Loading...
HomeMy WebLinkAbout2007, 05-01 Permit: 07001543 ReroofSpokane Valley BUILDING DIVISION 11707 E. Sprague Avenue, Suite 106 Spokane Valley, WA 99206 Site Information Project Information Site Address: 10824 E 8TH AVE Project Number: 07001543 Inv: I Issue Date: 05/01/2007 Permit Use: REROOF Parcel Number: 45213.0602 Subdivision: Block: Lot Zoning: UR -3 Urban Rcsidcrual 3.5 Owner: BRUDOS, KATHLEEN Address: 10824 E8TH AVE SPOKANE VALLEY, WA 99206 Building Inspector: BOB BEBOU'f Water Dist: MODEL Applicant: KODIAK ROOFING CO INC 1504 E SPRAGUE SPOKANE, WA 99202 Contact: KODIAK ROOFING CO INC 1504 E SPRAGUE, SPOKANE, WA 99202 Setbacks - Front: Left: Right: Group Name: Project Name: Phone: (509) 487-9910 Phone: (509)487-9910 Rear: Processed By: Main, Jodi L PERMIT Printed By: Main, Jodi L Page I of 1 Permits Building Penni[ Contractor: KODIAK ROOFING CO INC License 4: KODIARC000D4 REROOF R-3 VD 0 RESIDENTIAL PERMIT FEE $16725 WSBC SURCHARGE $4.50 Total Value: $8,34000 Total Permit Fee: $171,75 FOR BUILDING INSPECTIONS CALL (509) 688-0054. Payment Summary Total Fees AmountPaid AmountOwine Tran Dale Receipt Payment Amt $171.75 5171 75 $0.00 05/01/2007 9430 $171,75 Processed By: Main, Jodi L PERMIT Printed By: Main, Jodi L Page I of 1 NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permidee that the use described on the front of this permit Complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by City Code - FOOTING -when forms and reinforcement are In place and prior to placement of concrete all structures. including manufactured homes. NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Valley Ordinance, Curb lines and fence lines are not necessarily indicative of property Imes. The responsibility to comply with applicable setback provisions Iles solely with the penmiltee-neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verity their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner 's/perrohlee's expense. FOUNDATION – when forms and reinforcement are in place and prior to placement of Concrete. PLUMBING –after rough -in, before covering, and final. MECHANICAL – rough -in of piping, before Covering, metal chimneys before concealment, and final. FRAMING – after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL - when complete and prior to occupancy and/or use. All permits require final aspeclion. NOTE: In addition to inspection of the structure, this Inspection includes review of site Improvements (typically depicted on the approved site plan) required by ordinance or as a Condition of approval of this permit. Items such as the installation of fire hydrants. fire department access, on-site drainage (208'swales), road improvements, parking and landscaping are Common requirements of a permiUsite plan which must be Completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etcinstalled, and prior to occupancy. completed inspection record Card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover. RIGHT-0E-WAYIAPPROACH - prior to placement of concrete/asphalt or, if gravel approach, after Completion. In Full to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, Concrete, etc. must be inspected prior to Cover. Check with the Building depar0nent for `special inspections" in conjunction with Commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and Inspections from more than one agency. Building, plumbing (includes interior reversals for sewer) and mechanical, City of Spokane Valley Building Division 6880054 earand and m:pecliond In a«mrs wi, stale oepaa nee m Laede And mailamea sx26ao Permb ana nryeceora ry an Aid se par in@ne. srokane ae9d1a1 111.11h G-1 31. Road cuts for utilities or driveways, City of Spokane Valley Public Works 688-0195 or State Dept of Transportation 324-6000 Permla and anna n: rw sever Foaaean, Spokane crane Ulatea ax.um File nYarker and arm sinnerear and prate aca:e rwr insadvach . sprkane N Fire Demi—t 8924122 brain!.. RCW Is 122 repave. 1.1 pndr Id any -,at— the CALL BEFORE YOU DIGcenter meal be nda,j. Call nerore you aig al leasl2 rwMm9 a., In a iddell 6 s8tao PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for halt the permit fee based on the value of the remainder of the work to finish the original permit. All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permil fee may be authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized when an application is withdrawn or Cancelled prior to the plan review being completed. Owner / Agent Date Staff Approval Date City of Spokane Valley Building Dept Receipt Receipt Number: 9430 Customer Number Projects Miscellaneous Items Total PAID: $171.75 Tender Full Proiect Nbr Inv Nbr FeeAmt Inv Amt Owine PAID Pmt 07001543 1 $171.75 $171.75 $171.75 $171.75 Payer: Total: $171.75 $171.75 $171.75 $171.75 171.75 Miscellaneous Items Printed. 05/0112007 1:34:06 PM Page I of I Total PAID: $171.75 Tender Type Check Acct Balance CCNbr Exp Date TENDERED VISA xxxxxxxx m4661 12/2008 171.75 Payer: Total TENDERED: 171.75 Over I (Short) $0.00 Change $0.00 Notes: Tran Date/Time: 05/01/2007 1:34:04 PM By: J_main Logon User: bldgdesk Station: CX_SV00015 Override By: Printed. 05/0112007 1:34:06 PM Page I of I