Loading...
2002, 02-20 Permit: 02000977 SewerSPOKANE COUNTi, DIVISION OF BUILDING f_ AND CODE ENFORCEMENT IIII 1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050 J $tt%CnnIECaINn' I Site Information Project Information Sitc Addvcss: 10118 E STU AVE PermitUse: SEWER CONNECTION -U-HIGH SPOKANE, WA 00000 Parcel Number: 45204.0555 Subdivision: UNIVERSITYPLACE Block 5 Lot: 2 Zoning: UR -3 Urban Residential 3.5 Owner: LEE, LINDA Address: 721 W NORA AVE Setbacks -Front: Left: Right: SPOKANE, WA 99205-4640 Building Inspector: DAN HOWARD Water Dist: Project Number: 02000977 Inv: 1 BsueDats: 2/20/02 PermitUse: SEWER CONNECTION -U-HIGH Payment Summary Applicant: ZUBERCONSTRUCTION Total Fees 26327 E MISSION Amount0wine LIBERTY LAKE, WA 99019 Phone: (509) 926-3777 Contact:. ZUBER CONSTRUCHON $110.00 26327 E MISSION 2/20/02 LIBERTY LAKE, WA 99019 Phone (509) 926-3777 Setbacks -Front: Left: Right: Rear: Group Name: Project Name Permits Right of Way Contractor. UNKNOWN Literate: UNKNOWN CONST IN ROW -SEWER 1 $10.00 Total Permit Fee: $10.00 FOR RIG IIT OF WAY INSPEC'DONS CALL (509) 477-3600 ENGINEERING Sewer Connection Permit Contractor: ZIIBER CONSTRUCTION Llcrnee: ZUBERC`133KN SEWER CONNECTION 1 $85.00 PROCESSING FEE $15.00 Total Permit Fee: $100.00 FOR SEWER INSPECTIONS CALL (509) 477-3604 UTILITIES 8:30-5:00 PM MONDAY THRU FRIDAY Call for inspection prior to cover. ONE WORKING DAY NOTICE REQUIRED. Contractor or applicant is to field locate and confirm the elevation and position of sewer stub prior to any other assu vallon. Sewer stubs are to be checked prior to connection to ensure that they have acceptable grade and are clear and um:betmcted to the main sewer Sewer lines should be constructed W allow for gravity Row from the lowest level of the structure. This permit must be presented to thejob site inspector for verification, To locale buried cables, gas piping, wattr lines, etc_ CALL BEFORE YOU DIG, (509)156-8000. STATE LAW RCW 19.122 REQUIRES THAT PRIOR TO ANY EXCAVATION THE "CALL BEFORE YOU DIG" CENTER BE NOTIFIED. CALL BEFORE YOU DIG AT LEAST 2 WORKING DAYS IN ADVANCE, (509)156-8000. Processed By: DAWN DOMPIER REV SITE Printed By: WENDEL, GLORIA Page 1 of 1 Payment Summary Total Fees AmountPaid Amount0wine Tran Date Rec? eiotN Payment Amt $1 Who $110.00 $000 2/20/02 996 $1111.00 Processed By: DAWN DOMPIER REV SITE Printed By: WENDEL, GLORIA Page 1 of 1 NOTICE It Is the responsibility of the appllcantlocreattee, not Spokane County, to see to M that the use described on the front of this permit complies with applicable codes and requirements and that required Inspections are requested. Failure to request required inspections and obtain the necessary approvals prior to progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permigee s or property owner s expense. At a minimum, the following inspections ARE REQUIRED by County Code'. 1- FOOTING when forms and reinforcement are n place and prior to placement of c re--all structures. Including manufactured homes- NOTE: This inspection includes re of the structure's setbacks from property lines, etMinimum setbacks are established by County zoning regulations Typically side and rear yard setbacks are measured from property lines, while setbacks for yards abutting streets are measured from the property line or the center line of the roadway right-of-way, whichever provides the greater setback from the center line of the roadway right of Curb lines and fence Imes are not necessarily indicative of property Imes. In some residential areas, the County can awn as much as 20 lector right-of way between your property and the actual Improved streot/curb. The responsibility to comply with applicable setback provisions lies solely with the permittee—neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your property Imes. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the er's/permidee's expense. 2. FOUNDATION when forms and reinforcement are in place and prior to placement of concrete. 