Loading...
2008, 07-07 Permit App: 08002477 Pole Bldg Project Number: 08002477 Inv: 1 Application Date: 7/7/2008 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project In ormation: Permit Use: 24 X 24 POLE BLDG Contact: ZACHARY,ADAM S&LEHA T Address: 11404 E 9TH AVE C-S-Z: SPOKANE VALLEY,WA 99206 Setbacks:Front Left: Right: Rear: Phone: (509)924-0755 Group Name: Site Information: Project Name: zz Plat Key: 999999 Name: Range District: Sout Parcel Number: 45213.2005 Block: Lot: SiteAddress: 11404 E 9TH AVE Owner:Name: ZACHARY,ADAM S&LEHA T Address: 11404 E 9TH AVE Location::CSV SPOKANE VALLEY,WA 99206 Zoning: R-3 SF Res District Water District: 007 MODEL Hold: Area: 12,277 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 60 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: ,,,.. �9., ,, Review Building Plan Review Released By: Originally Released: 6/30/2008 By: tmelbourn Landuse/Zoning/HE Conditions Released By: SEE CONDITION Originally Released: 7/7/2008 By: mharnois Operator: JD Printed By: JD Print Date: 7/7/2008 Prdject Number: 08002477 Inv: 1 Application Date: 7/7/2008 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Contractor: OWNER Finn: OWNER Phone: (000)000-0000 This Application: Total Project: Description Grp Type Notes Su Ft Valuation Sq Ft Valuation POLE BDLG U-1 VB 576 $10,944.00 576 $10,944.00 Totals: 576 $10,944.00 576 $10,944.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $195.25 ACCESSORY PLANS REVIEW 1 SELECT $48.81 WSBC SURCHARGE 1 SELECT $4.50 Permit Total Fees: $248.56 Notes• ,6 ,r .. :, .. „. 5 FOOT MINIMUM REAR YARD SETBACK AND 4-1/2 FOOT MNIMUM SIDE YARD SETBACK FOR POLE BUILDING(ADE-08-08)-MH 5 FT MINIMUM REAR SETBACK AND 4-1/2 MINIMUM SIDE YARD SETBACK FOR POLE BUILDING(PLUS#08002477)-MH Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $248.56 $248.56 $0.00 $248.56 $248.56 $248.56 $0.00 $248.56 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 7/7/2008 Permit Center Spcm or'Tn 11703 E Sprague Ave, Suite B-3 PERMIT NUMBER: "1—\ okane Spokane Valley,WA 99206 PERMIT FEE: jValley (509)688-0036 FAX: (509)688-0037 www.spokanevalley.org Community Development Residential Construction \ New Construction Accessory Bldg Permit Application n Addition/Remodel Deck Other: SITE ADDRESS: t t 4U`1 E . 06 40.• spoVrma VeAa� ,WA•. 01017_0(0 ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: Contractor: '. ' Name: Name: A 9 co... 1 , !ZaN 'ti 1` sj Address`- /� Address: \4u4 ....(313k-` ,rt. \' p City: ()u v X \ J State: WA Zip:on-Loc. City: State: Zip: Phone: Fax: Phone: Fax: 5001-3Z3 -1123 Contractor Lic No: Exp Date: Contact Person. City Business Lic.No: Name: Mow\iG.(if\c 1 Phone: SoA-322,-1i23 ` f 270 -"7I 23 Despribe the scopef work in taa,il: Cost of Project: $ (L,x)N 04 - 2A).\5 swycl s v..\N I\c�i n 3043 .0 0 Proposed Use: ( svc **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: / DIMENSIONS: #OF STORIES: TOTAL HA ITABLE SPACE: I g t di Si. S'44 MAIN FLOOR TO SQ. 2Nu FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE � FTG: AREA: • ) v S-s . NI A INI IA N IA FINISHED BASEMENT GARAGE Q. FTG. f DECK/COV. PATIO SQ. FTG: 30% SLOPES ON SQ. FTG: 14 I A 1 J / N '"s*- "TY: NIA #OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER f)R SEPTIC? NIA Pokt.tA,l9l1rS d1P The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the dwelling is/will be served by potable water: 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal,state or local laws, codes or ordinances.6) P-- or additional information may be required to be submitted, and subsequently approved before this application can be pro ssed SIGNATURE: DATE: 4,I7-.)Iv1 Method of Payment: 2 ❑ Cash Check ❑ Mastercard ICI VISA JUN 7 2006 Bankcard#: Expires: VIN#: Authorized Signature: ``3l':-- REVISED 2/15/07 SCITYOF11703 E Sprague Ave Suite B-3♦ Spokane Valley WA 99206 ♦509.688.0036 ♦ Fax: 509.688.0037 •4,,O Valley © Completed Building and Mechanical Application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor information, signature and date. ❑X Three (3) sets of plans including Site Plan, elevations, floor plans, foundation plans with details, roof plan, framing plans and details. MX Show the height of any proposed buildings or accessory structures. Mx Floor plan for each floor: Dimension to scale(minimum 1/8") and label each room (including sq footage of house and garage on plans) show each level of existing house and