Loading...
2012, 07-17 Permit: SW-12001768 Sewer SPOKANE CO NTYIBUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-12001768 07/17/2012 Expiration Date: Project Description: SEWER CONNECTION Primary Contact: H&R COMPLETE Project Name: SUTTERS Applicant: H&R COMPLETE Permit Type: SEWER Address: PO BOX 749 NEWMAN LAKE-,WA 99025 Phone: 509-218-8336 Email: SITE INFORMATION: Site Address: 14010 E 9TH CT Owner: PECK, ROBERT E&CHRISTINE A Parcel Number: 45233.3511 Address: 14010 E 9TH CT SPOKANE VALLEY,WA 99037-9695 Subdivision: HERITAGE COURT Phone: Assessor's Description: HERITAGE COURT LT11 BLK 1 Email: Inspection Area: Water District:Vera Fire District:Spokane Valley Fire Irrigation District#15 Zoning: Land Area:9851 Square Feet CONTRACTOR INFORMATION: General Contractor HRCOMI*972DD H&R COMPLETE PO BOX 749 NEWMAN LAKE-,WA 99025 509-218-8336 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $25.94 Utilities Permit $125.00 Total Fee: $150.94 CONDITIONS: Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed:07/17/2012 12:25:30 Printed by:IIS APPPOOL\ASP.NET v4.0 SPOKANE COdNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-12001768 07/17/2012 Expiration Date: INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. _ SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. _ THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME.BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed:07/17/2012 12:25:30 Printed by:IIS APPPOOLWSP.NET v4.0