3. FRAMING - after all framing, bracing and blocking is In place, and prior to concealing. 4. INSULATION - prior to the Installation of drywall. 6. PLUMBING -after rough in, before covering, and final. 6 MECHANICAL - rough in of piping, before covering, metal chimneys before concealment, and final. 7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. All permits recalls final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site Improvements (typically depicted on the approved site plan) required by ordinance oras a condition of approval of this permit. Items such as the Installation of fire hydrants, lire department access, on-site drainage ("208 senders"), road improvements, parking, and landscaping are common requirements of a permiVsite plan which must be com- pleted prior to final approval of a building or issuance of a Certificate of Occupancy. 8, MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etc Installed, and prior to occupancy; completed inspection record card must be available on site. 9. SEWERS - prior to cover 10- RIGHT-OF-WAY/APPROACH - prior to placement of concrete, or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be duncealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the department for 'special inspections' in conjunction with commercial projects. FOR INSPECTIONS: TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE . PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS FROM MORE THAN ONE AGENCY. • Building, plumbing, mechanical and fire inspections, Division Road cuts for utilities or driveways, Division of Engineering & of Building and Cade Enforcement Roads - 48-HOUR NOTICE REQUIRED 477-3675 477-3600 or State Department of Transportation • Construction in a flood plain, Division of Engineering & Roads 456-3000 477-3600 • Sewer connection, Division of Utilities • Electrical wiring, State Department of Labor and Industries 477-3604 324-2640 or City Public Works Department 6256300 • On-site waste disposal system, Spokane Regional Health District 324-1560 PERMIT EXPIRATION AND REFUNDS Unless otherwise noted, this permitwill unconsidered null and void by limitation if the work authorized by the permit is not commenced oris stopped for a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration. At a minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. A permit maybe renewed within ane year of the date of expiration forme -half the original fee, subject to certain limitations—please call us it you have any questions. All refund requests must be made in writing by the applicant/permittee (shown on the reverse) no later than 180 days attar the date of fae payment. Refunds of not more than 80%of the permit fee paid may be authorized when no work has been done under the permit. No refunds may be authorized more than 180 days after fee payment. MISTAKE? If you think we've made an error in processing this permit or in conducting Inspections pertaining to It, or find erroneous information in thispermit, please bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to the Division of Building and Cade Enforcement ed the below address. .Spokane County Division of Building & Code Enforcement 1026 West Broadway Avenue Spokane, TVA 99260 Phone: (509) 477-3675 Fez: (509) 477-4703 PDD: (509) 477-7133 SPOKANE CovwT DIVISION OF BUILDING AND CODE ENFORCEMENT 1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050 Project Information Project Number: 02000977 Inv: I lssucDaM 2/20/02 Permit Use: SEWER CONNECTION - U-IEGH Applicant: Zto FR CONSTRUCTION 26327 E MISSION LIBERTY LAKE, WA 99019 Phone (509) 926-3777 Contact ZUBER CONSTRUCTION 26327 E MISSION LIBERTY LAKE, WA 99019 Phone: (509) 926-3777 Setbacks -Fmnl: Ill: Right Rear: Group Name: Project Name: Permits Richt of WnP Contractor: UNKNOWN Lieensep: UNKNOWN CONST IN ROW -SEWER 1 SI0.00 Total Permit Fee: S1000 FOR RIGHT OF WAY INSPECTIONS CALL (509) 477-3600 ENGINEERING SeWfr Connection Permit