Loading...
2008, 10-07 Permit App: 08002837 Pole BldgProject Number: 08002837 Inv: 1 Application Date: 10/72008 Page 1 oft THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: contact: TOWN & COUNTRY Penni[ Use: 26 X 48 POLE BLDG Address: 5918 E TRENT AVE C - S - Z: SPOKANE, WA 99212 Setbacks: Fran[ Left: Right: Rear: Phone: (509) 535-9016 Group Name: Project Name: Site Information: "``-°""" DistrictSou[ Plat Key: 001838 Name: OPPORTUNITY TR # 01-354 : Parcel Number: 45201.0944 Block: Lot: SiteAddress: 10501 E 8TH AVE Owner: Name: BOLLMAN, L P & D M Address: 10501 E STH AVE SPOKANE. WA 99206-3506 Location:: CSV Zoning: R-3 SF Res District Water District: Area: .42 Acres Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 1 Review Information: Review Building Plan Review Hold: ❑ Depth: 0 Right of Way (it): 0 Released By: — - -- -- — Originally Released: 10/6/2008 By: tmelbourn LaoduserLoning/HE Conditions Released BY_ - GARAGE AND BARN MUST BE TORN DOWN PRIOR TO THE FINAL OF THE PERMIT originally Released: 10/6/2005 By: mheraois Permits: operator: JD Printed By: JD Print Date: 10/72008 Project Number: 08002837 Inv: I Application Date: 10/72008 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Permit Total Fees: $476.06 Notes: GARAGE AND BARN MUST BE TORN DOWN PRIOR TO THE FINAL OF THE PERMIT -MH Payment Summary: _ Permit Tvce Fee Amount hlyniCe Amomt Amount Paid Amount Owing Building Permit $476.06 5476.06 $0.00 S476.06 5476.06 $476.06 $0.00 $476.06 Disclaimer: Submittal of this application certifies the owner (or peraon(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this anytype of norkany willbe of complied with. to issuance ofa permit shall not be construed to be a permit for, or an approval of, the provisions of the code or of any other state or local laws or ordinances. Signature Operator: JD Printed BY' JD Print Date: 10/7/2008 Building Permit Firm: TOWN & COUNTRY BLDG CONT Contractor. TOWN & COUNTRY BLDG (509) 448-8483 Address: 3908 W DAION LN Phone: CHENEY, WA 99004 This Application: Total Project: Description Gtr Tvoe Notes Ft .$9_ Valuation S Ft Valuation 1,248 $23,712.00 POLE BDLG U-1 VB 1,248 $23,712.00 Totals: 1,248 $23,712.00 1,248 $23,712.00 Item Dion Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE NTI 1 SELECT $377.25 ACCESSORY PLANS REVIEW 1 SELECT $94.31 WSBCSURCHARGE 1 SELECT 54,50 Permit Total Fees: $476.06 Notes: GARAGE AND BARN MUST BE TORN DOWN PRIOR TO THE FINAL OF THE PERMIT -MH Payment Summary: _ Permit Tvce Fee Amount hlyniCe Amomt Amount Paid Amount Owing Building Permit $476.06 5476.06 $0.00 S476.06 5476.06 $476.06 $0.00 $476.06 Disclaimer: Submittal of this application certifies the owner (or peraon(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this anytype of norkany willbe of complied with. to issuance ofa permit shall not be construed to be a permit for, or an approval of, the provisions of the code or of any other state or local laws or ordinances. Signature Operator: JD Printed BY' JD Print Date: 10/7/2008 Permit Center y� 010�11707 E Sprague Ave, S 20 106 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 •`'u J • www. okanev 2�QQ Commrmity Development ` tu' Residential Construction vtm-1I U" Permit Application PERMIT NUMBER b - PERMIT FEE: -New Construction Addition/Remodel Other: SITEADDRESS: I0S01rL 9D- Ayr- -�J h!