2008, 10-07 Permit App: 08002837 Pole BldgProject Number: 08002837 Inv: 1
Application Date: 10/72008 Page 1 oft
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
contact: TOWN & COUNTRY
Penni[ Use: 26 X 48 POLE BLDG Address: 5918 E TRENT AVE
C - S - Z: SPOKANE, WA 99212
Setbacks: Fran[ Left: Right: Rear:
Phone: (509) 535-9016
Group Name:
Project Name:
Site Information: "``-°"""
DistrictSou[
Plat Key: 001838 Name: OPPORTUNITY TR # 01-354
:
Parcel Number: 45201.0944 Block: Lot:
SiteAddress: 10501 E 8TH AVE Owner: Name: BOLLMAN, L P & D M
Address: 10501 E STH AVE
SPOKANE. WA 99206-3506
Location:: CSV
Zoning: R-3 SF Res District
Water District:
Area: .42 Acres Width: 0
Nbr of Bldgs: 0 Nbr of Dwellings: 1
Review Information:
Review
Building Plan Review
Hold: ❑
Depth: 0 Right of Way (it): 0
Released By: — - -- -- —
Originally Released: 10/6/2008 By: tmelbourn
LaoduserLoning/HE Conditions Released BY_ -
GARAGE AND BARN MUST BE TORN DOWN PRIOR TO THE FINAL OF THE PERMIT
originally Released: 10/6/2005 By: mheraois
Permits:
operator: JD Printed By: JD Print Date: 10/72008
Project Number: 08002837 Inv: I Application
Date: 10/72008 Page 2 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Permit Total Fees: $476.06
Notes:
GARAGE AND BARN MUST BE TORN DOWN PRIOR TO THE FINAL OF THE PERMIT -MH
Payment Summary: _
Permit Tvce Fee Amount hlyniCe Amomt Amount Paid Amount Owing
Building Permit $476.06 5476.06 $0.00 S476.06
5476.06 $476.06 $0.00 $476.06
Disclaimer:
Submittal of this application certifies the owner (or peraon(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this anytype of norkany willbe
of
complied with. to
issuance ofa permit shall not be construed to be a permit for, or an approval of,
the provisions of the code or of any other state or local laws or ordinances.
Signature
Operator: JD
Printed BY' JD Print Date: 10/7/2008
Building Permit
Firm:
TOWN & COUNTRY BLDG CONT
Contractor. TOWN & COUNTRY BLDG
(509) 448-8483
Address: 3908 W DAION LN
Phone:
CHENEY, WA 99004
This Application: Total Project:
Description Gtr Tvoe Notes
Ft
.$9_
Valuation S Ft Valuation
1,248 $23,712.00
POLE BDLG U-1 VB
1,248
$23,712.00
Totals: 1,248
$23,712.00 1,248 $23,712.00
Item Dion
Units Unit Desc
Fee Amount
RESIDENTIAL PERMIT FEE
NTI
1 SELECT
$377.25
ACCESSORY PLANS REVIEW
1 SELECT
$94.31
WSBCSURCHARGE
1 SELECT
54,50
Permit Total Fees: $476.06
Notes:
GARAGE AND BARN MUST BE TORN DOWN PRIOR TO THE FINAL OF THE PERMIT -MH
Payment Summary: _
Permit Tvce Fee Amount hlyniCe Amomt Amount Paid Amount Owing
Building Permit $476.06 5476.06 $0.00 S476.06
5476.06 $476.06 $0.00 $476.06
Disclaimer:
Submittal of this application certifies the owner (or peraon(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this anytype of norkany willbe
of
complied with. to
issuance ofa permit shall not be construed to be a permit for, or an approval of,
the provisions of the code or of any other state or local laws or ordinances.
