Loading...
2002, 01-10 Permit: 02000159 MHSPOKANE COUNTY DIVISION OF BUILDING AND CODE ENFORCEMENT 1026 WEST BROADWAY AvENuE • SPOKANE, WA 99260-0050 Site Information Project Information Site Address: 10118 E 8TH AVE Project Number: 02000159 Inv: 1 Issue Date: 1/10/02 Total Fees SPOKANE, WA 00000 AmountOwine Permit Use: PLACEMENT OF DOUHLEWIDE MANUFACTURED Parcel Number: 45204 0555 $152.W HOME Subdivision: UNIVERSITY PLACE 186 Applicant: ALLIED CONTRACTORS Black:5 Lot: 2 4620 N STARR RD OTIS ORCHARDS, WA. 99027 Phone: (509) 928-3003 yenning: UR -3 Urban Rcsidcnlial 35 Contact: ALLIED CONTRACTORS Owner: LEE, LINDA 4620 N STARR RD Address: 721 W NORA AVE OTIS ORCHARDS, WA. 99027 Phone: (509) 928-3003 SPOKANE, WA 99205-4640 Se[badcs- Fronl: 39 Left:9 Right:5 Rear: 71 Building Inspector: DAN HOWARD Water Dist: Group Name: Project Name: Permits Approach Contractor: UNKNOWN Lireme N: UNKNOWN APPROACH PERMIT 1 $10.00 APPROACH INSPECTION 1 $2000 'Pool Permit Fee: $3200 FOR APPROACH INSPECTIONS CALL (509) 477-3600 ENGINEERING Manufactured Howe Contracor: ALLIED CONTRACTORS OF SPOKANE Lierneek: ALLIECS162DI INSPECTION FEE 2 $10000 COUNTY SURCHARGE $2200 Total Permit Fee: 5142.00 Processed By: DAWN DOMPIER PERMIT Printed By: WENDEL, GLORIA Page 1 of 1 Payment Summary Total Fees AmountPaid AmountOwine Tron Date Receipt Payment And $152.W $152 W $0.00 1/10/02 186 $152,00 Processed By: DAWN DOMPIER PERMIT Printed By: WENDEL, GLORIA Page 1 of 1 NOTICE It is the responsibility of the appllcanVperroutoe, not Spokane Count, to see to it that the use described on the front of this permit complies with applicable codes and requirements and that required Inspections are requested. Failure to request required Inspections and obtain the necessary approvals prior to progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicantppormittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by County Code: 1- FOOTING when forms and reinforcement are in place and prior to placement of concrete—all structures, including manufactured homes. NOTE: This inspection includes review of the structure's setbacks from property lines- Minimum setbacks are established by County zoning regulations. Typically, side and rear yard setbacks are measured from properly lines, while setbacks for yards abutting streets are measured from the property line or the center line of the roadway right-ol-way, whichever provides the greater setback from the center line of the roadway rightol- way. Curb lines and fence Imes are not necessarily indicative of property Imes. In some residential areas, the County can own as much as 20 factor right of -way between your property and the actual improved sireet/com The responsibility to comply with applicable setback provisions lies solely with the permittee—neither Spokane County nor Its authorized representatives assume any responsibility for the verification or location of you property lines- Please verify their location prior to locating your structure- Failure to properly locale the structure may require Its relocation at the owner's/permittee s expense. 2. FOUNDATION -when forms and reinforcement are in place and prior to placement of concrete - 3. FRAMING - alter all framing, bracing and blacking Is In place, and prior to concealing. 4. INSULATION - prior to the installation of drywall. 6. PLUMBING - after rough -in, before covering, and fa al. 6. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final. 7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. All permits require final Inspection. NOTE: In addition to inspection who structure, this inspection includes review of site Improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the Installation of fire hydrants, fire department access, on -alta drainage ("208 smales"), road Improvements, parking, and landscaping are common requirements of a permeate plan which most be draw pleted prior to final approval me building or issuance of a Certificate of Occupancy. 8. MANUFACTURED HOMES- Final inspection required when complete, stairs, handrails, skirling, etcinstalled and prior to occupancy, completed inspection record card must be available on site. 9. SEWERS - poor to cover 10. RIG HT -O F-WAV/APPROACH - prior to placement of concrete, or, if gravel approach, alter completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the department for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS: TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE . PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS FROM MORE THAN ONE AGENCY. • Building, plumbing, mechanical and lire Inspections, Division • Road cuts for utilities or driveways, Division of Engineering & of Building and Code Enforcement Roads - 48-HOUR NOTICE REQUIRED 477-3675 477-3600 or State Department of Transportation • Construction in a flood plain, Division of Engineering 8 Roads 456-3000 477-3600 • Sewer connection, Division of Utilities • Electrical wiring, State Department of Labor and Industries 477-3604 324-2640 or City Public Warks Department • On-site waste disposal system, Spokane Regional Health District6256300 324-1560 PERMIT EXPIRATION AND REFUNDS Unless otherwise noted, this permit will be considered null and void by limitation if the work authorized by the permit is not commenced or is stopped for a period of 180 days, unless a written request for an extension of the permit Is received and approved by the Building Official prior to expiration- At a minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within one year of the date of expiration for one-half the original fee, subject to certain limitations—please call us If you have any questions. All refund requests must be made In writing by the applicant/permittee (shown on the reverse) no later than 180 days after the date of fee payment. Refunds of not more than 80% of the permit fee paid may be authorized when no work has been done under the permit No refunds may be authorized more than 180 days after fee payment. MISTAKE? If you think we've made an error In processing this permit or In conducting inspections pertaining to it, or find erroneous Information In the permit, please bring it to our attention immediately by filing a written request forcorrection within 10 working days of discovery. All such requests should be directed to the Division of Building and Code Enforcement at the below address. Spokane County Division of Building & Code Enforcement 1026 West Broadway Avenue Spokane, WA 99260 Phone: (509) 477-3675 Fax: (509) 477-4703 TDD.: (509) 477-7133