Contractor: ZUEERCONSTRUCTION Llcemen: ZUBERC"133KN SEWERCON L,crbiN 1 $85.00 PROCLSSINOPF.E $1500 Total recent Fee: $100.00 FOR SEWER INSPECTIONS CALL (509) 477-3604 UTILITIES 8:30-5.00 PM MONDAY'I I IRU FRIDAY Call for inspection prior to cover. ONE WORKING DAY NOTICE REQUIRED. Contractor or applicant is to field locate and confirm the elevation and position of sewer stub prior to any other excavation Sewer slobs are to be checked poor to connection to ensure that t11ey have acceptable grade and arc clear and unobstructed to the main sewer. Sewer lines should be constructed to allow for gravity flow from the lowest level of the Structure. This peril must be presented to the job site inspector for verification. 'Co locate buried cables, gas piping, water linea, etc. CALL BEFORE YOU DIG, (509)156-8000. STATE. LAW RC W 19.122 REQUIRES THAT PRIOR TO ANY EXCAVATION THE "CALL BEFORE YOU DIG" CENTER BE NOTIFIED. CALL BEFORE YOU DIG AT LEAST 2 WORKING DAYS IN ADVANCE, (509)456-8000_ Payment Summary Total Fees AmountPaid AmauntOwine Tran Date Receipt Pavment Amt Snore) SHOW $0.00 2/20/02 996 $110.00 L� Processed By: DAWN DOMPIER PERMIT Printed By: WENDEL, GLORIA Page 1 of 1 101 i 9 :,,Site Information Site Address:J4LLIB ESTHAVL SPOKANE, WA 99206 Parcel Number: 45204.0555 Subdivision: UNIVERSITY PLACE Block: Wt Zoning: UR -3 Urban Residential 3.5 Owner. LEE, LINDA Address: 10120 ESTH AVE SPOKANE, WA 99206 Building Inspector: DAN HOWARD Water Dist: Project Information Project Number: 02000977 Inv: I lssucDaM 2/20/02 Permit Use: SEWER CONNECTION - U-IEGH Applicant: Zto FR CONSTRUCTION 26327 E MISSION LIBERTY LAKE, WA 99019 Phone (509) 926-3777 Contact ZUBER CONSTRUCTION 26327 E MISSION LIBERTY LAKE, WA 99019 Phone: (509) 926-3777 Setbacks -Fmnl: Ill: Right Rear: Group Name: Project Name: Permits Richt of WnP Contractor: UNKNOWN Lieensep: UNKNOWN CONST IN ROW -SEWER 1 SI0.00 Total Permit Fee: S1000 FOR RIGHT OF WAY INSPECTIONS CALL (509) 477-3600 ENGINEERING SeWfr Connection Permit Contractor: ZUEERCONSTRUCTION Llcemen: ZUBERC"133KN SEWERCON L,crbiN 1 $85.00 PROCLSSINOPF.E $1500 Total recent Fee: $100.00 FOR SEWER INSPECTIONS CALL (509) 477-3604 UTILITIES 8:30-5.00 PM MONDAY'I I IRU FRIDAY Call for inspection prior to cover. ONE WORKING DAY NOTICE REQUIRED. Contractor or applicant is to field locate and confirm the elevation and position of sewer stub prior to any other excavation Sewer slobs are to be checked poor to connection to ensure that t11ey have acceptable grade and arc clear and unobstructed to the main sewer. Sewer lines should be constructed to allow for gravity flow from the lowest level of the Structure. This peril must be presented to the job site inspector for verification. 'Co locate buried cables, gas piping, water linea, etc. CALL BEFORE YOU DIG, (509)156-8000. STATE. LAW RC W 19.122 REQUIRES THAT PRIOR TO ANY EXCAVATION THE "CALL BEFORE YOU DIG" CENTER BE NOTIFIED. CALL BEFORE YOU DIG AT LEAST 2 WORKING DAYS IN ADVANCE, (509)456-8000_ Payment Summary Total Fees AmountPaid AmauntOwine Tran Date Receipt Pavment Amt Snore) SHOW $0.00 2/20/02 996 $110.00 L� Processed By: DAWN DOMPIER PERMIT Printed By: WENDEL, GLORIA Page 1 of 1 NOTICE It is the responsibility of the applicaul/perandee. not Spokane County, to sae to R that the use described on the front of this permit complies with applicable codes and requirements and that required inspections are requested- Failure to request required Inspections and obtain the necessary approvals prior to progressing beyond the point where Inspections are required may necessitate removal of certain parts of the construction at the applicant s/permitlee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by County Code: I FOOTING - when forms and reinforcement are n place and prior to placement of concrete—all structures Including manufactured homes. NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning regulations- Typically, side and rear yard setbacks are measured