Signature
Operator: JD
Printed BY' JD Print Date: 10/7/2008
Permit Center
y� 010�11707 E Sprague Ave, S 20 106
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
•`'u J • www. okanev 2�QQ
Commrmity Development ` tu'
Residential Construction vtm-1I U"
Permit Application
PERMIT NUMBER b -
PERMIT FEE:
-New Construction
Addition/Remodel
Other:
SITEADDRESS: I0S01rL 9D- Ayr- -�J h!/ 99)G
ASSESSORSPARCELNO: N{30), pgy4 LEGALDESCRIPTION:
Banding Owner -
DIMENSIONS
8 xrd
Name: Leo I'm
TOTAL H (TABLE SPACE:
Nn
Aaaress: E, c
f}vp
City. ksLt
State: A Tp:
Phone: Q� q _
Fax:
Contact Person
Name: (744E uR ETr
Phone: 509 535 016 EAT 2-9
Describe the scope of work in detail:
Proposed Use:
[?/Accessory Bldg
❑ Deck
\ddress: 59/8 EAA" rR'WrAr/e✓aa
Ii<Y.YQCAA/E ✓*iaY State: k/�. Zip:
'hone:6095�w 9W6 Fax. $ort 53// 2$30
;ontracmr Lie No:�WAX$.ris;c6 Exp Date: O61.?ele11
;ity Business Lio.No: - 601 057�P9S
Cost of Project: $ 1'71011
(.., +—N[A_.r..nt annlirsblei•........++ .+rt.....t.
.............. i ne re
HEIGHT TO PEAK
DIMENSIONS
8 xrd
..........,.._-- ---- -- ---
# OF STORIES:
OA/E
TOTAL H (TABLE SPACE:
Nn
1
MAIN FLOOR TO SO.
2 FLOOR SO. FTG:
UNFIN BASEMENT SO. FTG:
IMPERVIOUS SURFACE
FTG: A/ A-
N q
N/A-
AREA vl*
F N SHEDFTG: BASEM lJT
GARA%� SQ. FTb 1�
DECK/CO N TIO SO. FTG:
PROPERTY. ON �o
# OF BEDROOM
Cg,NSTRUCTION TYPE:
HEAT SOURS :
NN
SEWERO� PTIC7
SSEEWW
yy
ro sT FR.}MR
The perritee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling ishvill be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plan nal info "nmay be required to be submitted, and subsequently approved before
this application can be pr0��
SIGNATURE: � DATE:
Mthod of Payme rk
9k Cash Check ❑ Mastercard ❑ NSA
eankcard M Expires: VINM
Authorized Signature:
rEV16EDWH
For City Use Only
PLUS Project Number
Spokane Project Address I l I S °
Valley°
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
,;O*509.688.0036 + Fax: 509.688.0037 * permitcenterCaspokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If to
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK -BUILDING FILE REV W07
Project
Transmittal
Ca'0"
0 Spokane Valley
CommuniV=`elopmeut
Department
11703 E'Sprague Ave, Suite B3
Spokane Valley, WA 99206
NewpuVect
LJ
Predove pre -app meeting
❑
Plan recisions
El
Transmittal Date:
Monday, October 06, 2008
Zoning: R-3 Water District:
Project 9A x aA POLE BLDG
Please send all plan review and project comments via e-mail to the
highlighted individuals.
Project Number: 08002837
Site Address: 10501E 8TH AVE
Parcel Number: 45201.0944
Zoning: R-3 Water District:
Fire District: FD 01
Applicant: TOWN & COUNTRY
Owner.
BOLLMAN, L P & D M
10501 E 8TH AVE
5918 E TRENT AVE
SPOKANE, WA 99206-3506
SPOKANE, WA 99212
(509) 535-9016
e-mail:
e-mail:
Occupant:
Contact: TOWN &COUNTRY
5918 E TRENT AVE
e-mail:
SPOKANE, WA 99212
(509)535-9016
e-mail:
- -
Contractor. TOWN & COUNTRY BLDG CONTR
Arch / Engineer:
-
3908 W DAKIN LN--
CHENEY, WA 99004
- -
(509)448-8483
e-mail:
Project 9A x aA POLE BLDG
Please send all plan review and project comments via e-mail to the
highlighted individuals.
