2002, 02-20 Permit: 02000977 SewerSPOKANE COUNTi, DIVISION OF BUILDING
f_ AND CODE ENFORCEMENT
IIII 1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050 J
$tt%CnnIECaINn'
I Site Information Project Information
Sitc Addvcss:
10118 E STU AVE
PermitUse: SEWER CONNECTION -U-HIGH
SPOKANE, WA 00000
Parcel Number:
45204.0555
Subdivision:
UNIVERSITYPLACE
Block
5 Lot: 2
Zoning:
UR -3 Urban Residential 3.5
Owner:
LEE, LINDA
Address:
721 W NORA AVE
Setbacks -Front: Left: Right:
SPOKANE, WA 99205-4640
Building Inspector: DAN HOWARD
Water Dist:
Project Number: 02000977 Inv: 1
BsueDats: 2/20/02
PermitUse: SEWER CONNECTION -U-HIGH
Payment Summary
Applicant: ZUBERCONSTRUCTION
Total Fees
26327 E MISSION
Amount0wine
LIBERTY LAKE, WA 99019
Phone: (509) 926-3777
Contact:. ZUBER CONSTRUCHON
$110.00
26327 E MISSION
2/20/02
LIBERTY LAKE, WA 99019
Phone (509) 926-3777
Setbacks -Front: Left: Right:
Rear:
Group Name:
Project Name
Permits
Right of Way Contractor. UNKNOWN Literate: UNKNOWN
CONST IN ROW -SEWER 1 $10.00
Total Permit Fee: $10.00
FOR RIG IIT OF WAY INSPEC'DONS CALL
(509) 477-3600 ENGINEERING
Sewer Connection Permit Contractor: ZIIBER CONSTRUCTION Llcrnee: ZUBERC`133KN
SEWER CONNECTION 1 $85.00 PROCESSING FEE $15.00
Total Permit Fee: $100.00
FOR SEWER INSPECTIONS CALL (509) 477-3604 UTILITIES 8:30-5:00 PM MONDAY THRU FRIDAY
Call for inspection prior to cover. ONE WORKING DAY NOTICE REQUIRED.
Contractor or applicant is to field locate and confirm the elevation and position of sewer stub prior to any other assu vallon.
Sewer stubs are to be checked prior to connection to ensure that they have acceptable grade and are clear and um:betmcted to the main
sewer Sewer lines should be constructed W allow for gravity Row from the lowest level of the structure.
This permit must be presented to thejob site inspector for verification, To locale buried cables, gas piping, wattr lines, etc_
CALL BEFORE YOU DIG, (509)156-8000.
STATE LAW RCW 19.122 REQUIRES THAT PRIOR TO ANY EXCAVATION THE "CALL BEFORE YOU DIG" CENTER BE
NOTIFIED. CALL BEFORE YOU DIG AT LEAST 2 WORKING DAYS IN ADVANCE, (509)156-8000.
Processed By: DAWN DOMPIER REV SITE
Printed By: WENDEL, GLORIA Page 1 of 1
Payment Summary
Total Fees
AmountPaid
Amount0wine
Tran Date
Rec? eiotN Payment Amt
$1 Who
$110.00
$000
2/20/02
996 $1111.00
Processed By: DAWN DOMPIER REV SITE
Printed By: WENDEL, GLORIA Page 1 of 1
NOTICE
It Is the responsibility of the appllcantlocreattee, not Spokane County, to see to M that the use described on the front of this permit complies with
applicable codes and requirements and that required Inspections are requested. Failure to request required inspections and obtain the necessary
approvals prior to progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the
applicant's/permigee s or property owner s expense. At a minimum, the following inspections ARE REQUIRED by County Code'.
1- FOOTING when forms and reinforcement are n place and prior to placement of c re--all structures. Including manufactured homes-
NOTE: This inspection includes re of the structure's setbacks from property lines, etMinimum setbacks are established by County zoning
regulations Typically side and rear yard setbacks are measured from property lines, while setbacks for yards abutting streets are measured from
the property line or the center line of the roadway right-of-way, whichever provides the greater setback from the center line of the roadway right of
Curb lines and fence Imes are not necessarily indicative of property Imes. In some residential areas, the County can awn as much as 20 lector
right-of way between your property and the actual Improved streot/curb. The responsibility to comply with applicable setback provisions lies solely
with the permittee—neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your
property Imes. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the
er's/permidee's expense.
