landscaping are common requirements of a permit/site plan which must be
completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES - Final Inspection required when complete, stairs, handrails, skming, etc Installed, and prior to occupancy
completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover.
RIGHT-OF-WAY/APPROACH - prior to placement of S.Por te/asphalt or, if gravel approach, after completion.
In addition to the above. any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etcmust
be inspected prior to cover. Check with the Building department for'speclal Inspections' In conjunction with commercial projects.
FOR INSPECTIONS
Please give one working day/24 hour notice. Different pads of your project may require permits and inspections from more than one agency.
Building, plumbing (includes interior reversals for sewer) and
mechanical, City of Spokane Valley Building Division 688-0054
Pemvls and atlacona for Ndo.wl mnrg, slam Oepanmenl al Labr
And lnduzlnez 33o -2e03
hernrds
s
and mpNns
edly d n aria dept, zyzlerr¢ane , SpokRegm I
Heard nor 32415M
Road cuts for utilities or driveways, City of Spokane Valley
Public Works 688-0195 or State Dept of Transportation
324-6000
Pern'6 aria m..din i ns ry sewer Cormeclipn, spokane Dounly unflrez DMeion
17r sell
Fre zpnnker and alarm didleard and private a riI mad absClidne, spoRane Valley
Fire Dara r.menl aa3�4123
Slade law Row 19.132 reomres Ina, prior Io any eaavalmn Ind nxi-I BEFORE YOU DIG caner muss no notildcall delle you dig al leas, Y—'aa days m ansms. v..rr
PERMIT EXPIRATION AND REFUNDS
All permits shall expire by limitation and be declared void If a) work is not started within 180 days of obtaining a permit or b) work is
abandoned for 180 days or more after beginning work, or c) after two years from the date of permit Issuance, regardless of whether the work is
finished. If a permit is expired for time, a new permit may be obtained for halt the permit fee based on the value of the remainder of the work to
finish the original permit.
All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee
payment 100% refunds will be granted for any fee erroneously sold or collected. Refunds of not more than 80% of a permit fee may be
authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be amhorzed
when an application is withdrawn or cancelled prior to the plan review being completed.
Owner / Agent
Date
Staff Approval Date
City of Spokane Valley
Building Dept
Receipt
ReceiptNumber: 2E+04 Customer Number
Projects
Full
Proiect Nbr Inv Nbr FeeAmt Inv Amt Owing PAID Pont
08002977 1 $47.00 $47.00 $47.00 $47.00 L
Total. $47.00 $47.00 $47.00 $47.00
Miscellaneous Items
Total PAID:
$47.00
Tender
Tyne
Check Acct Balance CCNbr Exp Date
TENDERED
VISA
xxxxxxxxxxxx8730 06/2010
47.00
Payer:
Total TENDERED:
47.00
Over I (Short)
$0.00
Change
$0.00
Notes:
Tran Date/Time:
08/01/2008 10:29:12 AM
By:
PLPRINCE
Logon User:
BldgCounter
Station:
CX_WI_F47lNOp9ydg5LG
Override By:
Printed: 08/01/2008 10:29:14 AM
Page I of