2011, 03-25 Permit App: 11000690 Reroof Project Number: 11000690 Inv: 1 Application Date: 3/25/2011 Page 1 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: NEW ROOF STRUCTURE FOR HOUSE&DECK Contact: CMS CONTRACTING LLC
Address: 4209 S Sullivan
C-S-Z: SPOKANE VALLEY WA 99037
Setbacks:Front Left: Right: Rear: Phone: (509)998-9903
Group Name:
Site Information• aa, Project Name:
Plat Key: 001418 Name: LAMOTTE SUB District: Sout
Parcel Number: 45214.0412 Block: Lot:
SiteAddress: 12206 E 9TH AVE Owner:Name: SCHWEDLAND,TIMOTHY L&M
Address: 12206 E 9TH AVE
Location::CSV SPOKANE,WA 99216
Zoning: R-3 SF Res District
Water District: 011 MODERN Hold: ❑
Area: 15,140 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 50
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Review Information: e m
Review
Building Plan Review Released By:
Originally Released: 3/25/2011 By: tmelbourn
Landuse/Zoning/HE Conditions Released By:
Originally Released: 3/24/2011 By: kkendall
Permits:
Operator: JD Printed By: jmm Print Date: 3/25/2011
Project Number: 11000690 Inv: 1 Application Date: 3/25/2011 Page 2 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Building Permit
Contractor: CMS CONTRACTING LLC Firm: CMS CONTRACTING LLC
Address: 4209 S Sullivan Phone: (509)998-9903
SPOKANE VALLEY WA 99037
This Application: Total Project:
Description Grn Tyne Notes Sq Ft Valuation Sq Ft Valuation
1&2 FAMILY R-3 VB PLAN 0 $15,000.00 0 $15,000.00
REVIEW
Totals: 0 $15,000.00 0 $15,000.00
Item Description Units Unit Desc Fee Amount
RESIDENTIAL PERMIT FEE 1 SELECT $251.25
WSBCC SURCHARGE 1 SELECT $4.50
SF PLNS RVW<7999 SQ FT 1 SELECT $100.50
Permit Total Fees: $356.25
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $356.25 $356.25 $100.50 $255.75
$356.25 $356.25 $100.50 $255.75
Disclaimer:
Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information
contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm Print Date: 3/25/2011
•
Community Development Department (Staff Use Only)
Permit Center
ss��
pp 11703 East Sprague Avenue,Suite B-3 PERMIT NUMBER: //'- (,990
OT OF11��anSpokane Valley, WA 99206
Tel: (509)688-0036 PERMIT FEE:
Valley x Fax: (509)688 0037
perm itcenter@spokanevallev.orq
4000
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
0 NEW CONSTRUCTION D ADDITION/REMODEL 0 ACCESSORY BUILDING
❑ DECK 0 OTHER
SITE ADDRESS: 1,2c2 0 6 E, 977!
