Loading...
2014, 04-09 Permit App: APR-2014-0008 Approach ��� I1e Development Engineering Stiti .000 Valley 11707 E Sprague Ave Suite 106 • Spokane Valley WA 99206 509.921.1000 ♦ Fax: 509.921.1008 • cityhall@spokanevalley.org Approach Permit Application Review TO: Building Department Site Address: 13005 E Semro Avenue Project No: APR-2014-0008 Accepted Not Accepted Approach X Building Location Paved Access Notes: 1. Approach to be constructed pursuant to City of Spokane Valley Street Standards, Standard Plan R-112. 2. Saw cutting of existing curb to create an approach is not allowed within the City's jurisdiction. 3. Approach is to be inspected by the City's ROW Inspector prior to concrete placement. Reviewed By: d',? % G �� i Date: 200 4_ TRANSITION AREA 3/8' EXPANSION JOINT F 3.5' 3' 3' —PROJECTED TOP OF CURB ELEVATION 6" -r 1/2" LIP 6" PORTLAND CEMENT CONCRETE SECTION A -A GENERAL NOTES L EXPANSION JOINT MATERIAL SHALL BE PLACED IN THE CENTER OF ALL DRIVEWAYS OVER 20' IN WIDTH. 2, EXPANSION JOINT REQUIRED IF POUR INCLUDES ADDITIONAL DRIVEWAY AREA. 3, PORTLAND CEMENT CONCRETE SHALL BE CLASS 3000, AIR ENTRAINED. 4. ALL EXTERNAL EDGES TO BE TROWELLED WITH 1/4" RADIUS EDGER. 5, SIDEWALK TO BE SCORED EVERY 5'. 3/8" EXPANSION JOINT TO BE INSTALLED AT LOCATIONS WHERE SIDEWALK INTERSECTS OTHER SIDEWALKS AND DRIVEWAYS. 6, MIN. 4" THICK CRUSHED SURFACING TOP COURSE LAYER UNDER DRIVE APPROACH. 7. FIRST 2' OF DRIVE APPROACH (AT CURB SIDE) SHALL BE THICKENED TO MATCH BOTTOM OF CURB. THROAT WIDTH DISTANCES TYPE MIN. MAX. COMM. 30' 40' RES. 16' 30' EXPIRES 91/2_9/2 0/ DEVELOPMENTSERVICES SENIOR ENGINEER APPROVED FOR PUBLICATION / 2 Ad e DRIVEWAY APPROACH ADJACENT SIDEWALK STANDARD PLAN NO. R-112 Community Development Department (Staff Use Only) _ Permit Center /� Sokane 11703 East Sprague Avenue, Suite B-3 PERMIT NUMBER: ife—X (,� pSpokane Valley, WA 99206 .E • Vaj/� lley® Tel: (509) 720-5240 Fax: (509) 688-0037 PERMIT FEE: permitcenterOspokanevalley.orq • APPROACH PERMIT APPLICATION PROJECT ADDRESS: / 6'‘6'S� 1 $till r'c; AI; 7- START DATE: 41/0/i Lk ANTICIPATED COMPLETION DATE: S/%5// BUILDING OWNER NAME: At / T, fJ' cz( l� MAILING ADDRESS: / ? C j L L . �'cit! L !/`( , Clef: �� lc a i-(. t' /./C It& STATE: t L' ] ZIP: 4'Y /C CONTACT PERSON NAME: PHONE: c c. I ,c"-- G' i C' FAX: r j( C� ��l ��l l a /lC lr . CELL: f t c4+- CONTRACTOR NAME: /<V1 07, r 4:c s 7 • MAILING ADDRESS: // S 2 I i, , �/ r' -- CITY:S ��c Gl Yu L r C ��� STATE: C6/4 ZIP: C�C� ,) C PHONE: S6 [ — t/ 1( - I S / 6 FAX: CELL: /a7 CONTRACTOR LICENSE#:k. r I C 1<I `[4-157,IV EXPIRES: 7//4CITY BUSINESS LICENSE#: • , PROJECT DESCRIPTION (Please Provide Site Sketch) p(i:a014-4°4 Residential Driveway El Commercial/Industrial Driveway E Existing Curb &Gutter El Rural Road Section El Culvert Installation Ej Sidewalk Repair/Construction 111 Other Conditions: Bond/Insurance certification must be on file with the City. DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling Is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory Is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. Signature Date: - % /L/ P:\Community Development\02 Administration\03 Forms-Official Versions\Permit Center\Approach Permit 2-24-11.doc Page 1 of 2 APPROACH PERMIT APPLICATION - - • REQUIRED SKETCH INFORMATION (Revised 1/25/10) Provide required,measurements (in sketch boxes), and include street name. Check all existing conditions that apply: II 11Sidewalk Drainage Ditch ft wide Drywell (show location on sketch) ft from back of curb Other (please describe below) J]Streetside Swale IA 1 DISTANCE FROM NEAREST PROPERTY LINE MAY BE LEFT OR RIGHT SIDE) ` 1.51 FT(SEE TABLE) a En al CONCRETE APPROACH CURB RETURN 14�N-'- THROAT WIDTH L FT WING I• ` CURB IF CORNER LOT, Aye DISTANCE FROM STREET NAME `' G�t if() • CURB RETURN n FT(SEE TABLE) STREET WITH CURB - • w l DISTANCE FROM • I NEAREST PROPERTY LINE • LAY BE LEFT OR RIGHT SIDE) r FT(SEE TABLE) Eta 0 15'RADIUS RADIUS ASPHALT °-I APPROACH RETURN 1--THROATWID M FT—1 I- -I EDGE OF ASPHALT (SEE -:LE) NIF CORNER LOT, DISTANCE FROM STREET NA I'' RADIUS RETURN 0 FT(SEE TABLE) STREET WITH ASPHALT EDGE Approach Requiremen • Maximum 2 approaches per property frontage; one on arterials. • Total width of approaches not to exceed 50%of frontage width. Residential Commercial Approaches Approaches Distance from Curb/Radius Return 15'minimum 75'minimum Separation between Approaches (measured from centerline to See Page 7-27 centerline of each approach) None specified in City Street Standards Throat Width (flat portion) 16'min., 30'max. 30'min.,40'max. Wing Width (at curb line) 4 feet typical 4 feet typical Minimum Distance from Side Property Line (@ r/w) 5.0' 5.0' Minimum Distance from Crosswalk 5' 5' P:\Community Development\02 Administration\03 Forms-Official Versions\Permit Cent oa • -ermit 2-24-11.doc Page 2 of 2 MQ1'--wc *4": / i ve .. ir .p • __ _. 45272:1542 . _ f . Ii 45272:1541 i` iiiielow t:''''? 1 a 45272:1553 i. , 2E fj C �i 45272. 554 { 12925 0 ' � f �� - *�' v I, e tet . ilEuf asa asr�aarV 45272:1555 Ig aLL I z moiCIO - � Sem ro A �P. A 45272:1804 i. , 31.6 0 15.82 31.6 Feet This map is a user generated static output from an iml . i Internet mapping site and is for reference only. Data layers that appear on this map may or may Onot be accurate,current,or otherwise reliable.