2001, 10-11 Permit: 01008980 Sinkr SPOKANE COUNTY DIVISION OF BUILDING
AND CODE ENFORCEMENT
1026 WEST BROADWAY AVENUE a SPOKANE, WA 99260-0050
SIYM�T(£COIRZIY
Plumbing Permit
Permits
Contractor: OWNER
Group Name:
Project Name:
Licenea: OWNER
SINKS 1
Site Information
Project Information
Site Address:
10516 E8TH AVE
$400
Project Numbcr: 01008980 Inv: 1
Issue Date: 10/11/01
SPOKANE, WA 99206
Tata) Permit Fee:
Permit Use: INSTALL SINK
Parcel Number:
45204.0219
Subdivision:
UNIVERSITY PLACE
Applicant. MALMOE, BRIDGEIT
Block:
Lot:
10516 E8111AVE
SPOKANE, WA 99206
Phone: (509) 710-5151
7.oning:
AGS
Contact: MALMOE, BRIDGETT
Owner.
MALMOE, BRIDGE7T
10516 E AVE
Address:
10516 E8TH AVE
SPOKANE, WA 99206
Phone: (509)710-5151
SPOKANE, WA 99206
Selhacks- Front. Left: Right:
Rear:
Building Inspector:
NONE
Water Dist:
Plumbing Permit
Permits
Contractor: OWNER
Group Name:
Project Name:
Licenea: OWNER
SINKS 1
56.00
PROCESSING FEE
525.00
MINIMUM FEE ADIDSTMENT
$400
Tata) Permit Fee:
S35 00
FOR PLUIvIDING INSPECTIONS CALL (509) 477-3675_
Payment Summary
Total Fees Amoundaid AmountOwine Tran Date ReceitM Payment Amt
$35.00 $3500 $0.00 10/11/01 8135 $35.00
L�7 FILE
Processed By: CUNINENGS, KATHY PERMIT
Printed Bv: WENDEL, GLORIA Page 1 of 1
NOTICE
It Is the responsibility of the appllcantpermittee, not Spokane County, to see to It that the use described on the front of this permit complies with
applicable codes and requirements and that required Inspections are requested- Failure to request required Inspections and obtain the necessary
approvals prior to progressing beyond the point where Inspections are required may necessitate removal of certain parts of the construction at the
applicant 'spermlttee's or property owners expense. At a minimum, the following inspections ARE REQUIRED by County Code.
1. FOOTING - when forms and reinforcement are In place and prior to placement of concrete—all structures, Including manufactured homes -
NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning
regulations. Typically, side and rear yard setbacks are measured from property lines, while setbacks for yards abutting streets are measured from
the property line or the center line come roadway right -op way, whichever provides the greater setback from the center line of the roadway right -of
way. Curb lines and fence lines are net necessarily Indicative of property lines. In some residential areas, the County can own as much as 20 faster
right-of-way between your property and the actual improved street/curb. The responsibility to comply with applicable setback provisions lies solely
with the permittee—neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your
property Imes. Please verity their location prior to locating your structure. Failure to properly locate the .structure may require Its relocation at the
owner'srpermlttee's expense.
2. FOUNDATION - when forms and reinforcement are In place and prior to placement of concrete.
3. FRAMING - after all framing, bracing and blocking is in place, and prior to concealing.
4. INSULATION - prior to the Installation of drywall.
5. PLUMBING- after rough in, before covering, and final.
6. MECHANICAL - rough in of piping, before covering, metal chimneys before concealment, and final.
7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. All permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plant
required by ordinance oras a condition of approval of this permit. Items such as the Installation of fire hydrants, fire department access, on-site
drainage ("208 series"), road improvements, parking, and landscaping are common requirements of a perant/ate plan which must be f om-
pleted prior to final approval of s building or Issuance of a Certificate of Occupancy.
8. MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etcinstalled, and prior to occupancy: completed
inspection record card must be available on site.
9. SEWERS - prior to cover
10. RIGHT-OF-WAIVAPPROACH - prior to placement of concrete, or, it gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which world be concealed by framing, drywall, concrete, etc., must be Inspected
prior to cover. Check with the department for "special inspections" in conjunction with commercial projects.
FOR INSPECTIONS:
TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE .
PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS
FROM MORE THAN ONE AGENCY.
Building, plumbing, mechanical and fire inspections, Division • Road cuts for utilities or driveways. Division of Engineering 8
of Building and Code Enforcement Roads - 48-HOUR NOTICE REQUIRED
477-3676 477-3600
or State Department of Transportation
Construction In a flood plain, Division of Engineering 8 Roads 466-3000
4773600
• Sewer connection, Division of Utilities
• Electrical wiring, State Department of Labor and Industries 477-3604
324-2640 or City Public Works Department
625-6300
• On-site waste disposal system, Spokane Regional Health District
324-1560
PERMIT EXPIRATION AND REFUNDS
Unless otherwise noted, this permit will be considered null and void by limitation if the work authorized by the permit is not commenced oris stopped for
a period of 180 days, unless a written request for an extension of the permit Is received and approved by the Building Official prier to expiration. At a
minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within one year
of the date of expiration for one-half the original fee, subject to certain limitations—please call us If you have any questions.
All refund requests must be made in writing by the applicanVpermittee (shown on the reverse) no later than 180 days after the date of fee payment.
Refunds of not more than 80% of the permit fee paid may be authorized when no work has been done under the permit. No refunds may be authorized
more than 180 days after lee payment.
MISTAKE?
If you think we've made an error byp_rppervang this permit or in conducting inspections pertaining to It, or find erroneous information in the permit, please
bring it 0,zil attention inghlediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to
the Division of Building and Code Enforcement at the below address.
Spokane County Division of Building & Cade Enforcement
1026 West Broadway Avenue
Spokane, WA 99260
Phone: (509) 477-3675 Fax: (509) 477-4703 IDD: (509) 477-7133