2. FOUNDATION when forms and reinforcement are in place and prior to placement of concrete.
3. FRAMING - after all framing, bracing and blocking is In place, and prior to concealing.
4. INSULATION - prior to the Installation of drywall.
6. PLUMBING -after rough in, before covering, and final.
6 MECHANICAL - rough in of piping, before covering, metal chimneys before concealment, and final.
7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. All permits recalls final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site Improvements (typically depicted on the approved site plan)
required by ordinance oras a condition of approval of this permit. Items such as the Installation of fire hydrants, lire department access, on-site
drainage ("208 senders"), road improvements, parking, and landscaping are common requirements of a permiVsite plan which must be com-
pleted prior to final approval of a building or issuance of a Certificate of Occupancy.
8, MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etc Installed, and prior to occupancy; completed
inspection record card must be available on site.
9. SEWERS - prior to cover
10- RIGHT-OF-WAY/APPROACH - prior to placement of concrete, or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be duncealed by framing, drywall, concrete, etc., must be inspected
prior to cover. Check with the department for 'special inspections' in conjunction with commercial projects.
FOR INSPECTIONS:
TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE .
PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS
FROM MORE THAN ONE AGENCY.
• Building, plumbing, mechanical and fire inspections, Division Road cuts for utilities or driveways, Division of Engineering &
of Building and Cade Enforcement Roads - 48-HOUR NOTICE REQUIRED
477-3675 477-3600
or State Department of Transportation
• Construction in a flood plain, Division of Engineering & Roads 456-3000
477-3600
• Sewer connection, Division of Utilities
• Electrical wiring, State Department of Labor and Industries 477-3604
324-2640 or City Public Works Department
6256300
• On-site waste disposal system, Spokane Regional Health District
324-1560
PERMIT EXPIRATION AND REFUNDS
Unless otherwise noted, this permitwill unconsidered null and void by limitation if the work authorized by the permit is not commenced oris stopped for
a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration. At a
minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. A permit maybe renewed within ane year
of the date of expiration forme -half the original fee, subject to certain limitations—please call us it you have any questions.
All refund requests must be made in writing by the applicant/permittee (shown on the reverse) no later than 180 days attar the date of fae payment.
Refunds of not more than 80%of the permit fee paid may be authorized when no work has been done under the permit. No refunds may be authorized
more than 180 days after fee payment.
MISTAKE?
If you think we've made an error in processing this permit or in conducting Inspections pertaining to It, or find erroneous information in thispermit, please
bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to
the Division of Building and Cade Enforcement ed the below address.
.Spokane County Division of Building & Code Enforcement
1026 West Broadway Avenue
Spokane, TVA 99260
Phone: (509) 477-3675 Fez: (509) 477-4703 PDD: (509) 477-7133
SPOKANE CovwT DIVISION OF BUILDING
AND CODE ENFORCEMENT
1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050
Project Information
Project Number: 02000977 Inv: I lssucDaM 2/20/02
Permit Use: SEWER CONNECTION - U-IEGH
Applicant: Zto FR CONSTRUCTION
26327 E MISSION
LIBERTY LAKE, WA 99019 Phone (509) 926-3777
Contact ZUBER CONSTRUCTION
26327 E MISSION
LIBERTY LAKE, WA 99019 Phone: (509) 926-3777
Setbacks -Fmnl: Ill: Right Rear:
Group Name:
Project Name:
Permits
Richt of WnP Contractor: UNKNOWN Lieensep: UNKNOWN
CONST IN ROW -SEWER 1 SI0.00
Total Permit Fee: S1000
FOR RIGHT OF WAY INSPECTIONS CALL
(509) 477-3600 ENGINEERING
SeWfr Connection Permit Contractor: ZUEERCONSTRUCTION Llcemen: ZUBERC"133KN
SEWERCON L,crbiN 1 $85.00 PROCLSSINOPF.E $1500
Total recent Fee: $100.00
FOR SEWER INSPECTIONS CALL (509) 477-3604 UTILITIES 8:30-5.00 PM MONDAY'I I IRU FRIDAY
Call for inspection prior to cover. ONE WORKING DAY NOTICE REQUIRED.
