Loading...
2009, 01-16 Permit App: 09000026 Pole Bldg Addition Project dumber: 09000026 Inv: 1 Application Date: 1/16/2009 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: X/1,..'::_ Permit Use: 24 X 16 ADD TO POLE BLDG Contact: TOWN&COUNTRY Address: 5918 E TRENT AVE C-S-Z: SPOKANE,WA 99212 Setbacks:Front Left: Right: Rear: Phone: (509)535-9016 Group Name: Site Information Project Name: Plat Key: 999999 Name: Range District: Sout Parcel Number: 45213.2005 Block: Lot: SiteAddress: 11404 E 9TH AVE Owner:Name: ZACHARY,ADAM S&LEHA T Address: 11404 E 9TH AVE Location::CSV SPOKANE VALLEY,WA 99206 Zoning: R-3 SF Res District Water District: 007 MODEL Hold: Area: 12,277 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 60 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: _• .. .. � ,. .. .. Review Building Plan Review Released By: Originally Released: 1/9/2009 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Originally Released: 1/15/2009 By: tschmidt Operator: JD Printed By: JD Print Date: 1/16/2009 Project Number: 09000026 Inv: 1 Application Date: 1/16/2009 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit - Contractor: TOWN&COUNTRY BLDG Firm: TOWN&COUNTRY BLDG CONT Address: 3908 W DAMN LN Phone: (509)448-8483 CHENEY,WA 99004 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation GARAGE U-1 VB 384 $7,296.00 384 $7,296.00 Totals: 384 $7,296.00 384 $7,296.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $153.25 WSBCC SURCHARGE 1 SELECT $4.50 SF PLNS RVW<7999 SQ FT 1 SELECT $61.30 Permit Total Fees: $219.05 5 FT MINIMUM REAR SETBACK AND 4-1/2 MINIMUM SIDE YARD SETBACK FOR POLE BUILDING(PLUS#08002477)-MH Payment Summary' .,,,,. . Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $219.05 $219.05 $61.30 $157.75 $219.05 $219.05 $61.30 $157.75 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 1/16/2009 Permit Center ��(9 - 11707 E Sprague Ave,Suite 106 PERMIT NUMBER: bO I.J�J ElLJE.EIG Spokane Valley, WA 99206 PERMIT FEE. ....Valley. (509)688-0036 FAX:(509)688-0037 www.spokanevallev.ore Community Development Residential Construction ❑New ConstructionAccessory Bldg Permit Application 2-Addition/Remodel n Deck ❑ Other: SITE ADDRESS: lI 11494 if 914 Air *4'adi U Age ? /144 ??206 FIs 213 S� " ASSESSORS PARCEL NO: •2 0D LEGAL DESCRIPTION: Building Owner. Contractor. Name: 4OAM 29-cif/KY Es 4 Com,ITley au1th0gs .2-At Addresss: ii q o q 9-" t / ' Address: 5 /8 Edo-o- TR4dT/i(i,E�i/4'E City:S1 N c, V State: 11/4 Zip: 412(90. C p :' 44a— t/+l fr State:Lt, Zip:99 24 Phone: 3z 3 7/z Fax Phone: 5 *6 Fax.569 534/ 2830. Contractor-Lie NO'T vilc$Ziz3C ExpDate- / b 06 3/lob Contact Person City Business Lic.No: 601 051 4 9th Name: CT 8uletO E7T D J Phone: Ca9 535 70/6 EXT 211 — Describe the scope of work in detail: Cost of Project:- $ 18 9y- si parr 2 y ar/6 ., oil " Aak l rot) To Exrsrpsi 2y'I 2.Lk'/lo � G`E Proposed Use: ST RiC E, 649 *i **************The folio i _ MUST be complete: (write Mif:notap��bl:" *�*�***�*�***����:��t�:* HEIGHT Tp PFAK: DIMENSIONS:24 A 16 � i , #OF.STORIES: TOTAL HABITABLE SPACE: dy-6MAIN FLOOR TO SQ. 2""FLOOR SQ. FTG: -UUFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG ,,// .1 4, Al/e! AREA 4)14- FINISHED BAS ENT GARA Q ' or- DECK/COV. PATIO SQ. FTG: 30% SLOPES ON SQ. FTG: /✓4f 3A ooiTa) PROPERTY: NO #OF BED'•OMS: CONS N TYPE: HEAT SOUR : SEWER OR SEPTIC? 4/ 4- fa sr FRi¢nlE Al ' ctit/C , . . The permitee verifies,acknowledges and agrees by their signature that 1) If this permit is for construcfion of or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction_ 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) - City of Spok .,,, alley Permit is not a permit or approval'for any violation of federal,state or local laws, codes or ordinances. • ' :ns or add— formation may be required to be submitted, and subsequently approved before this_application can be process-. SIGNATURE=-1' DATE: / r-6( 7 Method of Payment: 0 Cash 0 Check 0 Mastercard 0 VISA Bankcard#: Expires: VIN#: Authorized Signature: REVISED 2/75/D7 -------~-----^- RECEIVED 01/15/2889 14:31 5096880037 SV PERMIT CENTERFR JAN-15-2009 15:26 FROM'TONN & COUNTRY 15095342830 TO:6880037 P.2'2 For City Use Only PLUS Project Number CITY OF Project Address poIine Valle ° 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter®spokanevattey.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revi ed target date. Your application review TARGET DATE is 1 13 \6' The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review > Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. > Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process isa quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone,fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist willprocess the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE-APPLICANT PINK-BUILDING FILE REV 9/07