ASSESSORS PARCEL NO.: 45214.0412 LEGAL DESCRIPTION: Lot 2 Blk 2 Lamont Sub
BUILDING OWNER NAME: efgliWORIVERting
NAME:Tim Schwedland
ADDRESS: PO Box 142023
Cm: Spokane STATE: WA ZIP: 99037
PHONE:
509-844g4659 1 9/- 193 6 2 FAX: 509- 'y/-Z1ecELL: 509-9 + 94/ - 6..s'5'
CONTACT NAME: CMS Contracting 04 Mt 2 ons g4 L L
PHONE: 509- - q q g- 9 9v3 FAX: 509-893-0389 CELL: 509-998-9903
CONTRACTOR NAME: CMS Contracting
MAILING ADDRESS: 4209 S. Sullivan Rd
CITY:
VE1eA LI 41. E STATE: WA ZIP: 99037
PHONE: 509-893=-8389 992— ? (7 93 FAX: 509-893-0389 CELL: 509-998-9903
CONTRACTOR LICENSE No.: 602556606 EXPIRES: G---.2.8-4,2 CITY BUSINESS LICENSE NO.: 60255660
CMSCeCL9N3L4
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE:
Replace damaged Roof trusses
Replace damaged Roof trusses
****YOU MUST COMPLETE THE FOLLOWING****
MARK N/A IF NOT APPLICABLE
Height to Peak: Dimensions: No.of Stories: 1 Total Habitable
Space:
Main Floor SQ FT:1000 N!aper Floor S fT: FUTnfinished Basement SQ Finished Basement SQ
Garage SQ FT: Deck overed Patio SQ Impervious Surface 30%Slopes on
FT: Iota Area: Property:
No. of Bedrooms: Constru on Type: Heat Source: Sewer or Septic:
TOTAL COST OF PROJECT: $ 15,000 Ov--- ___-_._._----- - -- �
DISCLAIMER I �F' .� ? `e!k r-J
The permitted verifies,acknowledges and agrees by their signature that: 1)if this permit is for cons uction or on a dw. th yvelf ill
1lq ,_ '{
be served by potable water. 2)Ownership of this City of Spokane Valley permit inure to the grope y own�r�}�f��3ryfiN dry�s�H� y
owner or has permission to represent the property owner in this transaction. 4) All construction is t be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spo ane Valley Pc I,'. etltt ; e City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordina•" . 6r Illted itional
information may be required to be .brpiEfed and subsequently approved efore thi application can sed. i------�J�..
/ PP r,Oiec' i
i
4/1
r.�c `;1/ r i � ,/ i abs.i9-L.---,`__„ _=----
Effective October 28, 2007 .---------- "` Page 1 of 2
P:\Community Development\02 Administration\03 Forms-Official Versions\Permit Center\Residential Construction Permit
App 10.28.07.doc
For City Use Only
CITYSpokane Project Address
4000 alley 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
V 509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
1 While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure,you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE—APPLICANT PINK—BUILDING FILE REV 9/07
_ _ _ ___..,. .._. .��.._ .___ .
__._..__._..-..._...-.__._ __-.___._______._.,,,.._ 1 _ �,...-.r..-_,. G-.-.......
i NE elae le
tt
14APPRov0 --- Csee SPfcS) r
WA po5r/BSM
4,x6 To4cara8
PoSr
1_ L$r ! .
I4
veto r4PS +
'�^ f gAsE
. Cti,.
Zt2xi coNc- PICA
40'
La, 1D comay
E1x\SsI h G 25 x yo" c�k�+li,€
/ To L-uS$E5 (4)6¢� P TS ON 1'x t'xZ'cow PiE/CS
j•( . -'' 4 ' S►MPSol= ..+EciO+zS
_' ) _.\ 2s $ Sol.re 2x95 IN w�kld, it F6400. l
r3 exisTIN6 6" 900R.E4 FouNtfrArAo,-)
1
" 4,
6..xt5rtt16 Wooi a6cK
0.0tPoi PRoPoSEQ RooF — ‹ 3• R
�--- oV62 bEtK 6 OF�HuuSE TO
WALL L ��
,( 6RIr2 AGE moor.
Er( WALL of tlou$Ef
In i
1 .<--- >EXISTIN fel vtw4Y
EXISTING1{DMC_
cGn Say FT
PQoPnSED NEvJ R�oF
�1 5r�vcTvrck L See i
ETA ---------- v r NE of IOC) 1
4
i / V
T�1
0
11106E � 45-.2;4, 4!Z/
ME&! goof 5j*ucTral2E
, \,.4,
2I \>t A
SCALE ►k^ t'
, ,„./
m R-3 Tri ,¢VE 4/��n I
V
40 *Isw'a--- A'' ll' Al.
41.
-47ec i,4,0A,
j e �.7liFO
z °
Er 1
. ZiP
70 �L
N m (V
.R. / /
pi