/ 99)G ASSESSORSPARCELNO: N{30), pgy4 LEGALDESCRIPTION: Banding Owner - DIMENSIONS 8 xrd Name: Leo I'm TOTAL H (TABLE SPACE: Nn Aaaress: E, c f}vp City. ksLt State: A Tp: Phone: Q� q _ Fax: Contact Person Name: (744E uR ETr Phone: 509 535 016 EAT 2-9 Describe the scope of work in detail: Proposed Use: [?/Accessory Bldg ❑ Deck \ddress: 59/8 EAA" rR'WrAr/e✓aa Ii<Y.YQCAA/E ✓*iaY State: k/�. Zip: 'hone:6095�w 9W6 Fax. $ort 53// 2$30 ;ontracmr Lie No:�WAX$.ris;c6 Exp Date: O61.?ele11 ;ity Business Lio.No: - 601 057�P9S Cost of Project: $ 1'71011 (.., +—N[A_.r..nt annlirsblei•........++ .+rt.....t. .............. i ne re HEIGHT TO PEAK DIMENSIONS 8 xrd ..........,.._-- ---- -- --- # OF STORIES: OA/E TOTAL H (TABLE SPACE: Nn 1 MAIN FLOOR TO SO. 2 FLOOR SO. FTG: UNFIN BASEMENT SO. FTG: IMPERVIOUS SURFACE FTG: A/ A- N q N/A- AREA vl* F N SHEDFTG: BASEM lJT GARA%� SQ. FTb 1� DECK/CO N TIO SO. FTG: PROPERTY. ON �o # OF BEDROOM Cg,NSTRUCTION TYPE: HEAT SOURS : NN SEWERO� PTIC7 SSEEWW yy ro sT FR.}MR The perritee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling ishvill be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plan nal info "nmay be required to be submitted, and subsequently approved before this application can be pr0�� SIGNATURE: � DATE: Mthod of Payme rk 9k Cash Check ❑ Mastercard ❑ NSA eankcard M Expires: VINM Authorized Signature: rEV16EDWH For City Use Only PLUS Project Number Spokane Project Address I l I S ° Valley° 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 ,;O*509.688.0036 + Fax: 509.688.0037 * permitcenterCaspokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If to any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK -BUILDING FILE REV W07 Project Transmittal Ca'0" 0 Spokane Valley CommuniV=`elopmeut Department 11703 E'Sprague Ave, Suite B3 Spokane Valley, WA 99206 NewpuVect LJ Predove pre -app meeting ❑ Plan recisions El Transmittal Date: Monday, October 06, 2008 Zoning: R-3 Water District: Project 9A x aA POLE BLDG Please send all plan review and project comments via e-mail to the highlighted individuals. Project Number: 08002837 Site Address: 10501E 8TH AVE Parcel Number: 45201.0944 Zoning: R-3 Water District: Fire District: FD 01 Applicant: TOWN & COUNTRY Owner. BOLLMAN, L P & D M 10501 E 8TH AVE 5918 E TRENT AVE SPOKANE, WA 99206-3506 SPOKANE, WA 99212 (509) 535-9016 e-mail: e-mail: Occupant: Contact: TOWN &COUNTRY 5918 E TRENT AVE e-mail: SPOKANE, WA 99212 (509)535-9016 e-mail: - - Contractor. TOWN & COUNTRY BLDG CONTR Arch / Engineer: - 3908 W DAKIN LN-- CHENEY, WA 99004 - - (509)448-8483 e-mail: Project 9A x aA POLE BLDG Please send all plan review and project comments via e-mail to the highlighted individuals. Project Number: 08002837 Inv: 7 Application Date: 7/28/2008 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Proiect Information: Pemdt Use: 26 X 44 POLE BLDG Contact: TOWN & COUNTRY Address: 5918 E TRENT AVE C - S - Z: SPOKANE, WA 99212 Setbacks: Front Left: Right: Rear: Phone: (509) 535-9016 Group Name: Site Information: Project Name: Plat Key: 001838 Name: OPPORTUNITY TR # 01-354 District: Sout Parcel Number: 45201.0944 Block: Lot: SiteAddress: 10501 E 8TH AVE Owner: Name: BOLLMAN, L P & D M Location:: CSV Zoning: R-3 SF Res District Water District Area: .42 Acres Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 1 Review Information: Review Building P1a s Review Originally Released: Landme/Zoning/HE Conditions Address: 10501 E STH AVE SPOKANE, WA 99206-3506 Hold: ❑ Depth: 0 Right Of Way (ft): 0 Released By: t oj 7/222008 By: tmelbourn I Releesed By _ 1037 SF available proposeq 1144 SFS Originally Released: 7282008 By: M�B��. ASSIINNGE C Permits: o\y�LDCC`` &.... 