Contractor or applicant is to field locate and confirm the elevation and position of sewer stub prior to any other excavation
Sewer slobs are to be checked poor to connection to ensure that t11ey have acceptable grade and arc clear and unobstructed to the main
sewer. Sewer lines should be constructed to allow for gravity flow from the lowest level of the Structure.
This peril must be presented to the job site inspector for verification. 'Co locate buried cables, gas piping, water linea, etc.
CALL BEFORE YOU DIG, (509)156-8000.
STATE. LAW RC W 19.122 REQUIRES THAT PRIOR TO ANY EXCAVATION THE "CALL BEFORE YOU DIG" CENTER BE
NOTIFIED. CALL BEFORE YOU DIG AT LEAST 2 WORKING DAYS IN ADVANCE, (509)456-8000_
Payment Summary
Total Fees AmountPaid AmauntOwine Tran Date Receipt Pavment Amt
Snore) SHOW $0.00 2/20/02 996 $110.00
L�
Processed By: DAWN DOMPIER PERMIT
Printed By: WENDEL, GLORIA Page 1 of 1
101 i 9 :,,Site
Information
Site Address:J4LLIB ESTHAVL
SPOKANE, WA 99206
Parcel Number:
45204.0555
Subdivision:
UNIVERSITY PLACE
Block:
Wt
Zoning:
UR -3 Urban Residential 3.5
Owner.
LEE, LINDA
Address:
10120 ESTH AVE
SPOKANE, WA 99206
Building Inspector:
DAN HOWARD
Water Dist:
Project Information
Project Number: 02000977 Inv: I lssucDaM 2/20/02
Permit Use: SEWER CONNECTION - U-IEGH
Applicant: Zto FR CONSTRUCTION
26327 E MISSION
LIBERTY LAKE, WA 99019 Phone (509) 926-3777
Contact ZUBER CONSTRUCTION
26327 E MISSION
LIBERTY LAKE, WA 99019 Phone: (509) 926-3777
Setbacks -Fmnl: Ill: Right Rear:
Group Name:
Project Name:
Permits
Richt of WnP Contractor: UNKNOWN Lieensep: UNKNOWN
CONST IN ROW -SEWER 1 SI0.00
Total Permit Fee: S1000
FOR RIGHT OF WAY INSPECTIONS CALL
(509) 477-3600 ENGINEERING
SeWfr Connection Permit Contractor: ZUEERCONSTRUCTION Llcemen: ZUBERC"133KN
SEWERCON L,crbiN 1 $85.00 PROCLSSINOPF.E $1500
Total recent Fee: $100.00
FOR SEWER INSPECTIONS CALL (509) 477-3604 UTILITIES 8:30-5.00 PM MONDAY'I I IRU FRIDAY
Call for inspection prior to cover. ONE WORKING DAY NOTICE REQUIRED.
Contractor or applicant is to field locate and confirm the elevation and position of sewer stub prior to any other excavation
Sewer slobs are to be checked poor to connection to ensure that t11ey have acceptable grade and arc clear and unobstructed to the main
sewer. Sewer lines should be constructed to allow for gravity flow from the lowest level of the Structure.
This peril must be presented to the job site inspector for verification. 'Co locate buried cables, gas piping, water linea, etc.
CALL BEFORE YOU DIG, (509)156-8000.
