2002, 10-07 Permit: 02008793 Garage;``d.__._SrclenNtCatlnm _.._.
SPOKANE COUNTY DIVISION OF BUILDING
AND CODE ENFORCEMENT
1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050
Group Name -
Project Name
'
Site Information
Project Information
Site Address:
10811 E8TH AVE
Contractor. I.&SCOFSTRUCTION
Project Number: 02008793 Inc: 1
Issue Date: 10!//02
Addition
SPOKANE, WA 99206
624 RESIDENTIAL VALUATION
Permit Use: ATTACHED GARAGE
Parcel Number:
45212.1353
$4.50
DIm:
X SimiesSURCHARGE
'Colal Value: $"1.488.00
RESIDENUALSURCHAROE
Subdivision:
OLD ORCHARD SUB
Applicant L & S CONSTRUCTION
Block:
Lat:
Total Permit Fee:
108N MCCABE
FOR BUILDING INSPECT IONS CALL (509) 477-3675.
Zoning:
UR -3 Urban Residential 3.5
SPOKANE WA 99216
Phone: (509) 928-0169
Payment Summary
Contact L & S CONSTRUCTION
Owner:
MC GOVERN, RANDY
Recce Payment Amt
$172.86
$172.86 $0.00 10(1/02
7842 $172.86
108 N MCCABE
Address:
10811 E 81 H
SPOKANE WA 99216
Phone: (509) 928-0169
SPOKANE, WA 99206
Setbacks - Front 38 Lefts Right:
Rear:
Building Inspector: DAN HOWARD
Water Dist
Group Name -
Project Name
'
Permits
Buifdine PermU
Contractor. I.&SCOFSTRUCTION
License#: LSCON"044CA
Addition
GARAGE U -I VN
624 RESIDENTIAL VALUATION
$13800
STATE
$4.50
DIm:
X SimiesSURCHARGE
'Colal Value: $"1.488.00
RESIDENUALSURCHAROE
530.36
Sq Nt
Grp:
Type:
Total Permit Fee:
$17286
FOR BUILDING INSPECT IONS CALL (509) 477-3675.
Payment Summary
Total Fees
AmountPaid Amount0wine Tran Dale
Recce Payment Amt
$172.86
$172.86 $0.00 10(1/02
7842 $172.86
Ci! P
Processed By: SHATTO, JULIE PERMIT
Printed By: WENDEL, GLORIA Page 1 of 1
NOTICE
It is the responsibility of the appllcant/permiuse, not Spokane County, to see to It that the use described on the front of this permit complies with
applicable codes and requirements and that required Inspections are requested. Failure to request required inspections and obtain the necessary
approvals prior to progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the
applicants/permidee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by County Code.
1. FOOTING - when forms and reinforcement are In place and prior to placement of concrete—all structures, including manufactured homes.
NOTE: This Inspection Includes review of the structure's setbacks from property lines- Minimum setbacks are established by County zoning
regulations. Typically, side and rear yard setbacks are measured from property lines, while setbacks for yards abutting etreete are measured from
the property line or the center line of the roadway right-of-way, whichever provides the greater setback from the center line of the roadway right-of-
way. Curb Imes and fence Imes are not necessarily indicative of property Imes- In some residential areas, the County can own as much as 20 feet of
right-of-way between your property and the actual improved streeUcurb. The responsibility to comply with applicable setback previsions Iles solely
with the permi0ee—reither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your
propedy Imes. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the
owner 'wpermittee's expense.
2. FOUNDATIONwhenforms and reinforcement are In place and prior to placement of concrete.
3. FRAMING - after all framing, bracing and blocking is in place, and prior to concealing.
4. INSULATIONpriorto the Installation of drywall -
5. PLUMBING - after rough in, before covering, and final.
6. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final.
7. FINAL - when complete and prior to occupancy and/or use Please provide 24 hours notice. All permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan)
required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site
drainage ("208 sessions"), road improvements, parking, and landscaping are common requirements of a perim/eite plan which must be cont
plated prior to final approval of a building or Issuance of a Certificate of Occupancy.
8. MANUFACTURED HOMES Final Inspection required when complete, stairs, handrails, adding. etcinstalled, and prior to occupancy, completed
Inspection record card must be available on site.
9. SEWERS prior to cover
10. RIGHT-OF-WAV/APPROACH - prior to placement of concrete, or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected
prior to cover. Check with the department for "special inspections" in conjunction with commercial projects
FORINSPECTIONS:
TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE .
PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS
FROM MORE THAN ONE AGENCY.
• Building, plumbing, mechanical and fire inspections, Division Road cuts for utilities or driveways, Division of Engineering &
of Building and Cede Enforcement Roads - 48-HOUR NOTICE REQUIRED
477-3675 477-3600
or State Department of Transportation
• Construction in a flood plain, Division of Engineering & Roads 456-3000
477-3600
• Sewer connection. Division of Utilities
• Electrical wiring, State Department of Labor and Industries 477-3604
324-2640 or City Public Works Department
• 0.sitewaste disposal system, Spokane Regional Health District 625-6300
324-1560
PERMIT EXPIRATION AND REFUNDS
Unless olherwlee noted, this permit will be considered null and void by limitation if the work authorized by the permit Is not commenced or Is stopped for
a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration- At a
minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within one year
of the date of expiration for one -halt the original fee, subject io certain limitationdiCall us If you have any questions.
All refund requests must be made In writing by the applicantmormittee (shown on the reverse) no later than 180 days atter the date of fee payment.
Refunds of not more than 80% of the permit fee paid may be authorized when no work has been done under the permit No refunds may be authonzed
more than 180 days after fee payment.
MISTAKE?
If you think we've made an error in processing this permit or In conducting Inspections pertaining to It, or find erroneous information in the permit, please
bring it to our attention Immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to
the Division of Building and Code Enforcement at the below address.
Spoke ne Country Division of Building & Code Enforcement
1025 lyes( Broadway Avc"nue
.Spokane, WA 99250
Plmne: (509)477 -?675 Fru: (509) 477-4703 IDD: '509),477-7133