square footage of any additions. ❑X Egress windows: Provide at least one window or exterior door approved for emergency escape or rescue from basement and in every room for sleeping. © Floor framing details: Joist type, size, spacing and installation details. ❑x Roof framing plan and details Lx Furnace and hot water heater location MX All header locations: type, size and connections MX Foundation plan ❑X Insulation information ❑X Decks and Stairway details All braced wall panel types: show locations and details of installation, including engineered design Smoke detector locations 22" x 30" attic access location 18" x 24" crawl space access One-hour separation detail: between house and garage NemprojectZ' Project Previous pre-app meeting ❑ Spokane Transmittal Plan revisions El City of Spokane Valley Transmittal Date: 4000 Community Development Monday,June 30,2008 Department 11703 E.Sprague Ave,Suite B3 Spokane Valley,WA 99206 Phone: 509.688.0036 Site Address: 11404 E 9TH AVE Project Number: 08002477 Parcel Number: 45213.2005 Zoning: R-3 Water District: MODEL Fire District: FD 01 Applicant: ZACHARY, ADAM S & LEHA T Owner: ZACHARY, ADAM S & LEHA T 11404 E 9TH AVE 11404 E 9TH AVE SPOKANE VALLEY, WA 99206 SPOKANE VALLEY, WA 99206 (509) 924-0755 e-mail: e-mail: Contact: ZACHARY, ADAM S & LEHA T Occupant: 11404 E 9TH AVE e-mail: SPOKANE VALLEY, WA 99206 (509) 924-0755 e-mail: Contractor: OWNER Arch/Engineer: I ) ID) JUN 3 0 .---_J () - 0 I ED) �_� e-mail: iFA I_U) Ji lL I'd IJ IN] j��ti Project 24 X 24 POLE BLDG Description: Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATION , SITE PLAN 1 PLANS Please send all plan review and project comments via e-mail to the highlighted individuals. _________,....\ • ____ , [ , ., 5 (Aluitui 1 , , „„i, � - 5wtl\e)Se fir SItic IP0\tACSI;A5s , 1 1 r i -----_____ - r1.- - .... - _ _„. _ - -' / / , i ' 10CLAI aN 4cotte.."tIrosNete--r-A-- . 44iiiiiiii IV.,,i-,1 5‘at arwc \\ ..0 TV1 4.Vsi OVA PLANNING DEPT. APPROVED '),LO-,• 4r 17 ill , ' BY: `--,/ j j ,,; :, - sel SCITYok pane Valley p11707 E.Sprague ue Ave. • Suite 106• Spokane Valley,WA 99206 (509)921-1000 • Fax(509)921-1008 • cityhall@spokanevalley.org July 3,2008 Adam Zachary 11404 E. 9th Ave Spokane Valley, WA 99206 RE: ADE 08-08 Dear Mr. Zachary: I have reviewed your request for an administrative exception to build a pole building within three and one half(3.5) feet of the side and rear property line in order to avoid potential drainage or flooding issues. Section 19.40.010 (c) of the Spokane Valley Municipal Code (SVMC) authorizes the ability to grant and administrative exception for up to ten percent of a required yard if it meets certain criteria. Your exception can only be granted for .five foot on the side yard requiring the setback to be four and one half(4.5) feet from the east property line. The setback from the rear yard must be a minimum of five feet because there is a five foot utility easement delineated on your lot on the Dobravec 3rd Addition. The .five foot exception from the side yard setback is based on the following per Section 19.140.020 SVMC: A. The administrative exception does not detract from the character and nature of the vicinity in which it is proposed. B. The administrative exception does not detract from the character of the neighborhood and does not damage natural features, historic sites, open space or other resources. C. The administrative exception does not interfere with or negatively impact the operations of existing land uses and all legally permitted uses within the zoning district it occupies. D. Granting the administrative exception does not constitute a threat to the public health, safety and welfare within the City. Adam Zachary RE: ADE 08-08 July 3, 2008 You may want to consider consulting with a civil engineer to find a solution for your drainage problem which could make an administrative exception unnecessary. Sincerely, -e6att. Kathy McClung Community Development Director City of Spokane Valley CC: file ..,. For City Use Only CITY OF '€ :, PLUS Project Number Spokane Project Address aO 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 Y 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is 03 The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review > Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone,fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE-APPLICANT PINK-BUILDING FILE REV 9/07