from property lines, while setbacks for yards abutting streets are measured from the property line or the center line of the roadway right-of-way, whichever provides the greater setback from the center line of the roadway right of way Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas. the County can own as much as 20 feet of right-of-way between your property and the actual improved streer/curb. The responsibility to comply with applicable setback provisions Iles solely with the pernmHow—neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prier to locating your structure. Failure to properly locate the structure may require Its relocation at the owner epermittee s expense. 2- FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. 3- FRAMING - after all framing, bracing and blocking Is In place, and prior to concealing. 4. INSULATION prior to the installation of drywall. 5. PLUMBING - atter rough in before covering, and final. 6. MECHANICAL - rough in of piping, before covering, metal chimneys before concealment, and final. 7. FINAL - when complete and prior to o cupancy and/or use. Please provide 24 hours notice. All permits require final inspection. NOTE: In addition to Inspection of the structure, this inspection includes review of site Improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the Installation of fire hydrants, fire department access, on-site drainage ("208 swales"), road Improvements, parking, and landscaping are common requirements of a permit/site plan which most be com- pleted prior to final approval of a building or Issuance of a Certificate of Occupancy. 8. MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etcinstalled, and prior to occupancy, completed inspection record card must be available on site. 9. SEWERS - prior to cover 10. RIGHT-OF-WAY/APPROACH - prior to placement of concrete, or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover- Check with the department for "special Inspections' In conjunction with commercial projects. FOR INSPECTIONS: TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE . PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS FROM MORE THAN ONE AGENCY. • Building, plumbing. mechanical and fire inspections, Division • Road cuts for utilities or driveways, Division of Engineering 8 of Building and Code Enforcement Roads - 48-HOUR NOTICE REQUIRED 477-3675 477-3600 or State Department of Transportation • Construction in a flood plain, Division of Engineering 8 Roads 456-3000 477 3606 • Sewer connection. Division of Utilities • Electrical wiring, State Department of Labor and Industries 477-3604 324-2646 or City Public Works Department 625-6300 • On-site waste disposal system, Spokane Regional Health District 324-1560 PERMIT EXPIRATION AND REFUNDS Unless otherwise noted, this permit will be considered null and void by limitation if the work authorized by the permit is not commenced oris stopped for a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration. At a minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within one year of the date of expiration for one-half the original tee, subject to certain limitations—please call us if you have any questions. All refund requests must be made in writing by the applicam permittee (shown on the reverse) no later than 18) days after the date of fee payment. Refunds of not more than 80% of the permit fee paid may be authorized when no work has been done under the permit. No refunds may be authorized more than 180 days after fee payment. MISTAKE? If you think we've made an error in processing this permit or in conducting inspections pertaining to It, or find erroneous information In the permit, please bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to the Division of Building and Code Enforcement at the below address. Spokane County Division of Building & Code Enforcement 1026 West Broadway Avenue Spokane, WA 99260 Phone: (509) 477-3675 Fac' (509) 477-4703 IDD: (509) 477-7133