Loading...
2008, 06-16 Permit App: 08002282 GarageProject Number: 08002281 Inv:I Application Date: 6/16/2008 Page l oft THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: 1, —' Permit Use: 24. 24 DETACHED RESIDENTIAL GARAGE Contact: KITT, ESTHER LAVONNE/ NANCE, S Address: 10509 E STH AVE C - S - Z: SPOKANE VALLEY, WA 99206 Setbacks: Front Left: Right Rear: Phone: (509)926-2231 Group Name: Site Information: Project Name: Plat Key: 001838 Name: OPPORTUNITY TR # 01-354 District: Sant Parcel Number: 45201.0945 Block: Lot: SileAddress: 10509 E STH AVE Owner: Name: KIT -f, ESTHER LAVONNE/ NANC Address: 10509 E 8TH AVE Location:: CSV SPOKANE VALLEY, WA 99206 Zoning: UR -3.5 Urban Residential 3.5 Water District Hold: Area: .53 Acres Width: 0 Depth: 0 Right Of Way (fl): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 1 Review Information: Review Building Plan Review Released By Originally Released: 6/16/2008 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Originally Released: 6/162008 By: mpalaniuk Permits: Operator: jmm Printed By: JD Print Date: 6/162008 Project Number. 08002282 Inv: I Application Date: 6/162008 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit --_ --- Building Permit _ Contractor: OWNER Firm: OWNER Phone: (000)000-0000 Building Characteristic Group: U-1 Type: VB Total Area 575 Building Height 14 Stories 1 Notes: .. , Payment Summary:.. This Application: Total Project: Description Gro Type Notes Sq Ft Valuation Sq Ft Valuation POLE BDLG U-1 VB DETACHED 576 $10,944.00 576 $10,944.00 $248.56 GARAGE Totals: 576 $10,944.00 576 $10,944.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $195.25 ACCESSORY PLANS REVIEW 1 SELECT $48.81 WSBCSURCHARGE 1 SELECT $4.50 Permit Total Fees: $248.56 Notes: .. , Payment Summary:.. Permit Type Fee Amount Invoice Amount Amount Paid Amount Owine Building Permit $248.56 $248.56 $0.00 $248.56 $248.56 $248.56 $0.00 $248.56 Page 2 of 2 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance ofs permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator. jmm Printed By: JD Print Date: 6/162008 '0 Permit Center „ ,- �( \ , ,�""("� ane 11703 E Sprague Ave,Suite; VAL1-EY PERMIT NUMBER: C' .. '"t"' y Spokane Valley, WA 99206' j`, p Valley (509)688-0036 FAX: (509)6 8.A PERMIT FEE: www.spokancva I lev.arf,+` Community Development ,;..K Residential Construction • �,A'' n New Construction , 1 Accessory Bldg Permit Application kY., n Addition/Remodel Deck Other: / SITE ADDRESS: 10 5-0 9 E e 4h ITV spoicc,ne u U Hey f IA/!- ci c/z o 6 ASSESSORS PARCEL NO: 9 5'Z 0 I • O 9 4 S LEGAL DESCRIPTION: Building Owner: stn 1 111 G fOC(1 LC Contractor: Name: S/1(1 I V1 c am n c e Name: Address: /0 5---0 9 C e 1.,h A J e Address: City: Snvkctirle 04 Heil State: wA Zip: 9yZD6 City: State: Zip: Phone: 5-6 ei, y 9 sr:6 0l s Fax: Phone: Fax: Contractor Lic No: Exp Date: Contact Person City Business Lic. No: Name: 5/yl l Ai C lv cs.1C e Phone: .5—c2 q- 17 s"-- I D)81. Describe the scope of work in detail: ! Cost of Project: $ 5 Do, Cp(\SATJC'i"IUA CSP 6P. C Le•cI resic1(.0 ical y[ci9 i Proposed Use: sj-cr, � oc- VA' hIrle5 **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS: #OF STORIES: TOTAL HABITABLE SPACE: Z.4'A Z`I 1 MAIN FLOOR TO SQ. 2No FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: AREA: FINISHED BASEMENT GARAGE SQ. FTG:, t DECK/COV. PATIO SQ. FTG: 30% SLOPES ON SQ. FTG: , 2-75`-`s PROPERTY: #OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER O SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws,codes or ordinances. 6) Plans or additional information may be required to be submitted,and subsequently approved before this application can be processed. SIGNATURE: CS/Lf / DATE: /3J J n 0 e Method of Payment: ❑ Cash 0 Check El Mastercard 0 VISA Bankcard#: Expires: VIN#: Authorized Signature: Effective 10-28-07 Page 1 of 1 C:\Documents and Settings\smith.nance\My Documents\Residential Building Permit App.doc , 7.,.._____. _ 7, 127 I NE 44...L. 1 4 , _‘•0. 4-i• Npeo 4.6 , ...-- • As 4• *1,•104I 1 i 40,32. 66 i 7 1 . I I .094 7 11-41: NJ .,,,,.v,t..„, ...... , :.--, .., , 1 . 1 047 . ifid 1 411,51 66 • c‘J tal„,=== imommanomillall=11111111111111.1111111.11111 1 k For City Use tcnly PLUS Project Number 1,0,c\_? CITY OF Project Address kane r os- -e-- . $4 h All" po 4000 \' 11eValley ct> 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permacenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is C_C (6( c The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review • Submit complete,accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. > Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. > Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents,as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal.This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone,fax,email,or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals,each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings(if required)will be provided by the Permit Specialist at that time. WHITE-APPLICANT PINK-BUILDING FILE REV 9/07 Project Transmittal City of Spokane Palley Commmutp Development Department 11703 E. Sprague Ave, Suite 133 Spokane Palley, WA 99206 Phone 509.688.0036 Site Address: 10509 E 8TH AVE Parcel Number., 45201.0945 Zoning: JR -3.5 Water District: Fire District: FD 01 Applicant: KITT, ESTHER LAVONNE/ NANCE, 10509 E 8TH AVE SPOKANE VALLEY, WA 99206 (509)926-2231 e-mail: Contact: KITT, ESTHER LAVONNE/ NANCE, 10509 E 8TH AVE SPOKANE VALLEY, WA 99206 (509)926-2231 e-mail: Contractor., OWNER ( ) - 0 r rinn.Prr-appme'ung ❑ Plan evvendns ❑ Transmittal Date: Friday, June 13, 2008 Project Number., 08002282 Owner: KITT, ESTHER LAVONNE/ NANCE, 10509 E 8TH AVE SPOKANE VALLEY. WA 99206 e-mail., Occupant: e-mail: Arch / Engineer. - Dtl t JUN i 5 2E00 , Li e-mail: Project 24 x 24 DETACHED RESIDENTIAL GARAGE Description: Please send all plan review and project comments via e-mail to the highlighted individuals. Building Landless Engineer Utilities Health Fire Dist Assessor APPLICATIO CONSTRUCTION PLAN SITE PI-ANE2 To \ \ Please send all plan review and project comments via e-mail to the highlighted individuals. 1201 12 v...1..*- fl Acres»ay S0n0ctaee A' PLANNING DEPT. APPROVED BY:7a� Y /- DA -' /N Exsisting Residence t 10509 E 8H1 Ave Parcel = 45201.0915 1. 81h Ave 90' .y. nx. a,mr