Project Number: 08002837 Inv: 7 Application Date: 7/28/2008 Page 1 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Proiect Information:
Pemdt Use: 26 X 44 POLE BLDG Contact: TOWN & COUNTRY
Address: 5918 E TRENT AVE
C - S - Z: SPOKANE, WA 99212
Setbacks: Front Left: Right: Rear: Phone: (509) 535-9016
Group Name:
Site Information: Project Name:
Plat Key: 001838 Name: OPPORTUNITY TR # 01-354 District: Sout
Parcel Number: 45201.0944 Block: Lot:
SiteAddress: 10501 E 8TH AVE Owner: Name: BOLLMAN, L P & D M
Location:: CSV
Zoning: R-3 SF Res District
Water District
Area: .42 Acres Width: 0
Nbr of Bldgs: 0 Nbr of Dwellings: 1
Review Information:
Review
Building P1a s Review
Originally Released:
Landme/Zoning/HE Conditions
Address: 10501 E STH AVE
SPOKANE, WA 99206-3506
Hold: ❑
Depth: 0 Right Of Way (ft): 0
Released By: t oj
7/222008 By: tmelbourn
I Releesed By _
1037 SF available proposeq 1144 SFS
Originally Released: 7282008 By: M�B��.
ASSIINNGE C
Permits: o\y�LDCC`` &.... 6 %
e/ (rTSzL !� 2QS h4S
792-
/o/bw lgzq
jo
Opersmr. JD Printed By: jmm Print Date: 728/2008
Por"vl qr�)til,m4u Lco X11. w
1o5m e, s9 Aw
c
QQQOJ0O i
ems°' p
ipllel ��na
N(-.
1� /� 5,
i
84-" A"uc
fy Permit aCenter ( /
@2� ] 1707 E Sprague Ave, Slim 106 >� Flo PERMIT NU'S9BER
5061 a►e Spokane Valley, WA 99206 PERMIT FEE:
��Tr+ll.,s,• (509)688-0036 FAX:(509)688\0-0
��''[cllliSS��'' µ,W,w, sookan valley ore
Community Development
Residential Construction ❑ New Construction ❑ Accessory Bldg
Permit Application ❑ Addition/Remodel ❑ Deck
❑ Other:
srrEADDREss: 1oSol
E 9r-"
Ave -4
. ✓MttE� tJs 99_ltl(.
.Name: Leo & I IName:-roWV
411h -
MAIN FLOOR TO SQ.
ASSESSORS PARCEL NO:
461101.
0qq4
LEGAL DESCRIPTION:
Beading Owner.
DIMENSIONS: A OF RIES:
TOTAL H BITABLE SPACE:
Contractor.
.Name: Leo & I IName:-roWV
411h -
MAIN FLOOR TO SQ.
# COUAITRy 6UJZPOgl .TALC,
Address: E C
Ave
A _ N/*-
(P
Address: S9/B E4Sr 7WWr d5V4'E
City: f V*Llf
state: 1,A zip:
30% SLOPES ON
City:—WfAX ✓Ault' state:.k/m 4: f12/2
Phone: Q,. _
Fps
# OF BEDROOM :
1
Phone: 53f *6 Fax: 5C9 63el 2830
SEVVW OR SEPTIC?
64
PosT FR4ME 44-
Contractor Lic No:-r.WA, &rrz;c6 Exp Dare: 06 3e o
Contact Person
City Business Lic. No: (po( 057 41?
Nerve: G BUE.Tr
Phone: Soq 535RAI 016 ExT 2.4
Describe the scope of work in detail: Cost of Project: $
a(' Y4W % 10�f*` i ara.a<P
Proposed Use: &C"-,
*************+The followine MUST be comotete: (write NlAifnot
HEIGHT TO PEAK
DIMENSIONS: A OF RIES:
TOTAL H BITABLE SPACE:
I "
44'x ro.s UNC
411h -
MAIN FLOOR TO SQ.