STATE. LAW RC W 19.122 REQUIRES THAT PRIOR TO ANY EXCAVATION THE "CALL BEFORE YOU DIG" CENTER BE
NOTIFIED. CALL BEFORE YOU DIG AT LEAST 2 WORKING DAYS IN ADVANCE, (509)456-8000_
Payment Summary
Total Fees AmountPaid AmauntOwine Tran Date Receipt Pavment Amt
Snore) SHOW $0.00 2/20/02 996 $110.00
L�
Processed By: DAWN DOMPIER PERMIT
Printed By: WENDEL, GLORIA Page 1 of 1
NOTICE
It is the responsibility of the applicaul/perandee. not Spokane County, to sae to R that the use described on the front of this permit complies with
applicable codes and requirements and that required inspections are requested- Failure to request required Inspections and obtain the necessary
approvals prior to progressing beyond the point where Inspections are required may necessitate removal of certain parts of the construction at the
applicant s/permitlee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by County Code:
I FOOTING - when forms and reinforcement are n place and prior to placement of concrete—all structures Including manufactured homes.
NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning
regulations- Typically, side and rear yard setbacks are measured from property lines, while setbacks for yards abutting streets are measured from
the property line or the center line of the roadway right-of-way, whichever provides the greater setback from the center line of the roadway right of
way Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas. the County can own as much as 20 feet of
right-of-way between your property and the actual improved streer/curb. The responsibility to comply with applicable setback provisions Iles solely
with the pernmHow—neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your
property lines. Please verify their location prier to locating your structure. Failure to properly locate the structure may require Its relocation at the
owner epermittee s expense.
2- FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete.
3- FRAMING - after all framing, bracing and blocking Is In place, and prior to concealing.
4. INSULATION prior to the installation of drywall.
5. PLUMBING - atter rough in before covering, and final.
6. MECHANICAL - rough in of piping, before covering, metal chimneys before concealment, and final.
7. FINAL - when complete and prior to o cupancy and/or use. Please provide 24 hours notice. All permits require final inspection.
NOTE: In addition to Inspection of the structure, this inspection includes review of site Improvements (typically depicted on the approved site plan)
required by ordinance or as a condition of approval of this permit. Items such as the Installation of fire hydrants, fire department access, on-site
drainage ("208 swales"), road Improvements, parking, and landscaping are common requirements of a permit/site plan which most be com-
pleted prior to final approval of a building or Issuance of a Certificate of Occupancy.
8. MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etcinstalled, and prior to occupancy, completed
inspection record card must be available on site.
9. SEWERS - prior to cover
10. RIGHT-OF-WAY/APPROACH - prior to placement of concrete, or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected
prior to cover- Check with the department for "special Inspections' In conjunction with commercial projects.
FOR INSPECTIONS:
TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE .
PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS
FROM MORE THAN ONE AGENCY.
• Building, plumbing. mechanical and fire inspections, Division • Road cuts for utilities or driveways, Division of Engineering 8
of Building and Code Enforcement Roads - 48-HOUR NOTICE REQUIRED
477-3675 477-3600
or State Department of Transportation
• Construction in a flood plain, Division of Engineering 8 Roads 456-3000
477 3606
• Sewer connection. Division of Utilities
• Electrical wiring, State Department of Labor and Industries
477-3604
324-2646
or City Public Works Department
625-6300
• On-site waste disposal system, Spokane Regional Health District
324-1560
PERMIT EXPIRATION AND REFUNDS
Unless otherwise noted, this permit will be considered null and void by limitation if the work authorized by the permit is not commenced oris stopped for
a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration. At a
minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within one year
of the date of expiration for one-half the original tee, subject to certain limitations—please call us if you have any questions.
All refund requests must be made in writing by the applicam permittee (shown on the reverse) no later than 18) days after the date of fee payment.
Refunds of not more than 80% of the permit fee paid may be authorized when no work has been done under the permit. No refunds may be authorized
more than 180 days after fee payment.
MISTAKE?
If you think we've made an error in processing this permit or in conducting inspections pertaining to It, or find erroneous information In the permit, please
bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to
the Division of Building and Code Enforcement at the below address.
Spokane County Division of Building & Code Enforcement
1026 West Broadway Avenue
Spokane, WA 99260
Phone: (509) 477-3675 Fac' (509) 477-4703 IDD: (509) 477-7133