6 % e/ (rTSzL !� 2QS h4S 792- /o/bw lgzq jo Opersmr. JD Printed By: jmm Print Date: 728/2008 Por"vl qr�)til,m4u Lco X11. w 1o5m e, s9 Aw c QQQOJ0O i ems°' p ipllel ��na N(-. 1� /� 5, i 84-" A"uc fy Permit aCenter ( / @2� ] 1707 E Sprague Ave, Slim 106 >� Flo PERMIT NU'S9BER 5061 a►e Spokane Valley, WA 99206 PERMIT FEE: ��Tr+ll.,s,• (509)688-0036 FAX:(509)688\0-0 ��''[cllliSS��'' µ,W,w, sookan valley ore Community Development Residential Construction ❑ New Construction ❑ Accessory Bldg Permit Application ❑ Addition/Remodel ❑ Deck ❑ Other: srrEADDREss: 1oSol E 9r-" Ave -4 . ✓MttE� tJs 99_ltl(. .Name: Leo & I IName:-roWV 411h - MAIN FLOOR TO SQ. ASSESSORS PARCEL NO: 461101. 0qq4 LEGAL DESCRIPTION: Beading Owner. DIMENSIONS: A OF RIES: TOTAL H BITABLE SPACE: Contractor. .Name: Leo & I IName:-roWV 411h - MAIN FLOOR TO SQ. # COUAITRy 6UJZPOgl .TALC, Address: E C Ave A _ N/*- (P Address: S9/B E4Sr 7WWr d5V4'E City: f V*Llf state: 1,A zip: 30% SLOPES ON City:—WfAX ✓Ault' state:.k/m 4: f12/2 Phone: Q,. _ Fps # OF BEDROOM : 1 Phone: 53f *6 Fax: 5C9 63el 2830 SEVVW OR SEPTIC? 64 PosT FR4ME 44- Contractor Lic No:-r.WA, &rrz;c6 Exp Dare: 06 3e o Contact Person City Business Lic. No: (po( 057 41? Nerve: G BUE.Tr Phone: Soq 535RAI 016 ExT 2.4 Describe the scope of work in detail: Cost of Project: $ a(' Y4W % 10�f*` i ara.a<P Proposed Use: &C"-, *************+The followine MUST be comotete: (write NlAifnot HEIGHT TO PEAK DIMENSIONS: A OF RIES: TOTAL H BITABLE SPACE: I " 44'x ro.s UNC 411h - MAIN FLOOR TO SQ. 2 FLOOR SQ. FTG: UNPiN-E&W.MENT SQ. FTG: IMPERVI US SURFACE FTG: #V A _ N/*- (P AREA N`¢ FINISHED BASEM T GARAGE SQ. FTG: DECKtC 10 SQ. FTG: 30% SLOPES ON FrG: N yLy O (- N R 1/0A PROPERTY: # OF BEDROOM : 1 CONSTRUCTION TYPE: HEAT SOURCE: SEVVW OR SEPTIC? 64 PosT FR4ME 44- SE1VO- The permites verifies, acknowledges and agrees by their signature that t) If this permit is for construction of or on a dwelling, the dwelling istwill be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) T'-- City o po n ey ern is n a perp or approve r arty vio on o to are ,state or local laws, codes or ordinances. 6) I s or addrdo information may be required to be submitted, and subsequently approved before this application can be as . - SIGNATUR� DATE: 7 Z7'o Method of Payment ❑ Cash ❑ Check Bankcard #: Authorized Signature: s SEDvImr 0 Mastercard 0 VISA Expires: VIN#: 11 --- A Rl s to6ot E, 8m A,,t N C�o oh a,,;w5,t -&« 6( c 4t, iT , �-ra� &o +b aMrrhs o. +Ue fWA Valley Site Address: 10501 E 8TH AVE Parcel Number., 45201.0944 Project Transmittal City of Spokane Valley Community Development Department 11703 E. Sprague Ave, Suite 133 Spokane Valley, WA 99206 Zoning: R-3 Water District: Fire District., FD 01 Applicant: TOWN & COUNTRY 5918 E TRENT AVE SPOKANE, WA 99212 (509)535-9016 e-mail., Newpmject E] F—iouep—ppmeedog it p/a mo.ona r'1 Transmittal Date: Tuesday Juv22.2a08 Project Number: 08002837 Owner. BOLLMAN, L P & D M 10501 E 8TH AVE SPOKANE. WA 99206-3506 e -mall: Contact., TOWN & COUNTRY Occupant: 5918 E TRENT AVE e-mail., SPOKANE, WA 99212 (509)535-9016 e-mail: Contractor., TOWN & COUNTRY BLDG CONTR Arch /Engineer: 3908 W DAKIN LN CHENEY, WA 99004 (509)448-8483 e-mail: Project 7R X 44 POI F RI nn ECEdWErD JUL 2 2 M Please send all plan review and project comments via e-mail to the highlighted individuals. For City Use Out CITY OP PLUS Project Number Project Address Spokane So Valley° 11703 E Sprague Ave Suite B-3 1 Spokane valley WA 99206 ,,;oO 509.688.0036 1 Fax: 509.688.0037 1 Irermitcenter@spakanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is —y/ll 7`q' The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertisefor dealing with reviewer comments would be the best choicefor the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK -BUILDING FILE nEVM7 i 'Al 5 �a�• Leo aA� tosa e, lt� Ave. J}L 5 r gI il"'Q M:enJJ 4I.-� 8' aW,,t,F, WAMBEKE ENGINEERING 2913 East 61" Court Daniel Wambeke, P. E. Spokane, WA 99223 Telephone: 509-443-6186 • Fax: 509-448-6582 - dwamheke Qmsn.com STRUCTURAL DESIGN DRAWINGS FOR 26'X 44'X 10'6" POST FRAME BUILDING FOR LEO BOLLMAN SPOKANE VALLEY, WASHINGTON JOB NO. 8776 PREPARED FOR TOWN & COUNTRY BUILDERS, INC. SPOKANE, WASHINGTON July 21, 2008 MEMENNe Designer of Small Structures. Post Frame Buildings, Foundations. Light Gauge Steel Framing and Grain Storage Systems 19x9 0#6 U i6 vA �2 0: m� 00JKON Wa - wKa��C HO m� c; d wa i�Wm naW� �mJm WJWW 5WM0Lm�J J . . E?Q��� zed, y.y rhr- Deal .. Wlnd Load Live Load nCdtarla D fl' -I _ . _ i VyOA��Y�. �L/]] 3- Dead Load Bay Spacing '.. PLF -IS. �6 iz-lb Z48 - T. tAf- maom r^ _✓ _ o22KgNN .. SO W ir�xW _ 19x9 0#6 U i6 vA �2 0: m� 00JKON Wa - wKa��C HO m� c; d wa i�Wm naW� �mJm WJWW 5WM0Lm�J J '�'oRnIGKS WJi ASKS RnrT-Fu SkPF T 8[arp- 10 IC® A/'Au.S 6,Ar5 5 1BA AIAmS RAFmk Io IN AlAll-S Syppvar &044 to INNAIIS Sv-r5 9 10 NeIIs N_TC 102 e� I �RL1O5. W iTN 2-2X6 I M4S TO (-94,,V L64S To Ro= . 6i- 14 9"FP- 12 !DW A41�-5 - IZ ICd NAIcS oR—� H IP,f AJhi�s r i 130TTOM cgoR0 pi TF 55 z X'{4 DF -JAZ S¢7 .Td 5(-�II1,1 -rA65 00770-x/ C; Oki 2rrCMJ iad V(Ed SP0776 3 'Sim %0m zz_ Ru+S zy�a.e 1 ,-r4 144frABRS OV =+f1�0 CtrPIC44) tx=Dolivi "P4vez 6v wpfen Or kw"L ZY4 WFdb/Ab I f 1 ?x_D�'i8tt 8nrT9M- lis . I � 7-X8 purAALC4 iEP CAo+ . 2XP QON&V »P CuorJuS'— i 27ora 8&" COOS —.7f, zxG 66rNiaiL Zy"Loalb •, ,. aiOwdit - s .. ' �'/Y"srue Boas ymAfVAs�Fls uu) ALL Boer$ ARC4 A�wlwwi �w�t lwdlclIgi-y�ipTbC�1RGAtdu�r �l45 ARS k *Afiwo of 3" 6x prPosr �bn a,Rsa- n CSR oF� i N�k1AIL1F �FC7i(Ai D� TR_ S SPon ij,Vi� �N t tr �b N N N A OQ V u r u C m UI U O w ,a ee o ,ti u m 8 m c rn F C O w U' ? X II y CNS - Z i `p N XiiilO o T! e 41 a. °am��� dommm I o 17 23 2 Ma l oUi mM mm V7 ,-I N e� - mwmm pp" ..3 .2 4 d .moi U J-��I NINRW ry� o w 0 M .1 V��'jI SMR y a o o m U 11 11 11 II ® ^pH w y m E- 0 O F �• = C w s U Y v o aDm m Y V e�,v a m a V�---,,,L/// ��p4 WAS /N0 4 G JOi sO+O m •• A N 'OOm� x�u I �?2 O O u m N O F x u mm w d R 18067 N D v u °o. m.mlv o o Fcu�tR� e N F N N [7 4L X S10NAL' . i sB g�76 Driveway Approach Deviations, relocations or alter- ations to existing or designated driveway approaches in subdivisions will require a right of way permit address- ing storm water engineered configuration and sizing. PROVIDE DIAGRAMS AND ENGINEERING LAYOUTS FOR ROOF TRUSSES, REAMS AND FLOOR SYSTEMS PRIOR TO FRAMING INSPECTIONS THESE PLANS MUST BE KEPT ON THE JOB SITE THIS BUILDING SUBJECT TO FIELD INSPECTION CORRECTIONS il➢iH REV C _T_, ii 7 z yob