2014, 08-29 Permit: SW-14001282 Sewer SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-14001282 Permit Issued Date: 08/29/2014
Expiration Date: 08/29/2015
Project Description: MAIN/MANHOLE
Project Name: OPPORTUNITY TERRACE
Primary Contact: VORTEX, INC Applicant: VORTEX, INC
Phone: (509)879-7362 Address: 6923 E 8TH
SPOKANE,WA 99212
Phone: (509)879-7362
Email:
SITE INFORMATION:
Site Address: 12712 E 9TH AVE Owner: WAGENBLAST, M R&A M/PARAS,G J
&PJ
Parcel Number: 45223.0329 Address: 603 HAVANA ST
SPOKANE,WA 99204
Phone:
Assessor's Description: WOODWARD PK ADD L5 B3 Email:
Inspection Area: :(509)-477-3675
Water District:Vera Irrigation District#15 Fire District: Spokane Valley Fire
Zoning: Land Area:23722 Square Feet
CONTRACTOR INFORMATION:
VORTEI*099PT, Exp.03/28/2015
VORTEX, INC
6923 E 8TH SPOKANE,WA 99212
(509)879-7362
DETAILS:
Class Type Quantity Unit Charge Value
SEWER MAIN/MANHOLE TAP/CUT-IN 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing-Utilities $26.64
Utilities Permit $125.00
Total Fee: $151.64
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE(1)YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
Date Printed:08/29/2014 06:36:51 Project Coordinator:Dawn Dompier
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-14001282 Permit Issued Date: 08/29/2014
Expiration Date: 08/29/2015
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.