2 FLOOR SQ. FTG: UNPiN-E&W.MENT SQ. FTG:
IMPERVI US SURFACE
FTG: #V
A _ N/*-
(P
AREA N`¢
FINISHED BASEM T
GARAGE SQ. FTG: DECKtC 10 SQ. FTG:
30% SLOPES ON
FrG: N
yLy O (- N R
1/0A
PROPERTY:
# OF BEDROOM :
1
CONSTRUCTION TYPE: HEAT SOURCE:
SEVVW OR SEPTIC?
64
PosT FR4ME 44-
SE1VO-
The permites verifies, acknowledges and agrees by their signature that t) If this permit is for construction of or on a dwelling, the
dwelling istwill be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) T'-- City o po n ey ern is n a perp or approve r arty vio on o to are ,state or
local laws, codes or ordinances. 6) I s or addrdo information may be required to be submitted, and subsequently approved before
this application can be as . -
SIGNATUR� DATE: 7 Z7'o
Method of Payment
❑ Cash ❑ Check
Bankcard #:
Authorized Signature:
s SEDvImr
0 Mastercard 0 VISA
Expires: VIN#:
11 --- A
Rl
s to6ot E, 8m A,,t
N
C�o
oh
a,,;w5,t -&« 6( c 4t, iT ,
�-ra�
&o
+b aMrrhs
o. +Ue fWA
Valley
Site Address: 10501 E 8TH AVE
Parcel Number., 45201.0944
Project
Transmittal
City of Spokane Valley
Community Development
Department
11703 E. Sprague Ave, Suite 133
Spokane Valley, WA 99206
Zoning: R-3 Water District:
Fire District., FD 01
Applicant: TOWN & COUNTRY
5918 E TRENT AVE
SPOKANE, WA 99212
(509)535-9016
e-mail.,
Newpmject E]
F—iouep—ppmeedog it
p/a mo.ona r'1
Transmittal Date:
Tuesday Juv22.2a08
Project Number: 08002837
Owner. BOLLMAN, L P & D M
10501 E 8TH AVE
SPOKANE. WA 99206-3506
e -mall:
Contact.,
TOWN & COUNTRY
Occupant:
5918 E TRENT AVE
e-mail.,
SPOKANE, WA 99212
(509)535-9016
e-mail:
Contractor.,
TOWN & COUNTRY BLDG CONTR
Arch /Engineer:
3908 W DAKIN LN
CHENEY, WA 99004
(509)448-8483
e-mail:
Project 7R X 44 POI F RI nn
ECEdWErD
JUL 2 2 M
Please send all plan review and project comments via e-mail to the
highlighted individuals.
For City Use Out
CITY OP PLUS Project Number
Project Address
Spokane So
Valley°
11703 E Sprague Ave Suite B-3 1 Spokane valley WA 99206
,,;oO
509.688.0036 1 Fax: 509.688.0037 1 Irermitcenter@spakanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is —y/ll 7`q'
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertisefor dealing with reviewer comments would be the best choicefor the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK -BUILDING FILE nEVM7
i
'Al
5
�a�• Leo aA�
tosa e, lt� Ave.
J}L
5
r
gI il"'Q
M:enJJ
4I.-�
8' aW,,t,F,
WAMBEKE ENGINEERING 2913 East 61" Court
Daniel Wambeke, P. E. Spokane, WA 99223
Telephone: 509-443-6186 • Fax: 509-448-6582 - dwamheke Qmsn.com
STRUCTURAL DESIGN DRAWINGS
FOR
26'X 44'X 10'6" POST FRAME BUILDING
FOR
LEO BOLLMAN
SPOKANE VALLEY, WASHINGTON
JOB NO. 8776
PREPARED FOR
TOWN & COUNTRY BUILDERS, INC.
SPOKANE, WASHINGTON
July 21, 2008
MEMENNe
Designer of Small Structures. Post Frame Buildings, Foundations.
Light Gauge Steel Framing and Grain Storage Systems
19x9 0#6 U i6
vA
�2 0: m�
00JKON
Wa
- wKa��C
HO
m�
c; d
wa
i�Wm
naW�
�mJm
WJWW
5WM0Lm�J
J
.
