Loading...
2011, 03-25 Permit App: 11000690 Reroof Project Number: 11000690 Inv: 1 Application Date: 3/25/2011 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: NEW ROOF STRUCTURE FOR HOUSE&DECK Contact: CMS CONTRACTING LLC Address: 4209 S Sullivan C-S-Z: SPOKANE VALLEY WA 99037 Setbacks:Front Left: Right: Rear: Phone: (509)998-9903 Group Name: Site Information• aa, Project Name: Plat Key: 001418 Name: LAMOTTE SUB District: Sout Parcel Number: 45214.0412 Block: Lot: SiteAddress: 12206 E 9TH AVE Owner:Name: SCHWEDLAND,TIMOTHY L&M Address: 12206 E 9TH AVE Location::CSV SPOKANE,WA 99216 Zoning: R-3 SF Res District Water District: 011 MODERN Hold: ❑ Area: 15,140 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 50 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: e m Review Building Plan Review Released By: Originally Released: 3/25/2011 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Originally Released: 3/24/2011 By: kkendall Permits: Operator: JD Printed By: jmm Print Date: 3/25/2011 Project Number: 11000690 Inv: 1 Application Date: 3/25/2011 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Contractor: CMS CONTRACTING LLC Firm: CMS CONTRACTING LLC Address: 4209 S Sullivan Phone: (509)998-9903 SPOKANE VALLEY WA 99037 This Application: Total Project: Description Grn Tyne Notes Sq Ft Valuation Sq Ft Valuation 1&2 FAMILY R-3 VB PLAN 0 $15,000.00 0 $15,000.00 REVIEW Totals: 0 $15,000.00 0 $15,000.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $251.25 WSBCC SURCHARGE 1 SELECT $4.50 SF PLNS RVW<7999 SQ FT 1 SELECT $100.50 Permit Total Fees: $356.25 Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $356.25 $356.25 $100.50 $255.75 $356.25 $356.25 $100.50 $255.75 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 3/25/2011 • Community Development Department (Staff Use Only) Permit Center ss�� pp 11703 East Sprague Avenue,Suite B-3 PERMIT NUMBER: //'- (,990 OT OF11��anSpokane Valley, WA 99206 Tel: (509)688-0036 PERMIT FEE: Valley x Fax: (509)688 0037 perm itcenter@spokanevallev.orq 4000 RESIDENTIAL CONSTRUCTION PERMIT APPLICATION 0 NEW CONSTRUCTION D ADDITION/REMODEL 0 ACCESSORY BUILDING ❑ DECK 0 OTHER SITE ADDRESS: 1,2c2 0 6 E, 977! ASSESSORS PARCEL NO.: 45214.0412 LEGAL DESCRIPTION: Lot 2 Blk 2 Lamont Sub BUILDING OWNER NAME: efgliWORIVERting NAME:Tim Schwedland ADDRESS: PO Box 142023 Cm: Spokane STATE: WA ZIP: 99037 PHONE: 509-844g4659 1 9/- 193 6 2 FAX: 509- 'y/-Z1ecELL: 509-9 + 94/ - 6..s'5' CONTACT NAME: CMS Contracting 04 Mt 2 ons g4 L L PHONE: 509- - q q g- 9 9v3 FAX: 509-893-0389 CELL: 509-998-9903 CONTRACTOR NAME: CMS Contracting MAILING ADDRESS: 4209 S. Sullivan Rd CITY: VE1eA LI 41. E STATE: WA ZIP: 99037 PHONE: 509-893=-8389 992— ? (7 93 FAX: 509-893-0389 CELL: 509-998-9903 CONTRACTOR LICENSE No.: 602556606 EXPIRES: G---.2.8-4,2 CITY BUSINESS LICENSE NO.: 60255660 CMSCeCL9N3L4 DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: Replace damaged Roof trusses Replace damaged Roof trusses ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE Height to Peak: Dimensions: No.of Stories: 1 Total Habitable Space: Main Floor SQ FT:1000 N!aper Floor S fT: FUTnfinished Basement SQ Finished Basement SQ Garage SQ FT: Deck overed Patio SQ Impervious Surface 30%Slopes on FT: Iota Area: Property: No. of Bedrooms: Constru on Type: Heat Source: Sewer or Septic: TOTAL COST OF PROJECT: $ 15,000 Ov--- ___-_._._----- - -- � DISCLAIMER I �F' .� ? `e!k r-J The permitted verifies,acknowledges and agrees by their signature that: 1)if this permit is for cons uction or on a dw. th yvelf ill 1lq ,_ '{ be served by potable water. 2)Ownership of this City of Spokane Valley permit inure to the grope y own�r�}�f��3ryfiN dry�s�H� y owner or has permission to represent the property owner in this transaction. 4) All construction is t be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spo ane Valley Pc I,'. etltt ; e City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordina•" . 6r Illted itional information may be required to be .brpiEfed and subsequently approved efore thi application can sed. i------�J�.. / PP r,Oiec' i i 4/1 r.�c `;1/ r i � ,/ i abs.i9-L.---,`__„ _=---- Effective October 28, 2007 .---------- "` Page 1 of 2 P:\Community Development\02 Administration\03 Forms-Official Versions\Permit Center\Residential Construction Permit App 10.28.07.doc For City Use Only CITYSpokane Project Address 4000 alley 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 V 509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. 1 While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE—APPLICANT PINK—BUILDING FILE REV 9/07 _ _ _ ___..,. .._. .��.._ .___ . __._..__._..-..._...-.__._ __-.___._______._.,,,.._ 1 _ �,...-.r..-_,. G-.-....... i NE elae le tt 14APPRov0 --- Csee SPfcS) r WA po5r/BSM 4,x6 To4cara8 PoSr 1_ L$r ! . I4 veto r4PS + '�^ f gAsE . Cti,. Zt2xi coNc- PICA 40' La, 1D comay E1x\SsI h G 25 x yo" c�k�+li,€ / To L-uS$E5 (4)6¢� P TS ON 1'x t'xZ'cow PiE/CS j•( . -'' 4 ' S►MPSol= ..+EciO+zS _' ) _.\ 2s $ Sol.re 2x95 IN w�kld, it F6400. l r3 exisTIN6 6" 900R.E4 FouNtfrArAo,-) 1 " 4, 6..xt5rtt16 Wooi a6cK 0.0tPoi PRoPoSEQ RooF — ‹ 3• R �--- oV62 bEtK 6 OF�HuuSE TO WALL L �� ,( 6RIr2 AGE moor. Er( WALL of tlou$Ef In i 1 .<--- >EXISTIN fel vtw4Y EXISTING1{DMC_ cGn Say FT PQoPnSED NEvJ R�oF �1 5r�vcTvrck L See i ETA ---------- v r NE of IOC) 1 4 i / V T�1 0 11106E � 45-.2;4, 4!Z/ ME&! goof 5j*ucTral2E , \,.4, 2I \>t A SCALE ►k^ t' , ,„./ m R-3 Tri ,¢VE 4/��n I V 40 *Isw'a--- A'' ll' Al. 41. -47ec i,4,0A, j e �.7liFO z ° Er 1 . ZiP 70 �L N m (V .R. / / pi