Loading...
2000, 09-26 Permit: 00008650 Stove, PipingOF BUILDING AND 1026 WEST BROADWAY AVENUE a SPOKANE, WA 99260-0050 (509) 477-3675 PERMIT Processed By: DAWN DOMPIER SITE INFORMATION PROJECT INFORMATION Site Address: 10613 E8TH AVE Project Number: 00008650 Inv: 1 Issue Date: 0926/2000 AmountOwine SPOKANE, WA 99206 Permit Use: INSTALL GAS STOVE, PIPING Parcel Number: 45201.1045 Subdivision: OPP.TR. 1-354 Applicant: FALCO STOVE SHOP Black: Lnh 9310E SPRAGUEAVE SPOKANE WA 99206 Phone: (509) 926-8911 Zoning: AGS Contact: FALCO STOVE SHOP Owner: BREWSTER, SHANE 9310 E SPRAGUEAVE Address: 10613 E8THAVE SPOKANE WA 99206 Phone: (509)926-8911 SPOKANE, WA 99206 Setbacks -Front: LeB: Right: Rear: Inspector: NONE Water Dish. Group Name: Project Name: PERMIT(S) Mechanical Permit Contractor: FALCO STOVE SHOP Llcenve p: FALCOGC173DU PROCESSINGFEE $25.00 GAS PIPING 1 $1,00 GAS LOG OR GAS INSERT I S1000 PERMIT Processed By: DAWN DOMPIER Printed By: WENDEL, GLORIA Tran Date Recce Payment A. 0926/2000 8144 $36.00 Total Fees Amoun[Paid AmountOwine $36.00 $36.00 $0,00 Total Permit Fee: $36.00 FILE NOTICE It is the responsibility of the applicant permittee, not Spokane County, to see to it that the use described on the front of this permit complies with applicable codes and requirements and that required inspections are requested. Failure to request required inspections and obtain the necessary approvals prior to progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owners expense. At a minimum, the following inspections ARE REQUIRED by County Code: 1. FOOTING - when forms and reinforcement are in place and prior to placement of concrete—all structures, including manufactured homes. NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning regulations. Typically, side and rear yard setbacks are measured from property lines, while setbacks for yards abutting streets are measured from the property line or the center line of the roadway right-of-way, whichever provides the greater setback from the center line of the roadway nghtof- way. Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas, the County con own as much as 20 feet of right-of-way between your property and the actual improved streeccurb. The responsibility to comply with applicable setback provisions lies solely with the permirlee either Spokane County nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owners/perminee's expense. 2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. 3. FRAMING - after all framing, bracing and blocking is in place, and prior to concealing. 4. INSULATION - prior to the installation of drywall. 5. PLUMBING - after rough -in, before covering, and final. 6. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final. 7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. All permits require final Inspection. NOTE: In addition to inspection of Ne structure, this inspection includes review of site Improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, onsite drainage ("208 swells"), road improvements, parking, and landscaping are common requirements of a permit/site plan which must be com- pleted prior to final approval of building or issuance of Certificate of Occupancy. 8. MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etc, installed, and prior to occupancy; completed inspection record card must be available on site. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the department for "special inspections' in conjunction with commercial projects. CALL 477-3675 FOR INSPECTIONS. TO INSURE PROMPT SERVICE, PLEASE GIVE 24 HOUR NOTICE. PG111:1I2F9 JXejCol. F9 UNDER CERTAIN CIRCUMSTANCES, PARTS OF YOUR PROJECT MAY REQUIRE INSPECTIONS FROM OTHER AGENCIES: • Road cuts for utilities or driveways, Division of Engineering 8 Roads • Sewer connection, Division of Utilities 477-3800 477-3604 or State Department of Transportation or City Public Works Department 456-3000 625-6300 • On-site waste disposal system, Spokane Regional Health District • Electrical wiring, State Department of Labor and Industries 324-1560 324-2640 • Construction in a flood plain, Division of Engineering 8 Roads 477-3600 PERMIT EXPIRATION AND REFUNDS Unless otherwise noted, this permit will be considered null and void by limitation if the work authorized by the permit is not commenced or is stopped for a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration. At a minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within one year of the date of expiration for one-half the original fee, subject to certain limitationsylease call us if you have any questions. All refund requests must be made in writing by the applicant/permibee (shown on the reverse) no later than 180 days after the date of fee payment. Refunds of not more than 30% of the permit fee paid may be authorized when no work has been done under the permit. No refunds may be authorized more than 180 days after fee payment. MISTAKEP If you think we've made an error in processing this permit or in conducting inspwtions pertaining to it, or find erroneous informa0on in the permit, please bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to the Division of Building and Code Enforcement at the address found on the face of this permit. I certify that I am the owner or am authorized by the owner to make this application and that I have examined this permil/application, state that the information contained in it and submirletl by me or my agent to compile said permil/application is true and correct, and authorize Spokane County to proceed with processing. In addition, I have read and understand the INSPECTION REQUIREMENTS/NOTICE provisions included herein and agree to comply with same. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. I understand that the issuance of this permit/application and any subsequent inspection approvals or Certificates of Occupancy shall not be construed to give authority to violate or cancel the provisions of any state or local law regulating construction or agreement concerning this property, or as a warranty of conformance with the provisions of any state or local laws regulating construction. SIGNATURE OF APPLICANT/PERMITTEE APPLICATION OR AUTHORIZED AGENT DATE