. E?Q���
zed,
y.y
rhr-
Deal
.. Wlnd Load
Live Load
nCdtarla
D fl'
-I
_ . _ i VyOA��Y�. �L/]] 3-
Dead Load
Bay Spacing
'..
PLF
-IS.
�6 iz-lb
Z48
-
T. tAf-
maom
r^
_✓
_
o22KgNN ..
SO W
ir�xW
_
19x9 0#6 U i6
vA
�2 0: m�
00JKON
Wa
- wKa��C
HO
m�
c; d
wa
i�Wm
naW�
�mJm
WJWW
5WM0Lm�J
J
'�'oRnIGKS
WJi ASKS
RnrT-Fu
SkPF T 8[arp-
10 IC® A/'Au.S
6,Ar5
5 1BA AIAmS
RAFmk
Io IN AlAll-S
Syppvar &044
to INNAIIS
Sv-r5
9 10 NeIIs
N_TC 102
e� I �RL1O5. W iTN
2-2X6 I M4S TO (-94,,V L64S
To Ro= . 6i-
14 9"FP-
12 !DW A41�-5 -
IZ ICd NAIcS oR—�
H IP,f AJhi�s r i
130TTOM cgoR0 pi TF 55
z X'{4 DF -JAZ S¢7 .Td
5(-�II1,1
-rA65 00770-x/ C; Oki 2rrCMJ
iad V(Ed
SP0776
3 'Sim %0m zz_ Ru+S zy�a.e
1 ,-r4 144frABRS OV =+f1�0
CtrPIC44) tx=Dolivi "P4vez
6v wpfen Or kw"L
ZY4
WFdb/Ab I
f 1
?x_D�'i8tt 8nrT9M- lis . I �
7-X8 purAALC4 iEP CAo+ .
2XP QON&V »P CuorJuS'— i
27ora 8&" COOS
—.7f,
zxG 66rNiaiL Zy"Loalb •, ,. aiOwdit - s
..
' �'/Y"srue Boas
ymAfVAs�Fls
uu) ALL Boer$ ARC4 A�wlwwi
�w�t lwdlclIgi-y�ipTbC�1RGAtdu�r
�l45 ARS k *Afiwo of 3"
6x prPosr �bn a,Rsa- n CSR oF�
i
N�k1AIL1F �FC7i(Ai D� TR_ S
SPon
ij,Vi� �N t
tr
�b N N
N A
OQ V u
r u C m
UI U O w
,a ee o ,ti u
m 8 m c
rn F C O
w U' ? X II y
CNS - Z i `p
N XiiilO
o T! e
41
a. °am��� dommm I o
17 23 2 Ma l oUi
mM mm V7 ,-I N
e�
- mwmm pp"
..3 .2 4 d .moi U
J-��I NINRW ry� o w 0 M .1
V��'jI SMR y
a o o m U
11 11 11 II ® ^pH w y
m
E-
0 O F
�• = C
w s U Y
v o aDm m
Y
V
e�,v a m a V�---,,,L/// ��p4 WAS /N0
4 G JOi sO+O m ••
A N 'OOm� x�u I �?2
O O u m N O F
x u mm w d R 18067
N D v u °o. m.mlv o o Fcu�tR�
e N F N N [7 4L X S10NAL'
. i sB g�76
Driveway Approach Deviations, relocations or alter-
ations to existing or designated driveway approaches in
subdivisions will require a right of way permit address-
ing storm water engineered configuration and sizing.
PROVIDE DIAGRAMS AND
ENGINEERING LAYOUTS FOR
ROOF TRUSSES, REAMS AND
FLOOR SYSTEMS PRIOR TO FRAMING
INSPECTIONS
THESE PLANS MUST BE KEPT
ON THE JOB SITE
THIS BUILDING SUBJECT
TO FIELD INSPECTION CORRECTIONS
il➢iH
REV
C
_T_, ii 7 z yob